Data Center Variances: Heck NO
 

I strongly don’t support a variance for the data centers to run their diesel generators. Why, well the PWCBS should have required an infrastructure study which would include analyzing the electrical grid, providing recommendations to upgrade the grid and how much it would cost in support of the vast electrical energy data centers require. Thus, PWC residents will have to pay the price to upgrade the electrical grid and pay the price for the generator noise and pollution. The variance proposal is foolish because the Democrat members of the PWCBS want a non-green energy source for their political agenda, but on the other hand advocate/spend to create green energy sources in PWC. Don’t pass this variance!

G. Phillips