Mandate 1129
Mandate Information | |||
---|---|---|---|
Mandate Title:
Permits and Variances for Stationary Sources, Locality Particularly Affected
|
|||
Purpose of legislation
Requires the State Air Pollution Control Board to require the applicant to take certain public notice actions, prior to granting any variance to an existing regulation or issuing any permit for (i) a new fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (ii) a major modification to an existing source that is a fossil fuel-fired generating facility with a capacity of 500 megawatts or more, (iii) a new fossil fuel-fired compressor station facility used to transport natural gas, or (iv) a major modification to an existing source that is a fossil fuel-fired compressor station facility used to transport natural gas, if the Board finds that there is a locality particularly affected by such variance or permit.
|
|||
Legislation mandating a change | Chap 1110 (2020) | ||
VAC chapters to be amended |
9 vac 5 - 80 : Permits for Stationary Sources
9 vac 5 - 170 : Regulation for General Administration
|
||
Associated Regulatory Actions |
|
||