The Planning category found within the “Grants Applicability” section of the draft guidelines should be amended to permit funding requests for the development of final designs/engineering associated with an eligible project, if the application can clearly outline and justify the probable case for high scoring potential of a coastal flood prevention and protection project following completion of final designs/engineering. This level of design is required for certain permitting applications, as well as, developing detailed costs and schedules for construction.