Action | Repeal of Authorized Onsite Soil Evaluator Regulations |
Stage | Fast-Track |
Comment Period | Ended on 9/11/2013 |
I absolutely oppose the fast tracking of the Removal of AOSE Regulations. No minimum standards should be removed without first having like standards/guidelines/regulations available and enforceable by our governing body, DPOR. All licensed professionals should be held to the same standards and removing those standards does nothing for the industry and can negatively impact the environment. Something is fishy when a state beaucracy wants to remove existing regulations.