There should be a section that covers timelines and required postings for new equipment installations, much like what is found at this link: https://www.vdh.virginia.gov/radiological-health/radiological-health/x-ray-machine-program/medical-x-ray-machines/.
For example:
Private inspector survey requirements for diagnostic x-ray systems that are transferred between facilities within an institution should also be clarified (i.e., whether to treat it as a new installation or continue on the same schedule of routine surveys the unit was on before transfer) - including whether the requirements are the same for mobile units.