Virginia Regulatory Town Hall

Proposed Text

highlight

Action:
Amendment of Permit Action Fee for Corrective Action
Stage: Fast-Track
 
9VAC20-90-120

9VAC20-90-120. Permit application fee schedules.

TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION.

TYPE OF FACILITY

FEE

All landfills:

 

 

Part A application

$4,180

 

Part B application

$18,680

Incineration/Energy Recovery Facility

$5,880

Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage Facility, or Regulated Medical Waste Treatment Facility

$4,310

Compost Facility

 

 

Facilities Processing Category I Waste

$6,850

 

Facilities Processing Waste Categories I, II, or III, or Categories III and Lower

$10,550

 

Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower

$12,670

Experimental Solid Waste Facility

$2,090

Permit-by-rule Initial Review and Confirmation

$390

Emergency Permit

$2,310

 

TABLE 3.1‑2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.

TYPE OF PERMIT MODULE

FEE

Landfill Part A

$4,180

General - Module I

$390

Facility - Module II

$1,310

Landfill - Module III, IV, or V

$7,050

 

Design plan review

$910

 

Liner design review

$1,960

 

Leachate system review

$1,310

 

Gas management plan review

$1,700

 

Drainage plan review

$910

 

Cover design review

$1,830

 

Equipment

$390

Compost facility - Module VI

$3,660

 

Design plan review

$650

 

Liner design review

$1,310

 

Leachate system review

$910

 

Drainage plan review

$650

 

Equipment

$390

Transfer station - Module VII

$1,180

Material recovery facility - Module VIII

$1,570

 

Waste supply analysis

$650

 

Waste management areas

$520

 

Wastewater management areas

$390

Incinerator/Energy recovery facility - Module IX

$3,000

 

Waste and residue storage

$910

 

Operational requirements

$1,570

 

Waste control procedures

$520

Groundwater monitoring - Module X or XI

$3,260

 

Well placement

$1,310

 

Materials and specifications

$390

 

Sampling plan

$1,570

Closure - Module XII

$390

Post-closure - Module XIII

$390

Corrective action - Module XIV

$22,860 $3,000

Leachate handling Module XV

$1,310

Regulated medical waste storage facility - Module XVI

$390

Regulated medical waste treatment facility - Module XVII

$390

Permit-by-rule Modification Review and Confirmation

$390

Public participation (does not include costs of newspaper advertisements or radio broadcasts)

$1,040

 

TABLE 3.1-3. VARIANCE REQUESTS.

TYPE OF VARIANCE

FEE

Base fee for all variances

$390

Supplemental fees based on variance type

 

 

Exemption from classification as a solid waste

$520

Variance to permitting requirements

 

 

Siting requirements

$520

 

Facility design (other than alternate liner design)

$520

 

Operational requirements

--

 

Groundwater monitoring (other than groundwater protection standards and location of monitoring system)

$920

 

Closure requirements

--

 

Post-closure requirements

--

Groundwater Protection Standards

--

Alternate liner system design

$1,570

Location of groundwater monitoring system

$920