Action | 25-880 - 2024 Amendment and Reissuance of the Existing General Permit Regulation - see action summary- extension of comment period |
Stage | Proposed |
Comment Period | Ended on 10/13/2023 |
Suggest providing options for folks to reduce turbidity since achieving 50 NTU or lower will require chemical treatment (or possibly filtration although not usually practical). NCDOT has a useful guidance doc found at https://connect.ncdot.gov/resources/hydro/HSPDocuments/Appendices.pdf