Virginia Regulatory Town Hall
Agency
Department of Environmental Quality
 
Board
State Water Control Board
 
chapter
General VPDES Permit for Discharges of Stormwater from Construction Activities (formerly Part XIV, 4VAC50-60) [9 VAC 25 ‑ 880]
Action 25-880 - 2024 Amendment and Reissuance of the Existing General Permit Regulation - see action summary- extension of comment period
Stage Proposed
Comment Period Ended on 10/13/2023
spacer
Next Comment     Back to List of Comments
10/12/23  3:24 pm
Commenter: Brian Free

Guidance for meeting NTU targets in stormwater discharges
 

Viriginia previously provided guidance for the use of flocculants such as anionic polyacrylamide for treating turbid stormwater on site prior to discharging but there does not appear to be any mention of this treatment technology in the new permit. Given the new, stricter turbidity limits, practitioners will need tools and guidance on how to achieve the new turbidity mandates. The EPA's Construction General Permit provides language on what types of flocculants are allowed in the passive treatment of construction stormwater and dictates eco-toxicity standards for using food grade/ drinking water treatment chemicals.  It also provides guidance on how to test soil types prior to the application of these treatments to make sure the products applied are suitable for flocculating the soil type to which they are applied. Consider adopting language from the EPA's CGP to provide guidance to erosion and sediment control practitioners in Virginia.

CommentID: 220433