Action | Update the Uniform Statewide Building Code |
Stage | Proposed |
Comment Period | Ended on 6/26/2020 |
The Building Code should require all new petroleum retail facilities to prepare for electric vehicle charging stations by preparing electrical capacity for two level 2 stations (80 amp/240V per station) or one DC Fast Charging station (minimum 100 amp service per station).