We support rewarding activities that advance CRS enrollment or improve a locality’s classification. As drafted, CRS points are all-or-nothing, and self-certified points must show “significant progress” as a condition of reimbursement. Tying reimbursement to an undefined standard puts a locality’s cash at risk after the work is done. We recommend:
Tiered CRS points, connected to the Activity number/Series Number the applicant is pursuing.
A defined list of acceptable evidence.
Verification by DCR’s CRS coordinator before award, in place of a reimbursement contingency.
The draft expands Capacity Building to include equipment, hardware, software, and technology, and awards up to 20 points for them (Appendix D). The Code limits Fund money to enhancing flood prevention or protection and coastal resilience (§ 10.1-603.25 B). It defines flood prevention or protection as hazard mitigation projects, land acquisition, or land use controls (§ 10.1-603.24). The Virginia Department of Emergency Management’s grant programs better support and align emergency response capabilities.
Award caps: Round 6 capped Project grants at $7.5 million cumulative per applicant. The Round 7 draft lists a $10 million maximum without saying whether it applies per project or per applicant. The $2M Studies and $500,000 Capacity Building ceiling raises the same question. If it applies per applicant, a new locality funding combined efforts such as a resilience plan, an ordinance review, and a staff position could exceed it. We ask DCR to clarify all caps. If the Capacity cap applies per applicant, we recommend exempting development of a first resilience plan, since a plan is required before a locality can apply for Projects (Appendix E).
Regional applicants: The draft states that eligible applicants are local governments and tribes as defined in § 10.1-603.24 (§2.1), and its glossary repeats the Code’s definition of local government. That definition includes any authority, district, commission, or political subdivision created by the General Assembly or pursuant to the Constitution or laws of the Commonwealth (Appendix F). The draft then limits the Project category to localities, allowing regional governments only to coordinate, partner, or serve as third-party administrators (Appendix C and D).
We recommend that DCR remove this limit and allow all local governments, as defined in the Code, to apply in every category. Round 6 did so under the same statute, requiring that projects by authorities, districts, commissions, and other political subdivisions be consistent with the resilience plans of the localities where they take place, with letters of support from those localities. That approach preserved local coordination without excluding entities that already deliver flood mitigation projects, including planning district commissions that administer living shoreline programs and soil and water conservation districts that work across jurisdictional lines. If DCR has concerns about project oversight by these entities, we encourage it to address them through the coordination and support-letter requirements rather than through eligibility.
Prior funding: The draft makes “projects previously funded from any source” ineligible. As written, this would bar phased projects and conflicts with the manual’s allowance for stacking funds. We recommend narrowing it to costs already reimbursed by the Fund, as Round 6 did.
The draft drops the Round 6 project conditions, including:
Requirements that acquired land remain open space in perpetuity.
A relocation pathway for all residents, including tenants.
A 10-year minimum project life.
No-rise certification for work in the regulatory floodway.
It also drops the list of eligible project types, which included easements, the conservation of land identified as having flood resilience value, and, when flood protection is demonstrated, the beneficial reuse of dredged material. If these provisions have moved to the application forms, we ask DCR to say so. If not, we recommend restoring them, prioritizing perpetual protection of acquired land and the tenant relocation pathway. These provisions protect the public investment and the residents affected by it, and they make acquisition a reliable tool for floodplain and marsh migration conservation.
Section 1.1 paraphrases § 10.1-603.25 E as requiring confirmation of recurrent flooding by a “Certified Floodplain Manager or local Floodplain Administrator.” The Code says “locality-certified floodplain manager,” a term it does not define. We ask DCR to quote § 10.1-603.25 E verbatim and to define “locality-certified floodplain manager” in the manual. We recommend that the floodplain administrator designated in the locality’s adopted floodplain ordinance confirm that a project area is subject to recurrent flooding. For Project applications and close-out certificates (§6.4), we recommend review by a Certified Floodplain Manager, who may be locality staff, planning district commission staff, or DCR regional staff, and who is not the project’s designer. We also strongly encourage DCR to make CFM training and exam costs an explicit Capacity Building priority so that every locality can build this expertise over time.
Publish applications and scores: Round 6 stated that all applications would be posted on DCR’s website. The draft does not. The Code requires that a record of each application and the action taken on it be available on a publicly accessible website (§ 10.1-603.25 D.1). We ask DCR to restore that commitment and to publish, with each round’s award results, the final score for each scoring criterion and the classifications that determined each award: nature-based, hybrid, or other designation; low-income geographic area status; the SVI score and area used; and the match rate applied. Publishing scores would help applicants strengthen future proposals and give the public confidence that scoring is applied consistently.
Publish a committee roster, meeting notices, meeting minutes, and round timeline: We renew our requests for a webpage listing Advisory Review Committee members, and for a published timeline for each round, from application deadline through committee review, award announcement, and executed agreements. We also recommend that DCR post notice of each committee meeting on the Virginia Regulatory Town Hall at least 10 business days in advance, and make the committee’s review packet available at least 5 business days before the meeting. This would allow committee members, applicants, and the public a meaningful opportunity to review the materials and follow the committee’s deliberations.
Reconcile RVRF match language: The draft limits RVRF match to the Project category in one place (Appendix A) and says RVRF loans may match “eligible Fund grants” in another (§4.3). We ask DCR to reconcile the two and to clarify where RVRF matches are available statewide.
We support the draft manual’s requirement that all applications avoid adverse impacts or increased flooding elsewhere. This principle protects neighboring properties and is central to responsible flood management. However, the draft manual does not explain how applicants should demonstrate it or how DCR will evaluate it. Appendix B asks for “studies, data, reports” without specifying the type of analysis, the flood events considered, the area evaluated, or what level of change counts as an adverse impact. In Round 6, projects in the regulatory floodway were required to demonstrate no-rise, certified by a Professional Engineer, with a Letter of Map Change required before reimbursement if rise is found.
We recommend that DCR:
Restore the floodway requirement: Reinstate no-rise certification by a Professional Engineer for any work in the regulatory floodway, consistent with NFIP requirements at 44 CFR 60.3(d)(3) and local floodplain ordinances.
Define adverse impact: State that it includes increases in flood elevation, extent, duration, or velocity on other properties, and for shoreline projects, interference with downdrift sediment transport or increased erosion on adjacent shores, consistent with VIMS guidance on living shoreline performance.
Scale the analysis to the project: Hydraulic and hydrologic modeling is appropriate for projects that change conveyance or storage. A narrative and a statement from a Professional Engineer or Certified Floodplain Manager should suffice for acquisitions, plantings, and living shorelines that qualify under the Virginia Marine Resources Commission’s general permits. A proportional approach keeps smaller and nature-based projects from facing modeling costs that exceed their risk.
Specify the events and area evaluated: Identify the flood events to be analyzed, such as the 1% annual chance event and the future conditions used in the applicant’s resilience plan, and require the analysis to cover areas upstream, downstream, and adjacent to the project.
Clarify how the requirement applies to Capacity Building and Studies: Section 2.2 applies it to all applications. We recommend that, for planning and study grants, DCR instead requires that resulting recommendations be evaluated for adverse impacts before implementation.
Identify the reviewer: State whether DCR floodplain staff or the Advisory Review Committee will verify no-adverse-impact submissions, and allow DCR to request additional analysis.
We note the following items for correction before the manual is finalized:
Placeholders for the WebGrants link and the floodplain manager “(OFFICIAL LIST)” (§§3.2, 6.4).
Section 3.3 is missing.
Stale cross-references to “Part IV.B” and “Appendix E” for extensions (Appendix A).
A reference to Appendix F for resilience plan criteria, which now appear in Appendix E (Appendix F).
The application form, quarterly report template, budget template, and extension form, which are not included.
Conflicting wording on authorization: “certify within the application” (Appendix B) versus “included with the application” (Appendix C).
Sincerely,
Mary-Carson Stiff
Executive Director
Wetlands Watch
Emily Steinhilber
Director, Coasts & Watersheds
Environmental Defense Fund
Jay Ford
Virginia Policy Manager
Chesapeake Bay Foundation
Dr. Faith Harris
Executive Director
Virginia Interfaith Power & Light
Pat Calvert
Virginia Director of Conservation
American Rivers
Leslie Anne Hammond
York River Steward
Jamie Goodin
Executive Director
Rockbridge Conservation
Jacqueline Goodrum
Associate Director of Education & Virginia Policy
Chesapeake Legal Alliance
Karen Forget
Executive Director
Lynnhaven River NOW
Jenny Brennan
Senior Policy Analyst
Southern Environmental Law Center
Jamie Brunkow
Director of Advocacy and River Ecology
James River Association
Renee Grebe
Northern Virginia Conservation Advocate
Nature Forward
Ken Wright
Virginia Policy Director
Potomac Conservancy
Trapper Fowler
Habitat Connectivity Director
Wild Virginia
Susan Bates
Coastal Science Program Manager
The Nature Conservancy