Action | Amend Regulations to establish requirements for gravelless material and drip dispersal |
Stage | Emergency/NOIRA |
Comment Period | Ended on 2/26/2014 |
Owners are going to be subject to potentially reducing the lifespan of an onsite system by "allowing" a contractor to "substitute" a system type. Owners should always insist that the construction bid should cover the Actual design as approved by the Regulatory Agency. Any modifications to the existing permitted system should be obtained in writing that explicitly declares what impacts, if any will occur to the "modified" system.