11/15/26  9:19 am
Commenter: Wetlands Watch et al.

Re: Round 7 CFPF Draft Manual Part 1
 

November 15, 2026

 

VIA ELECTRONIC SUBMISSION (angela.davis@dcr.virginia.gov)

 

Angela Davis

Division Director, Floodplain Management

600 East Main Street, 24th Floor

Richmond, 23219

 

Re: Round 7 Community Flood Preparedness Fund (CFPF) Draft Manual

 

Dear Angela Davis,

 

On behalf of American Rivers, Chesapeake Bay Foundation, Chesapeake Legal Alliance, Environmental Defense Fund, James River Association, Lynnhaven River NOW, Nature Forward, The Nature Conservancy, Potomac Conservancy, Rockbridge Conservation, Southern Environmental Law Center, Virginia Interfaith Power & Light, Wetlands Watch, Wild Virginia, and the York River Steward, we jointly offer the following comments on the draft 2026 Funding Manual for the Virginia Community Flood Preparedness Fund Round 7 (“draft manual”).

 

Virginia’s Community Flood Preparedness Fund (“CFPF”) program remains one of Virginia's most essential funding tools to address growing flood risks through equitable, science-based, community-scale interventions that prioritize natural solutions. We continue to appreciate the Department of Conservation and Recreation's (“DCR”) ongoing commitment to public engagement and its track record of continually improving the manual over time in response to stakeholder input. 

 

Reading this draft, we were encouraged to see how many changes respond to what localities, tribes, and stakeholders have shared with DCR over the past several rounds. We want to thank DCR for that responsiveness and highlight a few improvements before offering our recommendations.

Changes We Welcome

Increased Funding and award size: The draft manual announces $200 million in available funding, the largest offering in the program’s history. It also raises the grant ceiling to $10 million. We appreciate the Commonwealth’s investment and DCR’s work to put these resources to use in a better-prepared future amid climate change and shifting environmental conditions.

 

Expanded Application Window: We especially appreciate the extended application process, which nearly doubles from the 47 days in Round 6 to 90 days in this proposed Round 7 draft manual. In Round 6, Thanksgiving fell in the final week before the deadline, when applicants are securing signatures and board approvals. The new window still spans the winter holidays, but leaves January and February for governing-body meetings. The added time will help smaller localities and tribes secure authorization and match commitments before the deadline and complete the alternatives analysis.   

 

Capacity Building Staffing: We supported allowing localities one additional round of staffing funds in Round 6 comments, and we appreciate that the draft manual keeps that provision.

 

Resilience Plans: The draft manual offers a reasonable path for localities whose approved plans expired. We appreciate the renewal criteria that ask localities to review their five years of progress and refresh their data. It also gives practical guidance on project lists, debris management, and SD/SI procedures. Requiring plans to identify flood mitigation projects funded outside the CFPF will improve accountability, help prevent duplication, and help state planning initiatives understand the true cost of flood mitigation. 

 

Data and coordination: We appreciate that the draft manual retains the requirement for awardees in the eight easternmost planning districts to enter project information in the Virginia Coastal Resilience Web Explorer. We also appreciate adding a new Department of Environmental Quality representative working within the Stormwater Local Assistance Fund program to the Advisory Review Committee as a small step toward improving oversight and coordination across state funding programs.

 

We offer the following recommendations to build on these improvements:

 

1) Restore the Commonwealth Resilience Planning Principles

In Round 6, the manual opened with the five Commonwealth Resilience Planning Principles from Va. Code § 10.1-602. The manual stated that the Fund would be guided by these principles regardless of region:

  1. Base decision-making on the best available science.

  2. Identify and address socioeconomic inequities, and strive to enhance equity through adaptation and protection measures by considering all areas of recurrent flooding.

  3. Recognize the importance of protecting and enhancing natural infrastructure and nature-based approaches to flood mitigation when possible.

  4. Use community- and regional-scale planning to the maximum extent possible, seeking region-specific approaches tailored to individual communities' needs.

  5. Include an understanding of fiscal realities and focus on cost-effective solutions for protecting and adapting communities, businesses, and critical infrastructure.

The Round 7 draft manual replaces them with three program priorities. Those priorities do keep risk reduction, whole-community resilience, and nature-based solutions, but drop best available science, regional planning, and cost-effectiveness as stated principles.

 

The principles are set in statute, and they give applicants and reviewers a common foundation across all three funding categories. The draft already applies several of them in practice. While resilience plans must use the best available science, and applications are scored in part on cost-effectiveness, restoring the principles would ground those requirements in the Code and make it clear that equity, natural infrastructure, and regional coordination guide the whole program, not just individual scoring criteria.

 

We recommend that DCR restore the Commonwealth Resilience Planning Principles to Part 1 of the manual and state that they will guide the fund. We also encourage aligning scoring criteria with the Commonwealth Resilience Planning Principles to support aligned state planning initiatives while generating metrics that support progress.

 

2) Continue prioritizing equity and make low-income determinations transparent

 

The draft manual lists equity and the Social Vulnerability Index among the factors applications are scored on, but the scoring criteria in Appendix D no longer award points for applications in low-income geographic areas in any category. Round 6 awarded 5 points for Capacity Building & Planning and 10 points for Studies and Project categories; in Round 7, there are no points for Capacity Building & Planning and Studies, and SVI is limited in Projects only to High and Very High scores.

 

Low-income status still determines an applicant's match term rate and counts towards the statutory requirement that at least 25% of the disbursements go to low-income geographic areas (Va. Code § 10.1-603.25 E). Applicants therefore still need to know whether DCR considers their application to be in a low-income geographic area. In Round 6, the application form asked this as a yes-or-no question, with the applicant self-selecting and DCR validating on the scoring sheet. This helps both applicants and the public, as everyone could see how each application was classified. The draft manual includes no application form and no equivalent question.

 

We recognize the challenge of applying low-income and SVI measures consistently when project and benefit areas vary widely in shape and size. Rather than removing these criteria, we encourage DCR to strengthen how it measures them. Clear, consistent methods would let applicants calculate their status with confidence and give reviewers a common basis for comparison. This matters because low-income status will continue to shape match term rates and because a single SVI threshold makes scores more sensitive to how a project area is drawn. We recommend that DCR:

  • Define the benefit area by evidence: The default benefit area should be the census block or blocks where the project is located. Applicants may expand it only to areas where their supporting analysis shows reduced flooding or a documented hydrologic connection.

  • Use one area for every measure: Use the same benefit area, submitted as GIS data, for low-income status, SVI, population benefited, and community scale.

  • Have DCR calculate the scores: DCR should calculate low-income status and a population-weighted SVI for each benefit area, and may rescore applications whose claimed benefits extend beyond what the analysis supports.

  • Restore the scoring: With these safeguards in place, we recommend restoring the low-income criterion as a yes-or-no question and tiered SVI scoring in all three categories, and publishing each application’s classification with the award results.

  • Restore match waivers for low-income geographic areas: Round 6 allowed applicants in low-income geographic areas to request a waiver of the local match for Capacity Building & Planning and Studies grants of $50,000 or less, and for Project grants of $1,000,000 or less. The draft manual does not include this provision. For small and under-resourced localities, even a 5% or 10% match can be the difference between applying and not applying, and the waiver has helped the Fund reach the communities the statute directs it to serve. We recommend restoring the waiver at the Round 6 thresholds. If DCR intends to discontinue it, we ask that the manual say so and explain why.

Finally, the draft defines a low-income geographic area by reference to the state median household income (Appendix F), while the Code uses the local median household income (Va. Code § 10.1-603.24). We ask DCR to align the manual with the Code.

 

3) Measure Flood Risk Reduction Consistently

We support the draft manual’s commitment to “a consistent, transparent, and outcome-focused scoring process” and its emphasis on flood risk reduction and community benefit. To make the scoring criterion work as intended, applicants and reviewers need a shared way to describe and compare flood risk reduction. Applicants have largely described benefits in narrative form, and narratives vary widely in the data they include. This makes applications difficult to compare. It also makes it hard for DCR to show the General Assembly and the public how much flood risk the Fund has reduced. We recommend a standard approach that keeps the application manageable while producing information the Commonwealth can rely on and that informs DCR's duties in updating the Virginia Flood Protection Master Plan, as statutorily required in Code of Va. 10.1-602. 

  1. Adopt a short menu of standard metrics: Applicants would report the metrics that apply to their project, such as:

    1. Structures, residents, and critical facilities removed from or protected against a defined flood event

    2. Repetitive loss and severe repetitive loss properties addressed or removed

    3. Road segments with reduced flooding from a defined flood event

    4. Change in flood depth, extent, or frequency for the design event

    5. Acres of wetland or floodplain conserved or restored, and linear feet of living shoreline 

    6. Floodwater storage volume added

  2. Require project data collection: For projects located within the geographic areas covered by the eight easternmost planning district commissions, funded applicants must submit or update project information in the Virginia Coastal Resilience Web Explorer’s Projects and Initiatives Inventory as a condition of reimbursement. We recommend collecting this data before or at the time of application, similar to the approved resilience plans.  This will support evaluation, ensure plan alignment, and improve understanding of risk reduction. 

  3. Provide tools and a published rubric: We recommend DCR provide a worksheet or simple calculator, accept outputs from FEMA’s Benefit-Cost Analysis, and publish how reported metrics will translate into points within the scoring criteria. Clear expectations help applicants prepare stronger applications and help reviewers score consistently. 

  4. Confirm results at closeout: In conjunction with quarterly and final project reporting, we recommend that final reports restate the standard metrics based on what was built. For a subset of projects, we recommend a simple post-construction verification, such as photo documentation before and after significant storms. Monitoring costs should be an eligible project expense. 

  5. Report outcomes statewide and in state flood plans: We encourage DCR to compile these metrics across rounds, publish them annually, connect them to the Coastal Resilience Master Plan and the Virginia Flood Protection Master Plan, and keep project data in the Coastal Resilience Web Explorer. We also encourage DCR to connect with DWR to update the Wildlife Corridor Action Plan when a CFPF project helps accommodate flood flows and aquatic passage. A consistent record of results would show where the CFPF is reducing risk, inform future rounds, and demonstrate the value of continued investment in the program and the co-benefits that the CFPF brings to communities. 

Other states use similar standard measures. Texas’ State Flood Plan, for example, reports outcomes such as structures and daytime/nighttime population removed from the 1% annual chance floodplain.

(Continued in Part 2 of 3)