Virginia Code § 10.1-603.25 E directs that priority be given to community-scale projects that use nature-based solutions. The draft scoring does not reflect that priority. In Round 6, named nature-based project types such as wetland restoration, floodplain restoration, and living shorelines earned 25 points, and acquisition earned 30. The Round 7 draft manual awards 20 points for projects that are at least 90% nature-based and 10 points for hybrids. Meanwhile, risk reduction and protection of critical infrastructure together carry 55 points, which gray projects can earn as readily as nature-based ones (Appendix D). We recommend that DCR:
Raise nature-based scoring to at least parity with critical infrastructure protection.
Restore category credit for named nature-based project types, so that wetland restoration, living shorelines, floodplain restoration, and conservation of land with flood resilience value qualify without a percentage calculation.
Define how the nature-based percentage is calculated.
On the last point, the draft does not say whether the 90% threshold is measured by cost, area, function, or something else, or a combination of the above. One judgment can move a project between 20 and 10 points. When we look at the % share of maximum possible points, the draft Round 7 decreases NBS from a 30% share in Round 6 to 18% in the draft manual. We recommend measuring by share of eligible project cost, as Texas and Indiana do in their flood and infrastructure programs, with three rules:
Integral components count: For shoreline projects, the test should be Va. Code § 28.2-104.1, which defines a living shoreline by function rather than materials. The definition allows plants, stone, sand fill, and other structural materials when they are strategically placed to support natural shoreline habitat and coastal processes. Guidance from the Virginia Institute of Marine Science explains how to apply that test. Natural elements should predominate over structural ones. Structures such as sills should be low-profile, porous, and include tidal openings that keep water, sediment, and wildlife moving across the shore. When a project meets that standard, its structural components should count toward the nature-based share. When structure dominates, as in a continuous hard structure or vegetation added to a mostly armored shoreline, it should not. We recommend that DCR adopt the VIMS evaluation questions as the test for classifying shoreline projects, so that a marsh sill designed as part of a living shoreline is not scored as gray infrastructure.
Land risk reduction counts: Acquisition and easement costs for floodplain, wetland, and marsh migration land count as nature-based.
Distributed green infrastructure counts within larger projects: Rain gardens, cisterns, rainwater harvesting, and similar features can support CFPF’s goals when part of a larger community-scale project, such as a blueway or greenway that combines floodwater storage, restored floodplain, and neighborhood-scale features. These components should count toward a project’s nature-based share when applicants show how they add storage and how they will maintain it.
Dam Removal and Habitat Connectivity: Dam removal and the replacement of undersized bridges and culverts with ecological, integrated road-stream crossing designs illustrate the benefits of barrier removal for both aquatic and terrestrial wildlife passage while also improving flood resilience. Terrestrial wildlife passage can be achieved through the addition of dry shelves, or 1.2x bankfull, in aquatic organism passage designs. Higher up front costs for ecological, integrated road-stream crossing designs
are often offset due to their long-term cost savings via increased structure longevity, reduced maintenance, and improved flood event resiliency. In Round 6, dam removal was listed as a nature-based project type eligible for 25 points. We recommend that DCR:
Give dam removal full-nature based credit by category, as in Round 6.
Treat road-stream crossings as hybrid solutions when a clear narrative shows they are designed to pass flood flows and aquatic organisms (and terrestrial wildlife where applicable) using stream simulation or an equivalent geomorphic design approach (e.g., USFS Stream Simulation, 2008; FHWA HEC-26), consistent with the aquatic connectivity objectives of USFWS policy 710 FW 2. At a minimum, qualifying crossings should span at least bankfull width, match the natural channel slope, and contain a designed streambed that matches the adjacent channel and remains stable at design flows.
Recognize restored aquatic and terrestrial habitat connectivity as part of a project’s community benefit given habitat connectivity infrastructure in the form of ecological, integrated road-stream crossings increase resiliency as a co-benefit by design. Measures could include miles of upstream and downstream habitat reconnected and benefits to migratory fish and other aquatic organisms, as well as terrestrial wildlife with priority for barriers identified in the Wildlife Corridor Action Plan (WCAP) or the National Aquatic Connectivity Collaborative (NACC) Inventory & Prioritization Tool. Measures could include how much structure design improves floodwater passage capacity and incorporates substrate/vegetation that helps floodwaters spread out and slow down naturally.
The draft also lists only nature-based match tiers for Projects. We ask DCR to state the match terms for hybrid and other projects.
Resilience plans are the gateway to Project funding and, increasingly, the link between local priorities and the Commonwealth’s statewide planning. We appreciate the improvements in the draft manual, including the requirement for discrete, buildable, ranked projects; the requirement to identify flood mitigation projects funded outside the CFPF; adoption by the governing body; and the five-year renewal criteria (App. E). These changes respond to a real concern. Approved plans vary widely in depth and usefulness, from 12 pages to over 300 (App. E), and some function more as eligibility documents than as working strategies. We offer the following recommendations to make every approved plan a reliable basis for investment.
1. Quantify flood risk. Plans should do more than identify flooded areas. We recommend requiring:
The number and general location of repetitive-loss and severe repetitive-loss properties, as Round 6 required.
The number of structures, critical facilities, and roads exposed to current and future flooding.
Identification of areas with a single evacuation route, a question the draft already asks applicants to consider (Appendix E).
2. Set a common standard for future conditions, and let local data refine it: The draft requires plans to incorporate climate change, sea level rise, and storm surge (Appendix E) but does not say which projections or planning horizons to use. We recommend that plans use the same sea level rise, precipitation, and planning-horizon assumptions as the Coastal Resilience Master Plan and the Virginia Flood Protection Master Plan, along with the data associated with each plan, so local and state plans can be compared and combined. A common standard would allow DCR to compare plans and aggregate them for statewide planning.
Within that standard, localities should be encouraged to use the best local data available and, if they choose, evaluate additional scenarios or longer horizons, such as for critical infrastructure with long design lives. Document and present any local data or additional analysis alongside the common standard, not in place of it.
3. Map natural assets and plan for their protection. Plans should identify the wetlands, floodplains, riparian buffers, and conservation lands that reduce local flood risk, and describe how the locality will protect them through land conservation, easements, or land use controls. These lands do more than store floodwater; conserved floodplains often become parks, trails, and water access points, supporting an outdoor recreation economy. In Executive Directive 3, the Governor described this opportunity as a $14.4 billion industry supporting more than 126,000 jobs. Recognizing that 1) the Commonwealth’s new Director of Outdoor Recreation is now developing a statewide strategy and 2) the Virginia Outdoors Foundation already asks Preservation Trust Fund applicants whether projects advance outdoor recreation priorities and coastal resilience goals, we recommend that resilience plans be positioned to connect with both.
Because floodplains and marshes will shift as sea levels rise and rainfall intensifies, plans should identify where these assets will be in the future, not only where they are today. ConserveVirginia’s Floodplains and Flooding Resilience category offers a starting point. It includes coastal wetlands with the greatest long-term resilience under a projected six feet of sea level rise and areas with the highest marsh migration potential, as identified by the Virginia Institute of Marine Science. We recommend that plans use these data, updated as newer projections become available, to identify lands whose conservation will protect communities and keep public access viable over the life of the plan. Every project on the list should note whether a nature-based alternative was considered.
4. Restore and strengthen the equity analysis. Round 6 required plans to consider “all parts of a locality regardless of socioeconomics or race” and to address “flood resilience needs of underserved populations” (Round 6, App. F, element 3). The draft replaces this with “strive to enhance equity” (Appendix E). While we recognize that there are limitations to SVI, we understand that it is easy for applicants to find their SVI scores through AdaptVA. We recommend restoring the Round 6 language and requiring plans to overlay flood exposure with Social Vulnerability Index and low-income geographic area data at the census block or block group level, rather than relying on regional scores. Plans that include acquisition should address relocation for all residents, including tenants.
5. Connect plans to land use and regulatory tools. Projects alone cannot keep pace with rising risk. Plans should describe the locality’s floodplain ordinance, including any higher standards such as freeboard, and its comprehensive plan and zoning provisions related to flooding. They should also identify regulatory improvements the locality will pursue. This aligns with the draft’s new emphasis on CRS (Appendix. D), since many CRS credits come from these tools.
6. Make plans implementable. For each priority project and action, plans should identify:
The responsible department or partner.
Estimated cost and potential funding sources, including the capital improvement plan.
A target timeline.
A measure of progress.
This lets the five-year look-back required for renewal (App. E) report results against stated goals.
7. Align with hazard mitigation and statewide plans. We recommend that plans cross-reference mitigation actions in the applicable regional hazard mitigation plan. Plans should also enter priority projects in the Virginia Coastal Resilience Web Explorer, or the statewide equivalent outside the coastal region, using consistent project names. This would let DCR draw on approved resilience plans when updating the Coastal Resilience Master Plan and the Virginia Flood Protection Master Plan, so that local planning feeds statewide priorities rather than running parallel to them.
8. Require public engagement. Plans should document how residents of the most flood-prone and vulnerable areas were engaged, and should be available for public comment before adoption.
9. Limit compilation plans to well-documented cases. The draft allows compilation plans built from excerpts of existing documents (Appendix E). We recommend that compilation plans also include a gap analysis showing which criteria the source documents do not meet and how the locality will address them.
10. Publish the review standard. When a CFPF Resilience Plan meets DCR requirements, we ask DCR to publish a hyperlink to the approved plan, the date at which it was approved, and the letter it uses to approve plans. Clear expectations would help localities, especially those without dedicated staff, meet the standard on their first submission, and would make approval consistent across reviewers.
To support these improvements, we recommend that DCR prioritize Capacity Building funding for first-time plans and for plan updates that bring existing plans up to the Round 7 standard. We encourage DCR to track first-time capacity building and capacity applicant rates to align with Governor Spanberger’s Executive Order 19. Higher expectations should come with the resources to meet them.
Implement the 2026 change to the Code: Chapter 995 of the 2026 Acts of Assembly (SB197) amended 10.1-603.25 B, effective July 1, 2026. Interest on Fund loans does not accrue, and repayment obligations do not begin, until the funded project or study is completed or canceled. The draft manual does not mention this and says loan rates are set at closing. We ask DCR (or VRA) to describe the deferral in the manual and explain how it applies to long-term loans and RVRF match loans.
Restore up-front funding tools: Grants are paid by reimbursement. Round 6 offered two ways to cover up-front costs: short-term loans of up to 20% of the grant award, and pre-award and startup costs of up to 25% of the award or $250,000, whichever is less. We ask DCR to restore both. We also renew our request that applicants in low-income geographic areas be allowed, upon request, to receive up to 25% of their award in advance. To inform these decisions, we ask DCR to report how many short-term loans and pre-award draws were made in prior rounds and post them on the website.
Restore the low-income loan rate: Round 6 set low-income area loans at 1.0% plus a 0.2% fee. The Round 7 draft manual sets a single market-based rate with a 1.00% floor and no low-income differential. We recommend restoring a reduced rate option for low-income geographic areas. We are also curious why the long-term loan minimum increased from $250,000 to $500,000 (which may exclude smaller towns).
Explain when a loan may be offered in place of a grant: Neither the Round 6 manual nor the draft describes circumstances in which an applicant who requested a grant may instead be offered a loan, or a combination of a partial grant and a loan. If DCR anticipates making such offers, we ask the manual to describe:
When an offer may be made: For example, based on score, available grant funds, project type, or the applicant’s financial capacity/history.
How low-income geographic areas will be treated: We recommend funding these applicants first, consistent with the Fund’s statutory commitment to these communities. If an application from a low-income geographic area is not awarded a grant, we ask that DCR provide the applicant with a written explanation, identify whether the decision was based on eligibility, scoring criteria, or available funds, and explain what the applicant could address in the next round.
The process for responding: This includes how much time the applicant will have and whether declining the loan will affect future applications.
Publish the funding split: The draft announces $200 million but lists the grant and loan amounts as TBD. Localities size requests and arrange matches differently for grants and loans, so we ask DCR to publish the split before the applications open.
(Continued in Part 3 of 3)