Action | Action to Adopt Regulations for Alternative Onsite Sewage Systems |
Stage | Emergency/NOIRA |
Comment Period | Ended on 5/26/2010 |
Based upon over 25 years of providing operational services for systems with design flows of <1,000 gpd I do not believe annual site visits by a licensed operator be frequent enough. There are a multitude of issues that can arise during a 12 month period that would not be readily visible to an owner but would be ifdentified by an operator that could drastically affect system effluent quality.