Action | Action to Adopt Regulations for Alternative Onsite Sewage Systems |
Stage | Proposed |
Comment Period | Ended on 2/4/2011 |
Table 5 is entitled "Recommended Field Measurements, Sampling, and Observations". The table contains 7 parameters. Many of the parameter tests are listed as required. What am I missing? Are they recommended or are they required?