Virginia Regulatory Town Hall
Agency
Department of Environmental Quality
 
Board
Air Pollution Control Board
 
chapter
Biomass Energy Generator General Permit for a Pilot Test Facility [9 VAC 5 ‑ 520]
Chapter is Exempt from Article 2 of the Administrative Process Act
Action Biomass Energy Generator General Permit (Rev. Cg)
Stage Proposed
Comment Period Ended on 1/5/2011
spacer
Previous Comment     Back to List of Comments
12/8/10  7:03 pm
Commenter: Peter Thomas

Switching between approved fuels
 

I fully agree with Steve Versen's comments that a farmer or the operator of a biomass energy generation facility should be able to switch between approved fuels with minimal requirements imposed. 

CommentID: 14722