Virginia Regulatory Town Hall
Agency
Department of Conservation and Recreation
 
Board
Virginia Soil and Water Conservation Board
 
chapter
Stormwater Management Regulations AS 9 VAC 25-870 [4 VAC 50 ‑ 60]
Action Amend the General Permit for Discharges of Stormwater from Construction Activities found in Part XIV of the Virginia Stormwater Management Permit Program Regulations and its associated definitions found in Part I of those Regulations.
Stage Proposed
Comment Period Ended on 12/26/2008
spacer
Previous Comment     Next Comment     Back to List of Comments
12/26/08  11:01 am
Commenter: Kathy and Frank Collins, Arlington VA

Permit rules for Stormwater discharge from construction sites
 

The rules covering the permits for construction in VA need to be strengthened and even more important, the existing rules need to be enforced.  We see muddy water washing into small streams in Northen VA all the time from large and very small (one house construction sites too are a problem) work areas that are not containing runoff.

thank you for your consideration,

Frank and Kathy Collins

CommentID: 6623