Small Renewable Energy Projects (Solar) Permit by Rule [9 VAC 15 ‑ 60]
 
Guidance Documents
 
Chapter Information
Description Establishes a permit by rule for solar energy projects with rated capacity not exceeding 150 megawatts including conditions and standards necessary to protect the Commonwealth’s natural resources.
State Authority Code of Virginia Sections 10.1-1197.5 through 10.1-1197.11
Federal Authority N/A
Text of Regulation Link to Virginia Administrative Code
Goals of Regulation To provide a reasonable degree of certainty and timeliness in the natural-resource protections required of solar-energy projects by setting forth, as fully as practicable, these required protections “up front” in this new permit by rule
Meetings See all meetings (20) relating to this chapter.

Contact Information
Name / Title: Bettina Rayfield 
Address: 1111 E. Main Street, Suite 1400
Richmond, VA 23219
Email Address: bettina.rayfield@deq.virginia.gov
Telephone: (804)659-1915    FAX: ()-    TDD: ()-
Current Actions
Action Title Latest Stage Status
Amend regulations to increase fees assessed by Department of Environmental Quality Permit by Rule Regulations Proposed Comment period is underway and will end on 04/10/2026.

Past Actions
Action Title Latest Stage Status
Amend 9VAC15-60 to include mitigation for forest cores NOIRA Stage complete. Comment period ended 06/18/2025.
Amend 9 VAC 15-60 to comport with the requirements of Chapter 688 of the 2022 Acts of Assembly Final Stage complete. This regulation became effective on 06/18/2025.
9VAC15-60 SNR Name Change
Action is Exempt from Article 2 of the Administrative Process Act
Final Stage complete. This regulation became effective on 11/10/2021.
2019 Amendments Solar PBR Proposed Stage complete. Comment period ended 05/14/2021.
Amendments Mandated by Chapter 368 of the 2017 Acts of Assembly
Action is Exempt from Article 2 of the Administrative Process Act
Final Stage complete. This regulation became effective on 07/01/2017.
Amendment for HB2089 and DEQ address change
Action is Exempt from Article 2 of the Administrative Process Act
Final Stage complete. This regulation became effective on 08/14/2013.
Small Solar Renewable Energy Project Permit Regulation Adoption Final Stage complete. This regulation became effective on 07/18/2012.