Final Text
A. All fees collected by the department pursuant to this chapter shall be deposited into the Virginia Stormwater Management Fund and shall be used and accounted for as specified in § 62.1-44.15:29 of the Code of Virginia. Fees collected by the department shall be exempt from statewide indirect costs charged and collected by the Department of Accounts.
B. All fees collected by a VESMP authority pursuant to this chapter shall be subject to accounting review and shall be used solely to carry out the VESMP authority's responsibilities pursuant to the VESMA, Article 3 (9VAC25-875-100 et seq.) of Part II (9VAC25-875-40 et seq.) and Part V (9VAC25-875-470 et seq.) of this chapter, local ordinances, or standards and specifications.
Pursuant to subdivision A 9 of § 62.1-44.15:28 of the Code of Virginia, whenever the department has authorized the administration of a VESMP by a VESMP authority, 28% 30% of the total revenue generated by the statewide stormwater management fees collected in accordance with 9VAC25-875-1400 shall be remitted on a schedule determined by the department to the State Treasurer for deposit in the Virginia Stormwater Management Fund unless otherwise collected electronically. If the VESMP authority waives or reduces any fee due in accordance with 9VAC25-875-1400, the VESMP authority shall remit the 28% 30% portion that would be due to the Virginia Stormwater Management Fund if such fee were charged in full. Any fee increases established by the VESMP authority beyond the base fees established in this part shall not be subject to the fee distribution formula.
A. Fees set forth in sections 9VAC25-875-1380, 9VAC25-875-1400, and 9VAC25-875-1420 shall be adjusted annually by the change in the Consumer Price Index (CPI). The Consumer Price Index, [ is as used for this adjustment, refers to ] the [ average ] Consumer Price Index for all-urban consumers [ (CPI-U) ] for the 12-month period ending on [ April June ] 30 of the calendar year preceding the year the fee is due. The Consumer Price Index for all-urban consumers is published by the U.S. Department of Labor, Bureau of Labor Statistics, U.S. All items, CUUR0000SA0. [ The department shall calculate the adjusted fees using the CPI by January 1 each year and the adjusted fees shall be effective beginning July 1 of the same year. ]
B. The permit fee due shall be calculated according to the following formulas:

[

]
Where:
F = the permit fee due (in $)
B = the base fee rate for the type of MS4 or Construction General Permit
C = the Consumer Price Index adjustment factor
∆CPI = the difference between [ CPI-U CPI ] and [ 314.54 309.57 ] ,expressed as a proportion of [ 314.54 309.57 ] (the reference base is 1982-84 = 100; [ 314.54 309.57 ] is the unadjusted [ 12-month ] average CPI for all urban consumers for July [ 2023 through June ] 2024)
[CPI-U CPI ] = the [ average of the ] Consumer Price Index for all-urban consumers [ (CUUR0000SA0) ] for the 12-month period ending on [ April June ] 30 of the calendar year preceding the year the fee is due [ , CUUR0000SA0 ] .
For example, if calculating the hypothetical [ 2026 2027 ] permit fee (F) for a General / Stormwater Management – Large Construction Activity/Land Clearing permit (> 5 acres < 10 acres):
[ CPI-U CPI ] = 317.67 (hypothetical [ CPI-U CPI ] for [ April the 12-month period ending on June ] 30, [ 2025 2026 ] , which would be used for the [ 2026 2027 ] permit fee calculation).
∆CPI = [ 0.01 for the 2026 permit fee calculation (i.e., (317.67 – 314.54) / 314.54 = (3.13) / 314.54 = 0.01) 0.03 for the 2027 permit fee calculation (i.e., (317.67 – 309.57) / 309.57 = (8.10) / 309.57 = 0.03) ] .
C = [ 1.01 1.03 ] for the [ 2026 2027 ] permit fee calculation (i.e., 1 + [ 0.01 0.03 ] = [ 1.01 1.03 ] ).
B = $5,100 (i.e. the fee for a General / Stormwater Management – Large Construction Activity/Land Clearing permit (> 5 acres < 10 acres), taken from subsection A of 9VAC25-875-1400).
F = [ $5,151 $5,253 ] for the hypothetical [ 2026 2027 ] permit fee calculation for this General / Stormwater Management – Large Construction Activity/Land Clearing permit (i.e., $5,100 x [ 1.01 1.03 ] = [ $5,150.75 $5,253.00 ] ).
C. Permit fees (F) calculated for each facility or permitted land-disturbing activity shall be rounded to the nearest dollar.
D. The total amount of permit fees collected by the department (permit application fees plus permit maintenance fees) shall not exceed 62% of direct costs for administration, compliance, and enforcement of MS4 permits and VPDES Permits for Discharges of Stormwater from Construction Activities. The director shall take whatever action is necessary to ensure that this limit is not exceeded.
A. The following fee schedule applies to permit applications for issuance of a new individual municipal separate storm sewer system permit or coverage under a MS4 General Permit. All regulated MS4s that apply for joint coverage under an individual permit or general permit registration shall each pay the appropriate fees set out in the following table.
|
Municipal Stormwater / MS4 Individual (Large and Medium) |
|
|
Municipal Stormwater / MS4 Individual (Small) |
|
|
Municipal Stormwater / MS4 General Permit (Small) |
|
B. The amount of the permit fee due for a MS4 permit for a specified year as required by subsection A of this section shall be calculated according to the formulas in 9VAC25-875-1375 B.
The following fee schedule applies to applications for major modification of an individual MS4 permit requested by the permittee:
|
Municipal Stormwater / MS4 Individual (Large and Medium) |
|
|
Municipal Stormwater / MS4 Individual (Small) |
|
A. The following total fees to be paid by an applicant apply to any operator seeking coverage under a General VPDES Permit for Discharges of Stormwater from Construction Activities or a state agency or federal entity that does not file standards and specifications or an individual permit issued by the department. On and after approval by the department of or a VESMP authority for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities, no more than 50% of the total fee to be paid by an applicant set out in this part shall be due at the time that a stormwater management plan or an initial stormwater management plan is submitted for review in accordance with 9VAC25-875-530. The remaining total fee balance to be paid by an applicant shall be due prior to the issuance of coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities.
When a site is purchased for development within a previously permitted common plan of development or sale, the applicant shall be subject to fees ("total fee to be paid by applicant" column) in accordance with the disturbed acreage of the applicant's site according to the following table.
|
Fee type |
Total fee to be paid by applicant (includes both VESMP authority and department portions where applicable) |
Department portion of "total fee to be paid by applicant" (based on |
|
Land-Disturbing Activity in a Chesapeake Bay Preservation Area (not subject to General Permit coverage; sites within designated areas of Chesapeake Bay Act localities with land-disturbance acreage equal to or greater than 2,500 square feet and less than one acre) |
$290 |
$0 |
|
General / Stormwater Management - Small Construction Activity/Land-Disturbing Activity in a Chesapeake Bay Preservation Area (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres) |
$209 |
$0 |
|
General / Stormwater Management - Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures) |
|
|
|
General / Stormwater Management - Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one acre and less than five acres) |
|
|
|
General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres) |
|
|
|
General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres) |
|
|
|
General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres) |
|
|
|
General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres) |
|
|
|
Individual VPDES Permit for Discharges of Stormwater from Construction Activities (This will be administered by the department) |
|
|
|
[ * ] If the project is completely administered by the department such as may be the case[ where the department is the VSMP authority, the VESMP authority ] for a state or federal project [ , ] or projects covered by individual permits, the entire applicant fee shall be paid to the department. |
||
The following fees apply to coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities issued by the department for a state agency or federal entity that has standards and specifications approved by the department.
|
General / Stormwater Management - Phase I Land Clearing (Large Construction Activity - Sites or common plans of development equal to or greater than five acres) |
|
|
General / Stormwater Management - Phase II Land Clearing (Small Construction Activity - Sites or common plans of development equal to or greater than one acre and less than five acres) |
|
B. The amount of the permit fee due for a General VPDES Permit for Discharges of Stormwater from Construction Activities for a specified year as required by subsection A of this section shall be calculated according to the formulas in 9VAC25-875-1375 B.
The following fees apply to modification or transfer of individual permits or of registration statements for the General VPDES Permit for Discharges of Stormwater from Construction Activities issued by the department. If the permit modifications result in changes to stormwater management plans that require additional review by the VESMP authority [ or the department as the VSMP or VESMP authority ] , such reviews shall be subject to the fees set out in this section. The fee assessed shall be based on the total disturbed acreage of the site. In addition to the permit modification fee, modifications resulting in an increase in total disturbed acreage shall pay the difference in the initial permit fee paid and the permit fee that would have applied for the total disturbed acreage in 9VAC25-875-1400. No modification or transfer fee shall be required until such department-approved programs exist. These fees shall only be effective when assessed by a VESMP authority [ ,including or ] the department [ when acting in that capacity, that has been approved by the department as the VSMP or VESMP authority ]. No modification fee shall be required for the General VPDES Permit for Discharges of Stormwater from Construction Activities for a state agency or federal entity that is administering a project in accordance with approved standards and specifications but shall apply to all other state or federal agency projects.
|
General / Stormwater Management – Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures) |
|
|
General / Stormwater Management – Small Construction Activity/Land-Disturbing Activity in a Chesapeake Bay Preservation Area (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the locality is the VESMP authority) |
$20 |
|
General / Stormwater Management – Small Construction Activity/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the department is the VSMP authority) |
$0 |
|
General / Stormwater Management – Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one and less than five acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres) |
|
|
Individual VPDES Permit for Discharges of Stormwater from Construction Activities |
|
A. The following annual permit maintenance fees apply to each permit identified below, including expired permits that have been administratively continued. With respect to the General VPDES Permit for Discharges of Stormwater from Construction Activities, these fees shall apply until the permit coverage is terminated and shall only be effective when assessed by a VESMP authority [ , including or ] the department [ when acting in that capacity that has been approved by the department as the VSMP or VESMP authority ]. No maintenance fee shall be required for the General VPDES Permit for Discharges of Stormwater from Construction Activities for a state agency or federal entity that is administering a project in accordance with approved standards and specifications but shall apply to all other state or federal agency projects. All regulated MS4s that are issued joint coverage under an individual permit or general permit registration shall each pay the appropriate fees set out in the following table:
|
Municipal Stormwater / MS4 Individual (Large and Medium) |
|
|
Municipal Stormwater / MS4 Individual (Small) |
|
|
Municipal Stormwater / MS4 General Permit (Small) |
|
|
Land-Disturbing Activity in a Chesapeake Bay Preservation Area (not subject to General Permit coverage; sites within designated areas of Chesapeake Bay Act localities with land-disturbance acreage equal to or greater than 2,500 square feet and less than one acre) |
|
|
General / Stormwater Management – Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures) |
|
|
General / Stormwater Management – Small Construction Activity/Land-Disturbing Activity in a Chesapeake Bay Preservation Area (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the locality is the VESMP authority) |
|
|
General / Stormwater Management – Small Construction Activity/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the department is the VSMP authority) |
$0 |
|
General / Stormwater Management – Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance equal to or greater than one acre and less than five acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres) |
|
|
General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater 100 acres) |
|
|
Individual VPDES Permit for Discharges from Construction Activities |
|
B. The amount of the annual permit maintenance fee due for a MS4 permit or permit for discharges of stormwater from construction activities for a specified year as required by subsection A of this section shall be calculated according to the formulas in 9VAC25-875-1375 B.