11/15/26  11:59 pm
Commenter: Benjamin McFarlane, Hampton Roads Planning District Commission

HRPDC Comments on CFPF Round 7 Manual
 

November 15, 2026

 

Ms. Angela Davis

Division Director, Floodplain Management

Virginia Department of Conservation and Recreation

600 East Main Street, 24th Floor

Richmond, Virginia 23219

 

RE:   Round 7 Community Flood Preparedness Fund (CFPF) Draft Grant Manual 

           

Dear Ms. Davis:

 

The staff of the Hampton Roads Planning District Commission (HRPDC) appreciates the opportunity to provide comments on the Draft 2026 Funding Manual for the Virginia Community Flood Preparedness Fund Round 7, which was posted by the Department of Conservation and Recreation (DCR) for public comment on October 16, 2026. Our comments reflect the views of the HRPDC staff and incorporate feedback from our member jurisdictions and other regional stakeholders. We respectfully request DCR’s consideration of the following comments.

 

Part 1: Program Overview

The draft manual caps the maximum grant amount for capacity building and planning activities at $500,000, the maximum grant amount for studies at $2,000,000, and the maximum grant amount for projects at $10,000,000. Based on previous grant rounds, these caps are lower that what is necessary to fund the types of projects and initiatives that would significantly reduce flood risk in Virginia’s communities. Furthermore, Virginia’s rejoining of the Regional Greenhouse Gas Initiative will provide a level of resources significantly higher than what was available for previous rounds. Therefore, the HRPDC recommends that the cap for grants for capacity building and planning activities and studies be set at $10,000,000 and that the cap for grants for projects should be set at $25,000,000. In addition, the HRPDC recommends that DCR increase the performance period for projects to 60 months and allow requests for longer time periods or the possibility of extensions to account for delays in permitting, contracting, and procurement.

 

Part 2: Eligibility and Requirements

Section 2.3 lists the match requirements for different types of proposals. It is unclear based on what is included if non-nature-based projects or hybrid solutions are eligible. Given the importance of these projects to meaningfully reducing flood risk, the HRPDC recommends clarifying that hybrid and structural or “gray” flood risk reduction projects are eligible and specifying what the match

requirements for those projects will be, assuming they differ from those required for nature-based projects.

 

Local governments without access to direct forms of revenue and rely on grants make use of indirect costs to apportion certain costs between different grants and other sources of funding, typically though the use of an approved Indirect Cost Allocation Plan (ICAP). The HRPDC recommends that DCR reconsider the prohibition on using CFPF funds for indirect costs and instead establish conditions under which such costs could be covered.

 

Section 2.5 states that “projects previously funded from any source” are not eligible for funding. This language is ambiguous. The HRPDC recommends that DCR clarify that the intent is to prevent the duplication of funding for the same scope of work. Specifically, the HRPDC recommends that the Round 7 manual include the same language as the Round 6 manual: “No discrete activity, project, nor portion thereof identified in a previously awarded grant that was reimbursed, or loan that was provided, by the Department or the Authority from the Community Flood Preparedness Fund is eligible for funding.”

 

Part 4: Funding Categories

Section 10.1-603.24 of the Code of Virginia defines local governments as “county, city, town, municipal corporation, authority, district, commission, or political subdivision created by the General Assembly or pursuant to the Constitution of Virginia or laws of the Commonwealth. It is unclear based on the second paragraph of Section 4.3 whether local governments that are not counties, cities, or towns may apply for funding for projects. The manual does not define “regional government,” nor does that term appear in the CFPF’s enabling legislation. The HRPDC recommends that the manual clearly state that all local governments, as defined by Section 10.1-603.24, are eligible to apply for project funding.

 

Section 4.3 refers to the “eight easternmost planning district commissions” when specifying which projects and initiatives shall be included in the Virginia Coastal Resilience Web Explorer’s inventory. To avoid confusion, the HRPDC recommends that the manual list these planning districts by number.

 

Given the increase in funding for Round 7, the HRPDC recommends that DCR reconsider the prohibition on using CFPF loans as match for CFPF grants. The manual specifically allows for loans from the Resilient Virginia Revolving Fund (RVRF) to be used as match. However, the types of projects and areas that are eligible for RVRF have varied considerably across that program’s rounds. Allowing for CFPF loans to match CFPF grants would support better program alignment and ensure that all Virgina local governments can take advantage of the opportunity.

 

Long-term loans with subsidized interest rates are an excellent resource for local governments seeking to maximize the cost-effective use of limited resources for resilient infrastructure. The HRPDC recommends increasing the maximum loan amount for long-term loans to $25,000,000.

 

Part 5: Scoring & Selection

Section 5.1 Evaluation and Scoring Criteria lists five criteria that applications will be scored against. However, it is not clear how the scoring metrics used for each category align with these criteria. The HRPDC recommends that the manual establish specific metrics for each criterion that are appropriate for each category.

 

Appendix B: Supporting Documents

Performing a quantitative benefit-cost analysis for projects is time-consuming, expensive, and burdensome. The HRPDC recommends that the threshold for requiring a benefit-cost analysis be raised from $2,000,000 to $5,000,000.

 

Nature-based solutions, while desirable, may not be feasible for addressing all flood risks. Furthermore, the development of different project alternatives can be a significant and costly undertaking. The HRPDC recommends reconsidering this requirement and that, if a nature-based alternative is required, that it be required only for projects that exceed $5,000,000.

 

Appendix D: Scoring Criteria

The scoring criteria and points lack detail; it is not clear how many points within each criterion will be awarded, or if there is a range of points that may be available. The only criteria that include explanations of how points will be awarded are those related to the Community Rating System. The HRPDC recommends that the manual include detailed descriptions of how each criterion’s points will be determined. In addition, it is also not clear how the percentage of a project that is “nature-based” will be determined. The HRPDC recommends that the manual include a detailed, defensible methodology for how this will be calculated.

 

Appendix F: Glossary

The glossary defines a community-scale project as “a flood prevention and protection project that provides flood mitigation benefits to no less than 25% of the geographic area or population within the designated census block of the project location. For projects whose primary benefit is provided outside of the census block in which the project is physically located, the applicant may designate a different census block to be used in the calculation. This definition includes flood mitigation of critical facilities and infrastructure that have been identified in the regional or state hazard mitigation plan.” This definition does not account for the importance or impact of community infrastructure and facilities to users beyond the immediate area or how they work as part of larger infrastructure and service systems. The HRPDC recommends that this definition be expanded to account for projects that may provide benefits that are not tied to specific census blocks.

 

The glossary defines pluvial flooding as flooding “produced from direct precipitation, which is also known as local intense precipitation. Pluvial flooding occurs when precipitation rates exceed the infiltration capacity of soils and the drainage capacity, resulting in excess runoff and induces flooding.” The HRPDC recommends that this definition explicitly account for stormwater management and/or drainage infrastructure.

 

We appreciate DCR’s efforts in developing and implementing the Community Flood Preparedness Fund and appreciate your consideration of these comments and suggestions. We would be happy to discuss these comments with you further. Please contact Whitney Katchmark (wkatchmark@hrpdcva.gov) or Ben McFarlane (bmcfarlane@hrpdcva.gov) if we can be of any assistance.

 

 

Sincerely,

 

Benjamin J. McFarlane

Chief Resilience Officer

Hampton Roads Planning District Commission

CommentID: 242889