Guidance Document Change: This guidance document provides for: 1) a streamlined stormwater management (SWM) plan review process in instances where DEQ is the Virginia Stormwater Management Program (VSMP) authority and 2) a streamlined erosion and sediment control (ESC) plan review process where DEQ is the Virginia Erosion and Sediment Control Program (VESCP) authority when the following conditions are met:
• The SWM and/or ESC plan is prepared by a professional engineer licensed to engage in practice in the Commonwealth under Chapter 4 of Title 54.1 of the Code of Virginia,
• The SWM and/or ESC Plan is pre-reviewed and signed by a person who holds an active certificate as a Dual Combined Administrator for ESC and SWM, and
• A completed Plan Submission Checklist is submitted with the SWM and/or ESC Plan on the cover sheet.
Commenter:
Jonathan Matheny, MWAA
Guidance Memo No. 22-2011