The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Active life" means the period of operation beginning with the initial receipt of solid waste and ending at completion of closure activities required by this chapter.
"Active portion" means that part of a facility or unit that has received or is receiving wastes and that has not been closed in accordance with this chapter.
"Agricultural waste" means all solid waste produced from farming operations.
"Airport" means, for the purpose of this chapter, a military airfield or a public-use airport open to the public without prior permission and without restrictions within the physical capacities of available facilities.
"Aquifer" means a geologic formation, group of formations, or a portion of a formation capable of yielding significant quantities of groundwater to wells or springs.
"Ash" means the fly ash or bottom ash residual waste material produced from incineration or burning of solid waste or from any fuel combustion.
"Base flood" see "Hundred-year flood."
"Bedrock" means the rock that underlies soil or other unconsolidated, superficial material at a site.
"Benchmark" means a permanent monument constructed of concrete and set in the ground surface below the frostline with identifying information clearly affixed to it. Identifying information will include the designation of the benchmark as well as the elevation and coordinates on the local or Virginia state grid system, such as the Virginia State Plane North or Virginia State Plane South.
"Beneficial use" means a use that is of benefit as a substitute for natural or commercial products and does not contribute to adverse effects on health or environment.
"Beneficial use of CCR" means the CCR meet all of the following conditions:
1. The CCR must provide a functional benefit;
2. The CCR must substitute for the use of a virgin material, conserving natural resources that would otherwise need to be obtained through practices such as extraction;
3. The use of the CCR must meet relevant product specifications, regulatory standards, or design standards when available, and when such standards are not available, the CCR is not used in excess quantities; and
4. When unencapsulated use of CCR involving placement on the land of 12,400 tons or more in nonroadway applications, the user must demonstrate and keep records, and provide such documentation upon request, that environmental releases to groundwater, surface water, soil, and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil, and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use.
"Bioremediation" means remediation of contaminated media by the manipulation of biological organisms to enhance the degradation of contaminants.
"Bird hazard" means an increase in the likelihood of bird/aircraft collisions that may cause damage to the aircraft or injury to its occupants.
"Board" means the Virginia Waste Management Board.
"Bottom ash" means ash or slag that has been discharged from the bottom of the combustion unit after combustion.
"Capacity" means the maximum permitted volume of solid waste, inclusive of daily and intermediate cover, that can be disposed in a landfill. This volume is measured in cubic yards.
"Captive industrial landfill" means an industrial landfill that is located on property owned or controlled by the generator of the waste disposed of in that landfill.
"CCR landfill" means an area of land or an excavation that receives CCR and that is not a surface impoundment, an underground injection well, a salt dome formation, a salt bed formation, an underground or surface coal mine, or a cave. For purposes of this chapter, a CCR landfill also includes sand and gravel pits and quarries that receive CCR, CCR piles, and any practice that does not meet the definition of a beneficial use of CCR.
"CCR surface impoundment" means a natural topographic depression, man-made excavation, or diked area that is designed to hold an accumulation of CCR and liquids, and the unit treats, stores, or disposes of CCR.
"Clean wood" means solid waste consisting of untreated wood pieces and particles that do not contain paint, laminate, bonding agents, or chemical preservatives or are otherwise unadulterated.
"Closed facility" means a solid waste management facility that has been properly secured in accordance with the requirements of this chapter.
"Closure" means that point in time when a permitted landfill has been capped, certified as properly closed by a professional engineer, inspected by the department, and closure notification is performed by the department in accordance with 9VAC20-81-160 D.
"Coal combustion byproducts" or "CCB" means residuals, including fly ash, bottom ash, boiler slag, and flue gas emission control waste produced by burning coal. CCB includes both CCR and other non-CCR wastes identified in this definition.
"Coal combustion residuals" or "CCR" means fly ash, bottom ash, boiler slag, and flue gas desulfurization materials generated from burning coal for the purpose of generating electricity by electric utilities and independent power producers. CCR is a specific type of CCB.
"Combustion unit" means an incinerator, waste heat recovery unit, or boiler.
"Commercial waste" means all solid waste generated by establishments engaged in business operations other than manufacturing or construction. This category includes solid waste resulting from the operation of stores, markets, office buildings, restaurants, and shopping centers.
"Compliance schedule" means a time schedule for measures to be employed on a solid waste management facility that will ultimately upgrade it to conform to this chapter.
"Compost" means a stabilized organic product produced by a controlled aerobic decomposition process in such a manner that the product can be handled, stored, or applied to the land without adversely affecting public health or the environment.
"Composting" means the manipulation of the natural process of decomposition of organic materials to increase the rate of decomposition.
"Construction" means the initiation of permanent physical change at a property with the intent of establishing a solid waste management unit. This does not include land-clearing activities, excavation for borrow purposes, activities intended for infrastructure purposes, or activities necessary to obtain Part A siting approval (i.e., advancing of exploratory borings, digging of test pits, groundwater monitoring well installation, etc.).
"Construction/demolition/debris landfill" or "CDD landfill" means a land burial facility engineered, constructed, and operated to contain and isolate construction waste, demolition waste, debris waste, split tires, and white goods or combinations of the above solid wastes.
"Construction waste" means solid waste that is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.
"Contaminated soil" means, for the purposes of this chapter, a soil that, as a result of a release or human usage, has absorbed or adsorbed physical, chemical, or radiological substances at concentrations above those consistent with nearby undisturbed soil or natural earth materials.
"Container" means any portable device in which a material is stored, transported, treated, or otherwise handled and includes transport vehicles that are containers themselves (e.g., tank trucks) and containers placed on or in a transport vehicle.
"Containment structure" means a closed vessel such as a tank or cylinder.
"Convenience center" means a collection point for the temporary storage of solid waste provided for individual solid waste generators who choose to transport solid waste generated on their own premises to an established centralized point, rather than directly to a disposal facility. To be classified as a convenience center, the collection point may not receive waste from collection vehicles that have collected waste from more than one real property owner. A convenience center shall be on a system of regularly scheduled collections.
"Corrective action" means all actions necessary to mitigate the public health or environmental threat from an operating, abandoned, or closed solid waste management facility and to restore the environmental conditions as required. This can include managing elevated landfill temperatures and landfill stability or mitigating a release to the environment of solid waste, landfill gas, leachate, or constituents of solid waste.
"Cover material" means compactable soil or other approved material that is used to blanket solid waste in a landfill.
"Daily disposal limit" means the amount of solid waste that is permitted to be disposed at the facility and shall be computed on the amount of waste disposed during any operating day.
"Debris waste" means wastes resulting from land-clearing operations. Debris wastes include stumps, wood, brush, leaves, soil, and road spoils.
"Decomposed vegetative waste" means a stabilized organic product produced from vegetative waste by a controlled natural decay process in such a manner that the product can be handled, stored, or applied to the land without adversely affecting public health or the environment.
"Demolition waste" means that solid waste that is produced by the destruction of structures and their foundations and includes the same materials as construction wastes.
"Department" means the Virginia Department of Environmental Quality.
"Director" means the Director of the Department of Environmental Quality. For purposes of submissions to the director as specified in the Waste Management Act, submissions may be made to the department.
"Discard" means to abandon, dispose of, burn, incinerate, accumulate, store, or treat before or instead of being abandoned, disposed of, burned, or incinerated.
"Discarded material" means a material that is:
1. Abandoned by being:
a. Disposed of;
b. Burned or incinerated; or
c. Accumulated, stored, or treated (but not used, reused, or reclaimed) before or in lieu of being abandoned by being disposed of, burned, or incinerated; or
2. Recycled used, reused, or reclaimed material as defined in this part.
"Disclosure statement" means a sworn statement or affirmation as required by § 10.1-1400 of the Code of Virginia (see DEQ Form DISC-01 and 02 (Disclosure Statement)).
"Displacement" means the relative movement of any two sides of a fault measured in any direction.
"Disposal" means the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste into or on any land or water so that such solid waste or any constituent of it may enter the environment or be emitted into the air or discharged into any waters.
"Disposal unit boundary" or "DUB" means the vertical plane located at the edge of the waste disposal unit. This vertical plane extends down into the uppermost aquifer. The DUB must be positioned within or coincident to the waste management boundary.
"Elevated temperature landfill (ETLF)" means a municipal solid waste landfill that exhibits temperatures above regulatory thresholds due to abnormal reactions within the waste mass. These reactions can lead to changes in landfill gas composition, noxious odors, rapid waste settlement, degradation of leachate quality, and increased leachate production. Elevated temperature landfills are not landfills that have experienced a fire; ETLFs are characterized by conditions that require different management strategies compared to typical municipal solid waste landfills.
"EPA" means the U.S. Environmental Protection Agency.
"Exempt management facility" means a site used for activities that are conditionally exempt from management as a solid waste under this chapter. The facility remains exempt from solid waste management requirements provided it complies with the applicable conditions set forth in Parts II (9VAC20-81-20 et seq.) and IV (9VAC20-81-300 et seq.) of this chapter.
"Existing CCR landfill" means a CCR landfill that receives CCR both before and after October 19, 2015, or for which construction commenced prior to October 19, 2015, and receives CCR on or after October 19, 2015. A CCR landfill has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction and a continuous onsite, physical construction program had begun prior to October 19, 2015.
"Existing CCR surface impoundment" means a CCR surface impoundment that receives CCR both before and after October 19, 2015, or for which construction commenced prior to October 19, 2015, and receives CCR on or after October 19, 2015. A CCR surface impoundment has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction and a continuous onsite, physical construction program had begun prior to October 19, 2015.
"Expansion" means a horizontal expansion of the waste management boundary as identified in the Part A application. If a facility's permit was issued prior to the establishment of the Part A process, an expansion is a horizontal expansion of the disposal unit boundary.
"Facility" means solid waste management facility unless the context clearly indicates otherwise.
"Facility boundary" means the boundary of the solid waste management facility. For landfills, this boundary encompasses the waste management boundary and all ancillary activities including scales, groundwater monitoring wells, gas monitoring probes, and maintenance facilities as identified in the facility's permit application. For facilities with a permit-by-rule (PBR) the facility boundary is the boundary of the property where the permit-by-rule activity occurs. For unpermitted solid waste management facilities, the facility boundary is the boundary of the property line where the solid waste is located.
"Facility structure" means any building, shed, or utility or drainage line on the facility.
"Fault" means a fracture or a zone of fractures in any material along which strata on one side have been displaced with respect to that on the other side.
"Floodplain" means the lowland and relatively flat areas adjoining inland and coastal waters, including low-lying areas of offshore islands where flooding occurs.
"Fly ash" means ash particulate collected from air pollution attenuation devices on combustion units.
"Food-chain crops" means crops grown for human consumption, tobacco, and crops grown for pasture and forage or feed for animals whose products are consumed by humans.
"Fossil fuel combustion products" means coal combustion byproducts as defined in this regulation, coal combustion byproducts generated at facilities with fluidized bed combustion technology, petroleum coke combustion byproducts, byproducts from the combustion of oil, byproducts from the combustion of natural gas, and byproducts from the combustion of mixtures of coal and "other fuels" (i.e., co-burning of coal with "other fuels" where coal is at least 50% of the total fuel). For purposes of this definition, "other fuels" means waste-derived fuel product, auto shredder fluff, wood wastes, coal mill rejects, peat, tall oil, tire-derived fuel, deionizer resins, and used oil.
"Free liquids" means liquids that readily separate from the solid portion of a waste under ambient temperature and pressure as determined by the Paint Filter Liquids Test, Method 9095, U.S. Environmental Protection Agency, Publication SW-846.
"Garbage" means readily putrescible discarded materials composed of animal, vegetable, or other organic matter.
"Gas condensate" means the liquid generated as a result of gas control or recovery processes at the solid waste management facility.
"Governmental unit" means any department, institution, or commission of the Commonwealth and any public corporate instrumentality thereof, and any district, and shall include local governments.
"Ground rubber" means material processed from waste tires that is no larger than 1/4 inch in any dimension. This includes crumb rubber that is measured in mesh sizes.
"Groundwater" means water below the land surface in a zone of saturation.
"Hazardous constituent" means a constituent of solid waste found listed in Appendix VIII of 9VAC20-60-261.
"Hazardous waste" means a "hazardous waste" as described by the Virginia Hazardous Waste Management Regulations (9VAC20-60).
"Holocene" means the most recent epoch of the Quaternary period, extending from the end of the Pleistocene Epoch to the present.
"Home use" means the use of compost for growing plants that is produced and used on a privately owned residential site.
"Host agreement" means any lease, contract, agreement, or land use permit entered into or issued by the locality in which the landfill is situated that includes terms or conditions governing the operation of the landfill.
"Household hazardous waste" means any waste material derived from households (including single and multiple residences, hotels, motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds, and day-use recreation areas) that, except for the fact that it is derived from a household, would otherwise be classified as a hazardous waste in accordance with 9VAC20-60.
"Household waste" means any waste material, including garbage, trash, and refuse, derived from households. Households include single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds, and day-use recreation areas. Household wastes do not include sanitary waste in septic tanks (septage) that is regulated by other state agencies.
"Hundred-year flood" means a flood that has a 1.0% or greater chance of recurring in any given year or a flood of magnitude equaled or exceeded on the average only once in a hundred years on the average over a significantly long period.
"Inactive CCR surface impoundment" means a CCR surface impoundment that no longer receives CCR on or after October 19, 2015, and still contains both CCR and liquids on or after October 19, 2015.
"Incineration" means the controlled combustion of solid waste for disposal.
"Incinerator" means a facility or device designed for the treatment of solid waste by combustion.
"Industrial waste" means any solid waste generated by manufacturing or industrial process that is not a regulated hazardous waste. Such waste may include waste resulting from the following manufacturing processes: electric power generation; fertilizer/agricultural chemicals; food and related products/byproducts; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing/foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay, and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste.
"Industrial waste landfill" means a solid waste landfill used primarily for the disposal of a specific industrial waste or a waste that is a byproduct of a production process.
"Injection well" means, for the purposes of this chapter, a well or bore hole into which fluids are injected into selected geological horizons.
"Institutional waste" means all solid waste emanating from institutions such as, but not limited to, hospitals, nursing homes, orphanages, and public or private schools. It can include regulated medical waste from health care facilities and research facilities that must be managed as a regulated medical waste.
"Interim cover systems" means temporary cover systems applied to a landfill area when landfilling operations will be temporarily suspended for an extended period (typically, longer than one year). At the conclusion of the interim period, the interim cover system may be removed and landfilling operations resume or final cover is installed.
"Karst topography" means areas where karst terrane, with its characteristic surface and subterranean features, is developed as the result of dissolution of limestone, dolomite, or other soluble rock. Characteristic physiographic features present in karst terranes include sinkholes, sinking streams, caves, large springs, and blind valleys.
"Key personnel" means the applicant itself and any person employed by the applicant in a managerial capacity, or empowered to make discretionary decisions, with respect to the solid waste or hazardous waste operations of the applicant in Virginia, but shall not include employees exclusively engaged in the physical or mechanical collection, transportation, treatment, storage, or disposal of solid or hazardous waste and such other employees as the director may designate by regulation. If the applicant has not previously conducted solid waste or hazardous waste operations in Virginia, the term also includes any officer, director, partner of the applicant, or any holder of 5.0% or more of the equity or debt of the applicant. If any holder of 5.0% or more of the equity or debt of the applicant or of any key personnel is not a natural person, the term includes all key personnel of that entity, provided that where such entity is a chartered lending institution or a reporting company under the Federal Security and Exchange Act of 1934, the term does not include key personnel of such entity. Provided further that the term means the chief executive officer of any agency of the United States or of any agency or political subdivision of the Commonwealth, and all key personnel of any person, other than a natural person, that operates a landfill or other facility for the disposal, treatment, or storage of nonhazardous solid waste under contract with or for one of those governmental entities.
"Lagoon" means a body of water or surface impoundment designed to manage or treat waste water.
"Land-clearing activities" means the removal of flora from a parcel of land.
"Land-clearing debris" means vegetative waste resulting from land-clearing activities.
"Landfill" means a sanitary landfill, an industrial waste landfill, or a construction/demolition/debris landfill.
"Landfill gas" means gas generated as a byproduct of the decomposition of organic materials in a landfill. Landfill gas consists primarily of methane and carbon dioxide.
"Landfill mining" means the process of excavating solid waste from an existing landfill.
"Leachate" means a liquid that has passed through or emerged from solid waste and contains soluble, suspended, or miscible materials from such waste. Leachate and any material with which it is mixed is solid waste; except that leachate that is pumped from a collection tank for transportation to disposal in an offsite facility is regulated as septage, leachate discharged into a waste water collection system is regulated as industrial waste water and leachate that has contaminated groundwater is regulated as contaminated groundwater.
"Lead acid battery" means, for the purposes of this chapter, any wet cell battery.
"Lift" means the daily landfill layer of compacted solid waste plus the cover material.
"Liquid waste" means any waste material that is determined to contain "free liquids" as defined by this chapter.
"Lithified earth material" means all rock, including all naturally occurring and naturally formed aggregates or masses of minerals or small particles of older rock, that formed by crystallization of magma or by induration of loose sediments. This term does not include man-made materials, such as fill, concrete, and asphalt, or unconsolidated earth materials, soil, or regolith lying at or near the earth's surface.
"Litter" means, for purposes of this chapter, any solid waste that is discarded or scattered about a solid waste management facility outside the immediate working area.
"Lower explosive limit" means the lowest concentration by volume of a mixture of explosive gases in air that will propagate a flame at 25°C and at atmospheric pressure.
"MACT AAAA" means National Emissions Standards for Hazardous Air Pollutants: Municipal Solid Waste Landfills contained within 40 CFR 63.1930 through 63.1990. MACT AAAA sets specific requirements for controlling emissions of hazardous air pollutants (HAPs) from MSW landfills.
"Materials recovery facility" means a solid waste management facility for the collection, processing, and recovery of material such as metals from solid waste or for the production of a fuel from solid waste. This does not include the production of a waste-derived fuel product.
"Maximum horizontal acceleration in lithified earth material" means the maximum expected horizontal acceleration depicted on a seismic hazard map, with a 90% or greater probability that the acceleration will not be exceeded in 250 years, or the maximum expected horizontal acceleration based on a site-specific seismic risk assessment.
"Monitoring" means all methods, procedures, and techniques used to systematically analyze, inspect, and collect data on operational parameters of the facility or on the quality of air, groundwater, surface water, and soils.
"Monitoring well" means a well point below the ground surface for the purpose of obtaining periodic water samples from groundwater for quantitative and qualitative analysis.
"Mulch" means woody waste consisting of stumps, trees, limbs, branches, bark, leaves, and other clean wood waste that has undergone size reduction by grinding, shredding, or chipping, and is distributed to the general public for landscaping purposes or other horticultural uses except composting as defined and regulated under this chapter.
"Municipal solid waste" means that waste that is normally composed of residential, commercial, and institutional solid waste and residues derived from combustion of these wastes.
"New CCR landfill" means a CCR landfill or lateral expansion of a CCR landfill that first receives CCR or commences construction after October 19, 2015. A new CCR landfill has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction and a continuous onsite, physical construction program had begun after October 19, 2015. Overfills are also considered new CCR landfills.
"New CCR surface impoundment" means a CCR surface impoundment or lateral expansion of an existing or new CCR surface impoundment that first receives CCR or commences construction after October 19, 2015. A new CCR surface impoundment has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction and a continuous onsite, physical construction program had begun after October 19, 2015.
"New solid waste management facility" means a facility or a portion of a facility that was not included in a previous determination of site suitability (Part A approval).
"Nuisance" means an activity that unreasonably interferes with an individual's or the public's comfort, convenience, or enjoyment such that it interferes with the rights of others by causing damage, annoyance, or inconvenience.
"Offsite" means any site that does not meet the definition of onsite as defined in this part.
"Onsite" means the same or geographically contiguous property, which may be divided by public or private right-of-way, provided the entrance and exit to the facility are controlled by the owner or the operator of the facility. Noncontiguous properties owned by the same person, but connected by a right-of-way that he controls and to which the public does not have access, are also considered onsite property.
"Open burning" means the combustion of solid waste without:
1. Control of combustion air to maintain adequate temperature for efficient combustion;
2. Containment of the combustion reaction in an enclosed device to provide sufficient residence time and mixing for complete combustion; and
3. Control of the combustion products' emission.
"Open dump" means a site on which any solid waste is placed, discharged, deposited, injected, dumped, or spilled so as to present a threat of a release of harmful substances into the environment or present a hazard to human health. Such a site is subject to the Open Dump Criteria in 9VAC20-81-45.
"Operating record" means records required to be maintained in accordance with the facility permit or this part (see 9VAC20-81-530).
"Operation" means all waste management activities at a solid waste management facility beginning with the initial receipt of solid waste for treatment, storage, disposal, or transfer and ceasing with the initiation of final closure activities at the solid waste management facility subsequent to the final receipt of waste.
"Operator" means the person responsible for the overall operation and site management of a solid waste management facility.
"Owner" means the person who owns a solid waste management facility or part of a solid waste management facility.
"PCB" means any chemical substance that is limited to the biphenyl molecule that has been chlorinated to varying degrees or any combination of substances that contain such substance (see 40 CFR 761.3, as amended).
"Perennial stream" means a well-defined channel that contains water year round during a year of normal rainfall. Generally, the water table is located above the streambed for most of the year and groundwater is the primary source for stream flow. A perennial stream exhibits the typical biological, hydrological, and physical characteristics commonly associated with the continuous conveyance of water.
"Permit" means the written permission of the director to own, operate, or construct a solid waste management facility.
"Person" means an individual, corporation, partnership, association, a governmental body, a municipal corporation, or any other legal entity.
"Planning District 8" means the contiguous area within the boundaries of Region 8 established by the Department of Housing and Community Development pursuant to the Regional Cooperation Act (§ 15.2-4200 et seq. of the Code of Virginia).
"Point source" means any discernible, confined, and discrete conveyance, including any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, vessel, or other floating craft, from which pollutants are or may be discharged. Return flows from irrigated agriculture are not included.
"Pollutant" means any substance that causes or contributes to, or may cause or contribute to, environmental degradation when discharged into the environment.
"Poor foundation conditions" means those areas where features exist that indicate that a natural or man-induced event may result in inadequate foundation support for the structural components of a solid waste management facility.
"Postclosure" means the requirements placed upon solid waste disposal facilities after closure to ensure environmental and public health safety for a specified number of years after closure.
"Process rate" means the maximum rate of waste acceptance that a solid waste management facility can process for treatment and storage. This rate is limited by the capabilities of equipment, personnel, and infrastructure.
"Processing" means preparation, treatment, or conversion of waste by a series of actions, changes, or functions that bring about a desired end result.
"Professional engineer" means an engineer licensed to practice engineering in the Commonwealth as defined by the rules and regulations set forth by the Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers and Landscape Architects (18VAC10-20).
"Professional geologist" means a geologist licensed to practice geology in the Commonwealth as defined by the rules and regulations set forth by the Board for Professional Soil Scientists, Wetland Professionals, and Geologists (18VAC145-40).
"Progressive cover" means cover material placed over the working face of a solid waste disposal facility advancing over the deposited waste as new wastes are added keeping the exposed area to a minimum.
"Putrescible waste" means solid waste that contains organic material capable of being decomposed by micro-organisms and cause odors.
"Qualified environmental scientist" means a scientist or engineer who has received a baccalaureate or postgraduate degree in the natural sciences or engineering and has sufficient training and experience in environmental principles and related fields as may be demonstrated by professional certifications or completion of accredited university programs that enable that individual to make sound professional judgments regarding solid waste management facility operations, including landfill gas, leachate, groundwater, elevated temperature landfill conditions, or corrective actions.
"Qualified groundwater scientist" means a scientist or engineer who has received a baccalaureate or postgraduate degree in the natural sciences or engineering and has sufficient training and experience in groundwater hydrology and related fields as may be demonstrated by professional certifications or completion of accredited university programs that enable that individual to make sound professional judgments regarding groundwater monitoring, contaminant fate and transport, and corrective action.
"RCRA" means the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976 (42 USC § 6901 et seq.), the Hazardous and Solid Waste Amendments of 1984, and any other applicable amendments to these laws.
"Reclaimed material" means a material that is processed or reprocessed to recover a usable product or is regenerated to a usable form.
"Refuse" means all solid waste products having the character of solids rather than liquids and that are composed wholly or partially of materials such as garbage, trash, rubbish, litter, residues from clean up of spills or contamination, or other discarded materials.
"Refuse-derived fuel (RDF)" means a type of municipal solid waste produced by processing municipal solid waste through shredding and size classification. This includes all classes of refuse-derived fuel including low-density fluff refuse-derived fuel through densified refuse-derived fuel and pelletized refuse-derived fuel.
"Regulated hazardous waste" means a solid waste that is a hazardous waste, as defined in the Virginia Hazardous Waste Management Regulations (9VAC20-60), that is not excluded from those regulations as a hazardous waste.
"Regulated medical waste" means solid wastes so defined by the Regulated Medical Waste Management Regulations (9VAC20-121) as promulgated by the Virginia Waste Management Board.
"Release" means, for the purpose of this chapter, any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injection, escaping, leaching, dumping, or disposing into the environment solid wastes or hazardous constituents of solid wastes (including the abandonment or discarding of barrels, containers, and other closed receptacles containing solid waste). This definition does not include any release that results in exposure to persons solely within a workplace; release of source, byproduct, or special nuclear material from a nuclear incident, as those terms are defined in the Atomic Energy Act of 1954 (68 Stat. 923); and the normal application of fertilizer. For the purpose of this chapter, release also means substantial threat of release.
"Remediation waste" means all solid waste, including all media (groundwater, surface water, soils, and sediments) and debris, that are managed for the purpose of remediating a site in accordance with 9VAC20-81-45 or Part III (9VAC20-81-100 et seq.) of this chapter or under the Voluntary Remediation Regulations (9VAC20-160) or other regulated remediation program under DEQ oversight. For a given facility, remediation wastes may originate only from within the boundary of that facility, and may include wastes managed as a result of remediation beyond the boundary of the facility. Hazardous wastes as defined in 9VAC20-60, as well as "new" or "as generated" wastes, are excluded from this definition.
"Remediation waste management unit" or "RWMU" means an area within a facility that is designated by the director for the purpose of implementing remedial activities required under this chapter or otherwise approved by the director. An RWMU shall only be used for the management of remediation wastes pursuant to implementing such remedial activities at the facility.
"Responsible official" means one of the following:
1. For a business entity, such as a corporation, association, limited liability company, or cooperative: a duly authorized representative of such business entity if the representative is responsible for the overall operation of one or more operating facilities applying for or subject to a permit. The authority to sign documents must be assigned or delegated to such representative in accordance with procedures of the business entity;
2. For a partnership or sole proprietorship: a general partner or the proprietor, respectively; or
3. For a municipality, state, federal, or other public agency: a duly authorized representative of the locality if the representative is responsible for the overall operation of one or more operating facilities applying for or subject to a permit. The authority to sign documents must be assigned or delegated to such representative in accordance with procedures of the locality.
"Rubbish" means combustible or slowly putrescible discarded materials that include trees, wood, leaves, trimmings from shrubs or trees, printed matter, plastic and paper products, grass, rags, and other combustible or slowly putrescible materials not included under the term "garbage."
"Runoff" means any rainwater, leachate, or other liquid that drains over land from any part of a solid waste management facility.
"Run-on" means any rainwater, wastewater, leachate, or other liquid that drains over land onto any part of the solid waste management facility.
"Salvage" means the authorized, controlled removal of waste materials from a solid waste management facility.
"Sanitary landfill" means an engineered land burial facility for the disposal of household waste that is so located, designed, constructed, and operated to contain and isolate the waste so that it does not pose a substantial present or potential hazard to human health or the environment. A sanitary landfill also may receive other types of solid wastes, such as commercial solid waste, nonhazardous sludge, hazardous waste from very small quantity generators, construction demolition debris, and nonhazardous industrial solid waste.
"Saturated zone" means that part of the earth's crust in which all voids are filled with water.
"Scavenging" means the unauthorized or uncontrolled removal of waste materials from a solid waste management facility.
"Scrap metal" means metal parts such as bars, rods, wire, empty containers, or metal pieces that are discarded material and can be used, reused, or reclaimed.
"Secondary containment" means an enclosure into which a container or tank is placed for the purpose of preventing discharge of wastes to the environment.
"Seismic impact zone" means an area with a 10% or greater probability that the maximum horizontal acceleration in lithified earth material, expressed as a percentage of the earth's gravitational pull (g), will exceed 0.10g in 250 years.
"Semiannual" means an interval corresponding to approximately 180 days. For the purposes of scheduling monitoring activities, sampling within 30 days of the 180-day interval will be considered semiannual.
"Site" means all land and structures, other appurtenances, and improvements on them used for treating, storing, and disposing of solid waste. This term includes adjacent land within the facility boundary used for the utility systems such as repair, storage, shipping or processing areas, or other areas incident to the management of solid waste.
"Sludge" means any solid, semi-solid or liquid waste generated from a municipal, commercial or industrial wastewater treatment plant, water supply treatment plant, or air pollution control facility exclusive of treated effluent from a wastewater treatment plant.
"Small landfill" means a landfill that disposed of 100 tons/day or less of solid waste during a representative period prior to October 9, 1993, and did not dispose of more than an average of 100 tons/day of solid waste each month between October 9, 1993, and April 9, 1994.
"Solid waste" means any of those materials defined as "solid waste" in 9VAC20-81-95.
"Solid waste disposal facility" means a solid waste management facility at which solid waste will remain after closure.
"Solid waste management facility" or "SWMF" means a site used for planned treating, storing, or disposing of solid waste. A facility may consist of several treatment, storage, or disposal units.
"Special wastes" means solid wastes that are difficult to handle, require special precautions because of hazardous properties, or the nature of the waste creates waste management problems in normal operations. (See Part VI (9VAC20-81-610 et seq.) of this chapter.)
"Speculatively accumulated material" means any material that is accumulated before being used, reused, or reclaimed or in anticipation of potential use, reuse, or reclamation. Materials are not being accumulated speculatively when they can be used, reused, or reclaimed, have a feasible means of use, reuse, or reclamation available and 75% of the materials accumulated are being removed from the facility annually.
"State waters" means all water, on the surface and under the ground, wholly or partially within, or bordering the Commonwealth, or within its jurisdiction.
"Storage" means the holding of waste, at the end of which the waste is treated, disposed, or stored elsewhere.
"Structural fill" means an engineered fill with a projected beneficial end use, constructed using soil or fossil fuel combustion products, when done in accordance with this chapter, spread and compacted with proper equipment, and covered with a vegetated soil cap.
"Sudden event" means a one-time, single event such as a sudden collapse or a sudden, quick release of contaminants to the environment. An example would be the sudden loss of leachate from an impoundment into a surface stream caused by failure of a containment structure.
"Surface impoundment" or "impoundment" means a facility or part of a facility that is a natural topographic depression, man-made excavation, or diked area formed primarily of earthen materials (although it may be lined with man-made materials), that is designed to hold an accumulation of liquid wastes or wastes containing free liquids and that is not an injection well.
"Surface waters" means all state waters that are not groundwater as defined in § 62.1-255 of the Code of Virginia.
"SW-846" means Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, EPA Publication SW-846, Second Edition, 1982 as amended by Update I (April, 1984), and Update II (April, 1985) and the third edition, November, 1986, as amended.
"Tank" means a stationary device, designed to contain an accumulation of liquid or semi-liquid components of solid waste that is constructed primarily of nonearthen materials that provide structural support.
"TEF" or "Toxicity Equivalency Factor" means a factor developed to account for different toxicities of structural isomers of polychlorinated dibenzodioxins and dibenzofurans and to relate them to the toxicity of 2,3,7,8-tetrachloro dibenzo-p-dioxin.
"Terminal" means the location of transportation facilities such as classification yards, docks, airports, management offices, storage sheds, and freight or passenger stations, where solid waste that is being transported may be loaded, unloaded, transferred, or temporarily stored.
"Thermal treatment" means the treatment of solid waste in a device that uses elevated temperature as the primary means to change the chemical, physical, or biological character, or composition of the solid waste.
"Tire chip" means a material processed from waste tires that is a nominal two square inches in size, and ranges from 1/4 inch to four inches in any dimension. Tire chips contain no wire protruding more than 1/4 inch.
"Tire shred" means a material processed from waste tires that is a nominal 40 square inches in size, and ranges from four inches to 10 inches in any dimension.
"Transfer station" means any solid waste storage or collection facility at which solid waste is transferred from collection vehicles to haulage vehicles for transportation to a central solid waste management facility for disposal, incineration, or resource recovery.
"Trash" means combustible and noncombustible discarded materials and is used interchangeably with the term rubbish.
"Treatment" means, for the purpose of this chapter, any method, technique, or process, including incineration, designed to change the physical, chemical, or biological character or composition of any waste to render it more stable, safer for transport, or more amenable to use, reuse, reclamation, recovery, or disposal.
"Underground source of drinking water" means an aquifer or its portion:
1. Which contains water suitable for human consumption; or
2. In which the groundwater contains less than 10,000 mg/liter total dissolved solids.
"Unit" means a discrete area of land used for the disposal of solid waste.
"Unstable area" means a location that is susceptible to natural or human-induced events or forces capable of impairing the integrity of some or all of the landfill structural components responsible for preventing releases from a landfill. Unstable areas can include poor foundation conditions, areas susceptible to mass movements, and karst terranes.
"Uppermost aquifer" means the geologic formation nearest the natural ground surface that is an aquifer, as well as, lower aquifers that are hydraulically interconnected with this aquifer within the facility boundary.
"Used or reused material" means a material that is either:
1. Employed as an ingredient (including use as an intermediate) in a process to make a product, excepting those materials possessing distinct components that are recovered as separate end products; or
2. Employed in a particular function or application as an effective substitute for a commercial product or natural resources.
"Vector" means a living animal, insect, or other arthropod that transmits an infectious disease from one organism to another.
"Vegetative waste" means decomposable materials generated by yard and lawn care or land-clearing activities and includes leaves, grass trimmings, woody wastes such as shrub and tree prunings, bark, limbs, roots, and stumps.
"Vermicomposting" means the controlled and managed process by which live worms convert organic residues into fertile excrement.
"Vertical design capacity" means the maximum design elevation specified in the facility's permit or if none is specified in the permit, the maximum elevation based on a 3:1 slope from the waste disposal unit boundary.
"Very small quantity generator" means a generator of hazardous waste as defined in 40 CFR 260.10 as incorporated by reference in 9VAC20-60-260 that generates less than or equal to the following amounts in a calendar month: (i) 100 kilograms of nonacute hazardous waste; (ii) one kilogram of acute hazardous waste; and (iii) 100 kilograms of any residue or contaminated soil, water, or other debris resulting from the cleanup of a spill into or on any land or water of acute hazardous waste.
"VPDES" (Virginia Pollutant Discharge Elimination System) means the Virginia system for the issuance of permits pursuant to the Permit Regulation (9VAC25-31), the State Water Control Law (§ 62.1-44.2 et seq. of the Code of Virginia), and § 402 of the Clean Water Act (33 USC § 1251 et seq.).
"Washout" means carrying away of solid waste by waters of the base flood.
"Waste-derived fuel product" means a solid waste or combination of solid wastes that have been treated (altered physically, chemically, or biologically) to produce a fuel product with a minimum heating value of 5,000 BTU/lb. Solid wastes used to produce a waste-derived fuel product must have a heating value, or act as binders, and may not be added to the fuel for the purpose of disposal. Waste ingredients may not be listed or characteristic hazardous wastes. The fuel product must be stable at ambient temperature, and not degraded by exposure to the elements. This material may not be "refuse derived fuel (RDF)" as defined in 9VAC5-40-890.
"Waste management boundary" means the vertical plane located at the boundary line of the area approved in the Part A application for the disposal of solid waste and storage of leachate. This vertical plane extends down into the uppermost aquifer and is within the facility boundary.
"Waste pile" means any noncontainerized accumulation of nonflowing, solid waste that is used for treatment or storage.
"Waste tire" means a tire that has been discarded because it is no longer suitable for its original intended purpose because of wear, damage, or defect. (See 9VAC20-150 for other definitions dealing with the waste tire program.)
"Wastewaters" means, for the purpose of this chapter, wastes that contain less than 1.0% by weight total organic carbon (TOC) and less than 1.0% by weight total suspended solids (TSS).
"Water pollution" means such alteration of the physical, chemical, or biological properties of any state water as will or is likely to create a nuisance or render such waters:
1. Harmful or detrimental or injurious to the public health, safety, or welfare, or to the health of animals, fish, or aquatic life or plants;
2. Unsuitable, with reasonable treatment, for use as present or possible future sources of public water supply; or
3. Unsuitable for recreational, commercial, industrial, agricultural, or other reasonable uses, provided that:
a. An alteration of the physical, chemical, or biological properties of state waters or a discharge or deposit of sewage, industrial wastes, or other wastes to state waters by any owner that by itself is not sufficient to cause pollution but which in combination with such alteration or discharge or deposit to state waters by other persons is sufficient to cause pollution;
b. The discharge of untreated sewage by any person into state waters; and
c. The contribution to the degradation of water quality standards duly established by the State Water Control Board, are "pollution" for the terms and purposes of this chapter.
"Water table" means the upper surface of the zone of saturation in groundwaters in which the hydrostatic pressure is equal to the atmospheric pressure.
"Waters of the United States" or "waters of the U.S." means:
1. All waters that are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters that are subject to the ebb and flow of the tide;
2. All interstate waters, including interstate "wetlands";
3. All other waters such as intrastate lakes, rivers, streams (including intermittent streams), mud flats, sand flats, "wetlands," sloughs, prairie potholes, wet meadows, playa lakes, or natural ponds the use, degradation, or destruction of which would affect or could affect interstate or foreign commerce including:
a. Any such waters that are or could be used by interstate or foreign travelers for recreational or other purposes;
b. Any such waters from which fish or shellfish are or could be taken and sold in interstate or foreign commerce;
c. Any such waters that are used or could be used for industrial purposes by industries in interstate commerce;
d. All impoundments of waters otherwise defined as waters of the United States under this definition;
e. Tributaries of waters identified in subdivisions 3 a through d of this definition;
f. The territorial sea; and
g. Wetlands adjacent to waters (other than waters that are themselves wetlands) identified in subdivisions 3 a through f of this definition.
"Wetlands" means those areas that are defined by the federal regulations under 33 CFR Part 328, as amended.
"White goods" means any stoves, washers, hot water heaters, and other large appliances.
"Working face" means that area within a landfill that is actively receiving solid waste for compaction and cover.
"Yard waste" means a subset of vegetative waste and means decomposable waste materials generated by yard and lawn care and includes leaves, grass trimmings, brush, wood chips, and shrub and tree trimmings. Yard waste shall not include roots or stumps that exceed 12 inches in diameter.
A. Prohibition.
1. No person shall dispose of solid waste in open dumps, nor own, operate or allow to be operated on his property an open dump as defined in subsection B of this section or § 10.1-1400 of the Code of Virginia. Both permitted and unpermitted sites or facilities may be classified as open dumps.
2. Any person found to be in violation of this section shall be ordered to immediately cease treatment, storage, and disposal of any additional solid waste and shall take measures to abate improper management of the solid waste and come into compliance with the requirements of this chapter.
B. Criteria – Incorporation of 40 CFR 257.1 through 257.3-8 by reference.
1. Except as otherwise provided, the regulations of the United States Environmental Protection Agency set forth in 40 CFR 257.1 through 257.3-8 are adopted herein and incorporated by reference as part of the Virginia Solid Waste Management Regulations. Except as otherwise provided, all material definitions, reference materials and other ancillaries that are part of 40 CFR 257.1 through 257.3-8 are also hereby incorporated as part of the Virginia Solid Waste Management Regulations.
2. In all locations in these regulations where 40 CFR 257.1 through 257.3-8 are incorporated by reference, the following additions, modifications, and exceptions shall amend the incorporated text for the purpose of its incorporation into these regulations:
a. 40 CFR 257.1(b) and 40 CFR 257.3-5 are not included in the incorporation of 40 CFR 257.1 through 257.3-8 by reference and are not part of the Virginia Solid Waste Management Regulations.
b. The following text shall be substituted for 40 CFR 257.1(a): "Unless otherwise provided, the criteria in §§ 257.1 through 257.3-8 are adopted for determining which solid waste disposal facilities and practices are a nuisance and pose a reasonable probability of adverse effects on health or the environment under §§ 1008(a)(3) and 4004(a) of the Resource Conservation and Recovery Act, 42 USC § 6901 et seq. (1976) (RCRA) and the Virginia Waste Management Act, § 10.1-1400 of the Code of Virginia (Act). Unless otherwise provided, the criteria in §§ 257.50 through 257.107 are adopted for determining which CCR landfills and CCR surface impoundments pose a reasonable probability of adverse effects on human health or the environment under sections 1008(a)(3) and 4004(a) of the Resource Conservation and Recovery Act."
c. The following text shall be substituted for 40 CFR 257.1(a)(1): "Facilities failing to satisfy the criteria in §§ 257.1 through 257.3-8 or §§ 257.5 through 257.30 or §§ 257.50 through 257.107 are considered open dumps, which are prohibited under section 4005 of RCRA and § 10.1-1408.1 of the Act."
d. The following text shall be substituted for 40 CFR 257.1(a)(2): "Practices failing to satisfy the criteria in §§ 257.1 through 257.3-8 or §§ 257.5 through 257.30 or §§ 257.50 through 257.107 constitute open dumping, which is prohibited under section 4005 of RCRA and § 10.1-1408.1 of the Act."
e. In addition to those exceptions found in 40 CFR 257.1(c), the open dump criteria does not apply to sites actively enrolled in the Voluntary Remediation Program (9VAC20-160) or sites that have successfully completed the Voluntary Remediation Program in accordance with all conditions and requirements of their Certificates of Satisfactory Completion.
f. In addition to those exceptions found in 40 CFR 257.1(c), the open dump criteria shall not apply to sites that are undergoing remediation per the requirements of CERCLA or the RCRA Corrective Action Program and are doing so with the department's or the U.S. Environmental Protection Agency's oversight.
C. Site evaluation and remedial action.
1. If a site is a potential or probable open dump, a site evaluation may be conducted. This site evaluation will be conducted by the department in order to determine if further action is required under this section. The site evaluation will include but is not limited to any records that can be obtained from the owner, operator, or other responsible party as well as all documented observations by department personnel regarding the following:
a. The location of the site;
b. The amount, type, and source of the waste at the site;
c. The permit status for the activities taking place at the site; and
d. A preliminary evaluation of the site with respect to the criteria outlined in subsection B of this section.
2. Based on the criteria of subsection B of this section and the information gathered under the provisions of subdivision 1 of this subsection, the department will make a determination that the site is or is not an open dump.
3. If the department determines that the site is an open dump then the department will make a recommendation for remedial action as follows:
a. Remedial action is required; or
b. Removal of the wastes from the site and disposal at a facility permitted to accept the wastes is required. The department may require submission of evidence of proper management of the removed waste and may require evidence, including confirmatory sampling, of the removal of solid waste and any hazardous constituents. A site inspection will be performed by the department to confirm the removal of the waste materials.
4. The site evaluation conducted under this subsection may be performed pursuant to an administrative or judicial order or other appropriate mechanism as chosen by the department.
5. Pursuant to the recommendations made under subdivision 3 of this subsection, any required remedial action as deemed necessary by the department shall be performed by the responsible party pursuant to an administrative or judicial order or other appropriate mechanism as chosen by the department.
6. When remedial action is required pursuant to an administrative or judicial order or other appropriate mechanism as chosen by the department, the responsible party shall demonstrate financial assurance for corrective action in accordance with the Financial Assurance Regulations for Solid Waste Disposal, Transfer, and Treatment Facilities (9VAC20-70), as applicable.
D. Process and appeal.
1. Any case decision by the department based on the requirements of this section shall be subject to the process and appeal provisions of the Virginia Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
2. A final determination and an administrative order requiring remedial action may be obtained in the same hearing or proceeding subject to the Virginia Administrative Process Act (§ 2.2-4000 et seq. of the Code of Virginia).
The design and construction of all sanitary, CDD and industrial landfills shall be governed by the standards set forth in this section.
A. Both the landfill capacity (in cubic yards) and the daily disposal limit shall be specified.
B. All facilities shall be surrounded on all sides by natural barriers, fencing, or an equivalent means of controlling vehicular and public access and preventing illegal disposal. All access will be limited by gates, and such gates shall be securable and equipped with locks, except, in the case of industrial disposal sites where the solid waste disposal landfill is on site of the industrial facility where access is limited.
C. All landfill access roads shall be provided with a base capable of withstanding anticipated heavy vehicle loads and shall be all-weather roads extending from the entrance of the landfill to the working face.
D. All facilities, except captive industrial, shall have an adequately lighted and heated shelter where operating personnel can exercise site control and have access to essential sanitation facilities. Lighting, heat, and sanitation facilities may be provided by portable equipment as necessary.
E. Aesthetics shall be considered in the design of a landfill or site. Use of artificial or natural screens shall be incorporated into the design for site screening and noise attenuation. The design shall reflect those requirements, if any, that are determined from the long-range plan for the future use of the site. Noise attenuation shall be less than 80 dBA at the facility boundary.
F. All landfills shall be equipped with permanent or mobile telephone or radio communications except at industrial landfills where other onsite resources are available.
G. Two A minimum of two survey benchmarks shall be established and maintained on the landfill site, and their location identified or recorded on drawings and maps of the landfill. Benchmark horizontal and geometric locations shall be provided in the North American Datum of 1983 (NAD83), and elevations shall be provided in the National Geodetic Vertical Datum of 1929 (NGVD 29) or North American Vertical Datum of 1988 (NAVD88), or shall be referenced to a datum and geographic coordinate system in accordance with the latest surveying or geographic information system (GIS) industry standard.
H. Surface water runoff. Facilities shall be designed to provide and maintain:
1. A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 24-hour, 25-year storm;
2. A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm. Run-off from the active portion of the landfill unit shall be handled in a manner that will not cause the discharge of:
a. Pollutants into waters of the United States, including wetlands, that violates any requirements of the Clean Water Act, including, but not limited to, the Virginia Pollutant Discharge Elimination System (VPDES) requirements; and
b. A nonpoint source of pollution to waters of the United States, including wetlands, that violates any requirement of an areawide or statewide water quality management plan that has been approved under § 208 or 319 of the Clean Water Act, as amended; and
3. Drainage structures shall be installed and continuously maintained to prevent ponding and erosion, and to minimize infiltration of water into solid waste cells.
I. A fire break of 50 feet shall be designed between the limits of waste and all tree lines.
J. Bottom liner.
1. Sanitary landfills.
All sanitary landfills shall be underlain by a composite liner system as follows:
a. Subtitle D Liner System.
(1) Base preparation to protect the liner by preventing liner failure through subsidence or structural failure of the liner system.
(2) A lower liner consisting of at least a two-foot layer of compacted soil or augmented soil with a hydraulic conductivity of no more than 1x10-7 cm/sec.
(3) An upper component consisting of a minimum 30 mil flexible membrane liner (FML). If high density polyethylene (HDPE) is used as an FML, it shall be at least 60 mil thick. The FML component shall be:
(a) Installed in direct and uniform contact with the compacted soil liner;
(b) Placed in accordance with an approved construction quality control/quality assurance program submitted with the design plans; and
(c) Placed with a minimum of 2.0% slope for leachate drainage.
b. Alternate Liner System. FML/Geosynthetic Clay Liner (GCL).
(1) The alternate liner system presented below is the minimum that is required under these regulations requiring no demonstration. If additional components to this alternate system are incorporated into the liner design, no demonstration will be required.
(2) A controlled subgrade with a minimum thickness of 12 inches shall be provided immediately beneath the alternate liner. The controlled subgrade shall consist of soils having a Unified Soil Classification of SC, ML, CL, MH, or CH and shall be compacted to a minimum of 95% of the maximum dry density, as determined by ASTM D698 (Standard Proctor). The surface shall be rolled smooth and be free of rocks or stones in excess of 0.75 inches prior to placement of the overlying GCL.
The surface shall be prepared to meet the liner manufacturer's and the installer's specifications. The liner manufacturer's/installer's specifications shall consider compaction, soft areas, proof rolling, maximum grain size, rocks, and other subgrade imperfections that may affect the liner. The liner installer shall provide written acceptance of the subgrade before installing liner on it.
(3) A lower liner consisting of geosynthetic clay liner (GCL) with a hydraulic conductivity of no more than 1x10-9 5x10-9 cm/sec. The GCL shall have appropriate overlap between adjacent panels so as to minimize the risk of panel shrinkage and/or transverse shortening creating panel separation, and be installed with a minimum 12-inch overlap on the panel ends and 6-inch overlap between adjacent panels. If the liner system will be exposed prior to the placement of a protective cover layer for periods in excess of two months, a discussion of the adequacy of the GCL overlap shall be included in the certification report. Granular bentonite shall be spread on all seams prior to placement of overlapping panels, or other means per manufacturer's specifications.
(4) An upper component consisting of a minimum 30 mil flexible membrane liner (FML). If high density polyethylene (HDPE) is used as an FML, it shall be at least 60 mil thick. The FML component shall be:
(a) Installed in direct and uniform contact with the GCL;
(b) Placed in accordance with an approved construction quality control/quality assurance program submitted with the design plans;
(c) Placed with a minimum of 2.0% slope for leachate drainage; and
(d) Leachate collection aggregate/protective cover materials shall be placed as soon as practical following the completion of the FML installation. At a minimum, this material should be placed within three months of final acceptance of the FML surface by the CQA engineer.
c. Additional alternate liner systems.
(1) Additional alternate liner systems may be approved if the owner or operator of the landfill demonstrates to the satisfaction of the director that the proposed alternate liner system design will ensure that the maximum contaminant levels (MCL) promulgated under § 1412 of the Safe Drinking Water Act (40 CFR Part 141) will not be exceeded in the uppermost aquifer at the disposal unit boundary.
(a) The demonstration shall be based on the consideration of the following factors:
(1) The hydrogeologic characteristics of the landfill and surrounding land;
(2) The climatic factors of the area;
(3) The volume and physical and chemical characteristics of the leachate;
(4) The quantity, quality, and direction of flow of groundwater;
(5) The proximity and withdrawal rate of the groundwater users;
(6) The availability of alternative drinking water supplies;
(7) The existing quality of the groundwater, including other sources of contamination and their cumulative impacts on the groundwater, and whether the groundwater is currently used or reasonably expected to be used for drinking water;
(8) Public health, safety, and welfare effects; and
(9) Practicable capability of the owner or operator.
(b) The demonstration shall be supported by the results of a mathematical modeling study based on the EPA MULTIMED model.1 Other models may be used if accompanied by justification describing the reasons for inapplicability of the MULTIMED model.2
1Sharp-Hansen, S., C. Travers, P. Hummel, T. Allison, R. Johns, and W. B. Mills. A Subtitle D Landfill Application Manual for the Multimedia Exposure Assessment Model (MULTIMED 2.0), United States Environmental Protection Agency, Athens, Georgia, 1995.
2For a listing and review of models see Travers, C.L., and S. Sharp-Hansen, Leachate Generation and Migration at Subtitle D Facilities: A Summary and Review of Processes and Mathematical Models, United States Environmental Protection Agency, Environmental Research Laboratory, Athens, Georgia (1991).
2. CDD and industrial landfills.
All landfills shall be underlain by a liner system as follows:
a. Compacted clay:
(1) A liner consisting of at least one-foot layer of compacted soil with a hydraulic conductivity of no more than 1x10-7 cm/sec.
(2) The liner shall be placed with a minimum of 2.0% slope for leachate drainage.
(3) The liner shall be covered with a minimum one-foot thick drainage layer.
b. Synthetic liners:
(1) Synthetic liner consisting of a minimum 30 mil thick flexible membrane. If high density polyethylene is used, it shall be at least 60 mil thick. Synthetic liners shall be proven to be compatible with the solid waste and its leachate.
(2) The liner shall be placed in accordance with an approved construction quality control/quality assurance program submitted with the design plans.
(3) The surface under the liner shall be a smooth rock-free base or otherwise prepared to prevent liner failure.
(4) The liner shall be placed with a minimum of 2.0% slope for leachate drainage.
(5) The liner shall be covered with a 12-inch thick drainage layer for leachate removal and a six-inch thick protective layer placed above the drainage layer, both composed of materials with a hydraulic conductivity of 1x10-3 cm/sec or greater (lab tested).
c. Other liners:
(1) Other augmented compacted clays or soils may be used as a liner provided the thickness is equivalent and the hydraulic conductivity will be equal to or less than that for compacted clay alone.
(2) The effectiveness of the proposed augmented soil liner shall be documented by using laboratory tests.
(3) The liner shall be placed with a minimum of 2.0% slope for leachate drainage.
d. In-place soil:
(1) Where the landfill will be separated from the groundwater by low hydraulic conductivity soil as indicated by laboratory tests, which is natural and undisturbed, and provides equal or better performance in protecting groundwater from leachate contamination, a liner can be developed by manipulation of the soil to form a liner with equivalent thickness and hydraulic conductivity equal to or less than that of the clay liner.
(2) The liner shall be prepared with a minimum of 2.0% slope for leachate drainage. Interior liner slopes of 33% will be allowed provided that adequate runoff and erosion controls are established. All interior slopes shall be supported by necessary calculations and included in the design manual.
e. Double liners required or used in lieu of groundwater monitoring shall include:
(1) Base preparation to protect the liner.
(2) A bottom or secondary liner that is soil, synthetic, or augmented soil as indicated in subdivision 2 a, b, c, or d of this subsection.
(3) A witness or monitoring zone placed above the bottom or secondary liner consisting of a 12-inch thick drainage layer composed of material with a hydraulic conductivity of 1x10-3 cm/sec or greater (lab tested) with a network of perforated pipe, or an equivalent design.
(4) The primary liner as indicated in subdivision 2 a, b, or c of this subsection.
(5) The primary liner will be covered with a minimum 12-inch thick drainage layer and a six-inch thick protective layer, placed above the drainage layer, both composed of materials having a hydraulic conductivity of 1x10-3 cm/sec or greater (lab tested).
(6) A program for monitoring the witness zone shall be established. The program will monitor the quantity and quality of liquids collected from this zone and shall be designed to detect waste constituents most likely associated with the waste accepted at the landfill. The program will also establish a leakage action rate beyond which groundwater contamination will be assessed through a groundwater monitoring program in accordance with 9VAC20-81-250.
f. If five-foot separation from seasonal high ground water can be demonstrated, a separate area may be established to receive only stumps, brush, leaves, and land-clearing debris. Such an area may be constructed without a liner or a leachate collection system, but may not receive any other solid waste.
K. Each site design shall include a decomposition gas venting system or gas management system (see 9VAC20-81-200), except at CDD and industrial landfills if the owner or operator can demonstrate to the department that gas formation is not a concern.
L. Leachate control and monitoring systems are subject to the requirements in 9VAC20-81-210.
M. A groundwater monitoring system shall be installed at all landfills in accordance with 9VAC20-81-250, except for the exemption of double-lined CDD or industrial landfills referenced in this section.
N. Final contours of the finished landfill shall be specified. Design of final contours shall consider subsequent site uses, existing natural contours, surface water management requirements, and the nature of the surrounding area. The final elevation of the landfill shall be limited by the structural capacity of the liner and leachate collection and removal system and by stability of foundation and slopes. The final contour shall not cause structural damage or collapse of the leachate collection system.
O. Finished side slopes shall be designed as set forth in 9VAC20-81-160 D 3 of this part.
P. All landfills shall be constructed in accordance with approved plans, which shall not be subsequently modified without approval by the department.
Q. Construction quality assurance program.
1. General.
a. A construction quality assurance (CQA) program is required for all landfill units. The program shall ensure that the constructed unit meets or exceeds all design criteria and specifications in the permit. The program shall be developed and implemented under the direction of a CQA officer who is a professional engineer.
b. The CQA program shall address the following physical components, where applicable:
(1) Foundations;
(2) Low-hydraulic conductivity soil liners;
(3) Synthetic membrane liners;
(4) Leachate collection and removal systems including an 18-inch protective layer;
(5) Gas management components; and
(6) Final cover systems.
2. Written CQA plan. The owner or operator shall develop and implement a written CQA plan that shall include observations, inspections, tests, and measurements. The plan shall identify steps that will be used to monitor and document the quality of materials and the condition and manner of their installation. The CQA plan shall include:
a. Identification of applicable units, and a description of how they will be constructed;
b. Identification of key personnel in the development and implementation of the CQA plan, and CQA officer qualifications;
c. A description of inspection and sampling activities for all unit components identified in subdivision 1 b of this section including observations and tests that will be used before, during, and after construction to ensure that the construction materials and the installed unit components meet the design specifications. The description shall cover sampling size and locations; frequency of testing; data evaluation procedures; acceptance and rejection criteria for construction materials and constructed components; plans for implementing corrective measures; and data or other information to be recorded;
d. Structural stability and integrity of all components of the unit identified in subdivision 1 b of this subsection;
e. Proper construction of all components of the liners, leachate collection and removal system, gas management system if required under subsection K of this section, and final cover system, according to permit specifications and good engineering practices, and proper installation of all components (e.g., pipes) according to design specifications;
f. Conformity of all materials used with design and other material specifications;
g. The permeability of the soil liner.
(1) The ability of the soil to be used as a liner material must be demonstrated using a test pad. At least one test pad shall be required for every source of low permeability liner soil. If soil sources are consistent (i.e. similar USCS soil type, liquid and plastic limits, grain size distribution, moisture density relationship, and permeability characteristics) one test pad will be adequate provided that the third-party quality control firm agrees. In the event that soils are not uniform within a borrow source an additional test pad shall be constructed for each soil type.
The test pad shall establish the range of criteria (compaction, moisture content, USCS classification, and grain size) that can be expected to achieve a low permeability soil liner meeting the requirements of the permit. To achieve these results the test pad's permeability shall be correlated with grain size analysis, liquid and plastic limits, moisture content, relative compaction, remolded permeability, undisturbed Shelby tube sample permeability, and the in-situ permeability determined by field tests performed on the test pad.
(2) Following the completion of the test pad the remaining low permeability liner system shall be certified by testing the constructed liner to determine its conformance to the acceptable criteria established during the test pad construction. Such tests shall include compaction, moisture content, grain size, and the liquid and plastic limits of the soil. Any area that does not conform to the established criteria shall be further tested by obtaining an undisturbed Shelby tube sample of the constructed liner and performing a laboratory permeability on it. In addition to testing any liner areas that do not conform to the established test pad acceptance criteria, a minimum of one additional laboratory permeability test shall be performed on each acre of constructed liner.
3. Certification. Once construction is complete, the owner or operator shall submit to the department by certified mail or other equivalent method with a return receipt or hand delivery a certification signed by the CQA officer that the approved CQA plan has been successfully carried out and that the unit meets the requirements of this section. Documentation supporting the CQA officer's certification shall be submitted to the department upon request. An additional professional engineer's certification is required under the provisions of 9VAC20-81-490 A. Wastes shall not be accepted until the facility receives a Certificate to Operate (CTO) per 9VAC20-81-490 A.
A. The operation of all sanitary, CDD, and industrial landfills shall be governed by the standards set forth in this section. Landfill operations will be detailed in an operations manual that shall be maintained in the operating record in accordance with 9VAC20-81-485. This operations manual will include an operations plan, an inspection plan, a health and safety plan, an unauthorized waste control plan, an emergency contingency plan, and a landscaping plan meeting the requirements of this section and 9VAC20-81-485. This manual shall be made available to the department when requested. If the applicable standards of this chapter and the landfill's Operations Manual conflict, this chapter shall take precedence.
B. Landfill operational performance standards.
1. Safety hazards to operating personnel shall be controlled through an active safety program consistent with the requirements of 29 CFR Part 1910, as amended.
2. A groundwater monitoring program meeting the requirements of 9VAC20-81-250 shall be implemented, as applicable.
3. A groundwater corrective action program meeting the requirements of 9VAC20-81-260 is required whenever the groundwater protection standard is exceeded at statistically significant levels.
4. Open burning at active landfills.
a. Owners or operators shall ensure that the units do not violate any applicable requirements developed by the State Air Pollution Control Board or promulgated by the EPA administrator pursuant to § 110 of the Clean Air Act, as amended (42 USC §§ 7401 to 7671q).
b. Open burning of solid waste, except for infrequent burning of agricultural wastes, silvicultural wastes, land-clearing debris, diseased trees, or debris from emergency cleanup operations is prohibited. There shall be no open burning permitted on areas where solid waste has been disposed of or is being used for active disposal.
c. The owner or operator shall be responsible for extinguishing any fires that may occur at the facility. A fire control plan will be developed that outlines the response of facility personnel to fires. The fire control plan will be provided as an attachment to the emergency contingency plan required under the provisions of 9VAC20-81-485. The fire control plan will be available for review upon request by the public. There shall be no open burning permitted on areas where solid waste has been disposed or is being used for active disposal.
5. Except as provided in 9VAC20-81-130 K, owners or operators shall implement a gas management plan in accordance with 9VAC20-81-200 to control landfill gas such that:
a. The concentration of methane gas generated by the landfill does not exceed 25% of the lower explosive limit for methane in landfill structures (excluding gas control or recovery system components); and
b. The concentration of methane gas does not exceed the lower explosive limit for methane at the facility boundary.
6. Landfills shall not:
a. Allow leachate from the landfill to drain or discharge into surface waters except when treated onsite and discharged into surface water as authorized under a VPDES Permit (9VAC25-31).
b. Cause a discharge of pollutants into waters of the United States, including wetlands, that violates any requirements of the Clean Water Act (33 USC § 1251 et seq.), including, but not limited to, the VPDES requirements and Virginia Water Quality Standards (9VAC25-260).
c. Cause the discharge of a nonpoint source of pollution to waters of the United States, including wetlands, that violates any requirement of an areawide or statewide water quality management plan that has been approved under § 208 or 319 of the Clean Water Act (33 USC § 1251 et seq.), as amended or violates any requirement of the Virginia Water Quality Standards (9VAC25-260).
d. Allow solid waste to be deposited in or to enter any surface waters or groundwaters.
7. Owners or operators shall maintain the run-on/runoff control systems designed and constructed in accordance with 9VAC20-81-130 H.
8. Access to sanitary, CDD, or noncaptive industrial landfills shall be permitted only when an attendant is on duty and only during daylight hours, unless otherwise specified in the landfill permit.
9. Fencing or other suitable control means shall be used to control litter migration. All litter blown from the landfill operations shall be collected on a weekly basis.
10. Odors and vectors shall be effectively controlled so they do not constitute nuisances or hazards. Odor hazard or nuisances shall be controlled in accordance with 9VAC20-81-200 D. Disease vectors shall be controlled using techniques for the protection of human health and the environment.
11. If salvaging is allowed by a landfill, it shall not interfere with operation of the landfill and shall not create hazards or nuisances.
12. Fugitive dust and mud deposits on main offsite roads and access roads shall be minimized at all times to limit nuisances. Dust shall be controlled to meet the requirements of Article 1 (9VAC5-40-60 et seq.) of Part II of 9VAC5-40.
13. Internal roads in the landfill shall be maintained to be passable in all weather by ordinary vehicles. All operation areas and units shall be accessible.
14. All landfill appurtenances listed in 9VAC20-81-130 shall be properly maintained and operated as designed and approved in the facility's permit.
15. Adequate numbers and types of properly maintained equipment shall be available to a landfill for operation. Provision shall be made for substitute equipment to be available or alternate means implemented to achieve compliance with subdivision C 1, D 1, or E 1 of this section, as applicable, within 24 hours should the former become inoperable or unavailable. Operators with training appropriate to the tasks they are expected to perform and in sufficient numbers for the complexity of the site shall be on the site whenever it is in operation.
16. Self-Inspection. Each landfill shall implement an inspection routine including a schedule for inspecting all applicable major aspects of facility operations necessary to ensure compliance with the requirements of this chapter. Records of these inspections must be maintained in the operating record and available for review. At a minimum, the following aspects of the facility shall be inspected on a monthly basis: erosion and sediment controls, storm water conveyance system, leachate collection system, safety and emergency equipment, internal roads, and operating equipment. The groundwater monitoring system and gas management system shall be inspected at a rate consistent with the system's monitoring frequency.
17. Records to include, at a minimum, date of receipt, quantity by weight or volume, and origin shall be maintained on solid waste received and processed to fulfill the applicable requirements of the Solid Waste Information and Assessment Program under 9VAC20-81-80 and the Control Program for Unauthorized Waste under 9VAC20-81-100 E. Such records shall be made available to the department for examination or use when requested.
18. Topographic Survey. Each landfill with a permitted daily disposal limit of more than 300 tons per day shall perform a topographic survey of the active portion of the landfill on an annual basis (at least once every 12 months). Each landfill with a permitted daily disposal limit of 300 tons per day or less shall perform a topographic survey of the active portion of the landfill on a biennial basis (at least once every 24 months). The survey shall be certified by a professional engineer or certified land surveyor licensed in the Commonwealth of Virginia, unless exempt pursuant to § 54.1-402. The survey results shall be compared to the landfill permit’s final site topography plan. Within 90 days of the survey, the landfill shall submit to the department a drawing comparing surveyed elevations, permitted final elevations, and the disposal unit boundary. The drawing shall note areas that have reached final elevation or lateral extent, and any areas of overfill (waste outside the constructed disposal unit boundary or above the vertical design capacity) including an estimate of total area and volume of overfill or areas of differential settlement which could lead to increased infiltration of liquids into the disposal unit. The submittal shall also include corrective actions that will be taken with an implementation schedule to address any areas of overfill or differential settlement and identify remaining capacity and estimated life within the permitted disposal unit boundary.
C. In addition to the standards in subsection B of this section, sanitary landfills shall also comply with the following:
1. Compaction and cover requirements.
a. Unless provided otherwise in the permit, solid waste shall be spread into two-foot layers or less and compacted at the working face, which shall be confined to the smallest area practicable.
b. Lift heights shall be sized in accordance with daily waste volumes. Lift height is not recommended to exceed 10 feet.
c. Daily cover consisting of at least six inches of compacted soil or other approved material shall be placed upon and maintained on all exposed solid waste prior to the end of each operating day, or at more frequent intervals if necessary, to control disease vectors, fires, odors, blowing litter, and scavenging. Alternate materials of an alternate thickness may be approved by the department if it has been demonstrated that the alternate material and thickness control disease vectors, fires, odors, blowing litter, and scavenging without presenting a threat to human health and the environment. At least three days of acceptable cover soil or approved material at the average usage rate shall be maintained at the landfill or readily available at all times.
d. Intermediate cover of at least six inches of additional compacted soil shall be applied and maintained whenever an additional lift of refuse is not to be applied within 30 days. Further, all areas with intermediate cover exposed shall be inspected as needed, but not less than weekly. Additional cover material shall be placed on all cracked, eroded, and uneven areas as required to maintain the integrity of the intermediate cover system.
e. Final cover construction will be initiated and maintained in accordance with the requirements of 9VAC20-81-160 D 2 when the following pertain:
(1) An additional lift of solid waste is not to be applied within one year, or a longer period as required by the facility's phased development.
(2) Any area of a landfill attains final elevation and within 90 days after such elevation is reached or longer if specified in the landfill's approved closure plan.
(3) An entire landfill's permit is terminated for any reason, and within 90 days of such denial or termination.
f. Vegetation shall be established and maintained on all exposed final cover material within four months after placement, or as specified by the department when seasonal conditions do not permit. Mowing will be conducted a minimum of once a year or at a frequency suitable for the vegetation and climate.
g. Areas where waste has been disposed that have not received waste within 30 days will not have slopes exceeding the final cover slopes specified in the permit or 33% unless steeper slopes are approved in the permit.
2. The active working face of a sanitary landfill shall be kept as small as practicable, determined by the tipping demand for unloading.
3. A sanitary landfill that is located within 10,000 feet of any airport runway used for turbojet aircraft or 5,000 feet of any airport runway used by only piston type aircraft, shall operate in such a manner that the landfill does not increase or pose additional bird hazards to aircraft.
4. Sanitary landfills shall not dispose of the following wastes, except as specifically authorized by the landfill permit or by the department:
a. Free liquids.
(1) Bulk or noncontainerized liquid waste, unless:
(a) The waste is household waste; or
(b) The waste is gas condensate derived from that landfill;
(c) The waste is leachate derived from that landfill and the landfill is designed with a composite liner and leachate collection system as described in 9VAC20-81-130 J 1 a and 9VAC20-81-130 L; or
(2) Containers holding liquid waste, unless:
(a) The container is a small container similar in size to that normally found in household waste;
(b) The container is designed to hold liquids for use other than storage; or
(c) The waste is household waste.
b. Regulated hazardous wastes as defined by the Virginia Hazardous Waste Management Regulations (9VAC20-60).
c. Solid wastes, residues, or soils containing more than 1.0 ppb (parts per billion) TEF (dioxins).
d. Solid wastes, residues, or soils containing 50.0 ppm (parts per million) or more of PCB's except as allowed under the provisions of 9VAC20-81-630.
e. Sludges that have not been dewatered.
f. Contaminated soil unless approved by the department in accordance with the requirements of 9VAC20-81-610 or 9VAC20-81-660.
g. Regulated medical waste as specified in the Regulated Medical Waste Management Regulations (9VAC20-121).
5. Chloroflourocarbons, hydrochlorofluorocarbons, and PCBs must be removed from white goods prior to placement on the working face.
D. In addition to the standards in subsection B of this section, Construction/demolition/debris landfills shall also comply with the following:
1. Compaction and cover requirements.
a. Waste materials shall be compacted in shallow layers during the placement of disposal lifts to minimize differential settlement.
b. Compacted soil cover shall be applied as needed for safety and aesthetic purposes. A minimum one-foot thick progressive cover shall be maintained weekly such that the top of the lift is fully covered at the end of the work week. If the landfill accepts Category I or II nonfriable asbestos-containing material for disposal, daily soil cover shall be placed upon all exposed Category I or II nonfriable asbestos-containing material prior to the end of each operating day. The open working face of a landfill shall be kept as small as practicable, determined by the tipping demand for unloading.
c. When waste deposits have reached final elevations, or disposal activities are interrupted for 15 days or more, waste deposits shall receive a one-foot thick intermediate cover unless soil has already been applied in accordance with subdivision 1 b of this subsection and be graded to prevent ponding and to accelerate surface run-off.
d. Final cover construction will be initiated and maintained in accordance with the requirements of 9VAC20-81-160 D 2 when the following pertain:
(1) An additional lift of solid waste is not to be applied within one year, or a longer period as required by the facility's phased development.
(2) Any area of a landfill attains final elevation and within 90 days after such elevation is reached or longer if specified in the landfill's approved closure plan.
(3) An entire landfill's permit is terminated for any reason, and within 90 days of such denial or termination.
e. Vegetation shall be established and maintained on all exposed final cover material within four months after placement, or as specified by the department when seasonal conditions do not permit. Mowing will be conducted a minimum of once a year or at a frequency suitable for the vegetation and climate.
f. Areas where waste has been disposed that have not received waste within 30 days will not have slopes exceeding the final cover slopes specified in the permit or 33%.
2. Chloroflourocarbons, hydrochlorofluorocarbons, and PCBs must be removed from white goods prior to placement on the working face.
E. In addition to the standards in subsection B of this section, Industrial Landfills shall also comply with the following:
1. Compaction and cover requirements.
a. Unless provided otherwise in the permit, solid waste shall be spread and compacted at the working face, which shall be confined to the smallest area practicable.
b. Lift heights shall be sized according to the volume of waste received daily and the nature of the industrial waste. A lift height is not required for materials such as fly ash that are not compactable.
c. Where it is necessary for the specific waste, such as Category I or II nonfriable asbestos-containing material, daily soil cover, or other suitable material shall be placed upon all exposed solid waste prior to the end of each operating day. For wastes such as fly ash and bottom ash from burning of fossil fuels, periodic cover to minimize exposure to precipitation and control dust or dust control measures such as surface wetting or crusting agents shall be applied. At least three days of acceptable cover soil or approved material at the average usage rate shall be maintained at the fill at all times at facilities where daily cover is required unless an offsite supply is readily available on a daily basis.
d. Intermediate cover of at least one foot of compacted soil shall be applied whenever an additional lift of refuse is not to be applied within 30 days unless the owner or operator demonstrates to the satisfaction of the director that an alternate cover material or an alternate schedule will be protective of public health and the environment. In the case of facilities where fossil fuel combustion products are removed for beneficial use, intermediate cover must be applied in any area where ash has not been placed or removed for 30 days or more. Further, all areas with intermediate cover exposed shall be inspected as needed but not less than weekly and additional cover material shall be placed on all cracked, eroded, and uneven areas as required to maintain the integrity of the intermediate cover system.
e. Final cover construction will be initiated in accordance with the requirements of 9VAC20-81-160 D 2 when the following pertain:
(1) When an additional lift of solid waste is not to be applied within two years or a longer period as required by the facility's phased development.
(2) When any area of a landfill attains final elevation and within 90 days after such elevation is reached or longer if specified in the landfill's approved closure plan.
(3) When a landfill's permit is terminated within 90 days of such denial or termination.
f. Vegetation shall be established and maintained on all exposed final cover material within four months after placement, or as otherwise specified by the department when seasonal conditions do not otherwise permit. Mowing will be conducted a minimum of once a year or at a frequency suitable for the vegetation and climate.
2. Incinerator and air pollution control residues containing no free liquids shall be incorporated into the working face and covered at such intervals as necessary to minimize them from becoming airborne.
The closure of all sanitary, CDD and industrial landfills shall be governed by the standards set forth in this section.
A. Closure purpose. The owner or operator shall close the landfill in a manner that minimizes the need for further maintenance and provides for the protection of human health and the environment. Closure shall eliminate the postclosure escape of uncontrolled leachate or of waste decomposition products to the groundwater or surface water to the extent necessary to protect human health and the environment. Closure shall also control and/or minimize surface runoff and the escape of waste decomposition products to the atmosphere.
B. Closure plan and modification of plan.
1. The owner or operator of a solid waste disposal facility shall have a written closure plan. This plan shall identify the steps necessary to completely close the landfill at the time when the operation will be the most extensive and at the end of its intended life. The closure plan shall include, at least:
a. A schedule for final closure that shall include, as a minimum, the anticipated date when wastes will no longer be received, the date when completion of final closure is anticipated, and intervening milestone dates that will allow tracking of the progress of closure.
b. An estimate of waste disposed onsite over the active life of the landfill;
c. An estimate of the largest area ever requiring a final cover as required at any time during the active life;
d. Description of Final Cover System design in accordance with subsection D of this section;
e. Description of storm water management to include design, construction, and maintenance controls; and
f. Closure cost estimate in accordance with 9VAC20-70-111 for the purpose of financial assurance.
2. The owner or operator may amend the closure plan at any time during the active life of the landfill. The owner or operator shall so amend his plan any time changes in operating plans or operations, landfill design, corrective action, or other site conditions affect the closure plan. The amended closure plan shall be placed in the operating record and a copy provided to the department.
3. Closure plans and amended closure plans not previously approved by the director shall be submitted to the department at least 180 days before the date the owner or operator expects to begin construction activities related to closure. The director will approve or disapprove the plan within 90 days of receipt.
4. If the owner or operator intends to use an alternate final cover design, he shall submit a proposed design meeting the requirements of subdivision D 2 f of this section to the department at least 180 days before the date he expects to begin closure. The department will approve or disapprove the plan within 90 days of receipt.
5. At least 180 days prior to beginning closure of each solid waste disposal unit, the owner or operator shall notify the department and the solid waste planning unit of the intent to close.
C. Time allowed for closure.
1. The owner or operator shall begin closure activities of each unit no later than 30 days after the date on which the unit receives the known final receipt of wastes or, if the unit has remaining capacity and there is a reasonable likelihood that the unit will receive additional wastes, no later than one year after the most recent receipt of wastes. Extensions beyond the one-year deadline for beginning closure may be granted by the director if the owner or operator demonstrates that the unit has the capacity to receive additional wastes and the owner or operator has taken and will continue to take all steps necessary to prevent threats to human health and the environment from the unclosed unit.
2. The owner or operator shall complete closure activities of each unit in accordance with the closure plan and within six months after receiving the final volume of wastes. The director may approve a longer closure period if the owner or operator can demonstrate that the required or planned closure activities will, of necessity, take longer than six months to complete; and that he has taken all steps to eliminate any significant threat to human health and the environment from the unclosed but inactive landfill.
D. Closure implementation.
1. The owner or operator shall close each unit with a final cover as specified in subdivision 2 of this subsection, grade the fill area to prevent ponding, and provide a suitable vegetative cover. Vegetation shall be deemed properly established when there are no large areas void of vegetation and it is sufficient to control erosion.
2. Final cover system.
a. The owner or operator shall install a final cover system that is designed to achieve the performance requirements of this section.
b. Owners or operators of CDD landfill units used for the disposal of wastes consisting only of stumps, wood, brush, and leaves from landclearing operations may apply two feet of compacted soil as final cover material in lieu of the final cover system specified in this section. The provisions of this section shall not be applicable to any landfill with respect to which the director has made a finding that continued operation of the landfill constitutes a threat to the public health or the environment.
c. The final cover system shall be designed and constructed to:
(1) Minimize infiltration through the closed disposal unit by the use of an infiltration layer that is constructed of at least 18 inches of earthen material; and which has a hydraulic conductivity less than or equal to the hydraulic conductivity of any bottom liner system or natural subsoils present, or a hydraulic conductivity no greater than 1x10-5 cm/sec, whichever is less; and
(2) Minimize erosion of the final cover by the use of an erosion layer that contains a minimum of six inches of earthen material that is capable of sustaining native plant growth, and provide for protection of the infiltration layer from the effects of erosion, frost, and wind.
d. The owner or operator of a sanitary landfill may choose to use this alternate final cover system, which shall consist of at least the following components:
(1) An 18-inch soil infiltration layer with a hydraulic conductivity no greater than 1x10-5 cm/sec or a geosynthetic clay liner installed over the intermediate cover;
(2) A barrier layer consisting of a geosynthetic membrane having a minimum thickness of 40-mils;
(3) A protective cover layer for protection of the infiltration layer from the effects of erosion, frost, and wind, and consisting of a minimum of 18 inches of soil; and
(4) A vegetative support layer that contains a minimum of six inches of earthen material that is capable of sustaining native plant growth.
e. The owner or operator of a CDD or industrial landfill may choose to use this alternate final cover system, which shall consist of at least the following components:
(1) A barrier layer consisting of a geosynthetic clay liner or a geosynthetic membrane having a minimum thickness of 40 mils;
(2) A protective cover layer for protection of the infiltration layer from the effects of erosion, frost, and wind, and consisting of a minimum of 18 inches of soil; and
(3) A vegetative support layer that contains a minimum of six inches of earthen material that is capable of sustaining native plant growth.
f. The director may approve an alternate final cover design that includes:
(1) An infiltration layer that achieves an equivalent reduction in infiltration as the infiltration layer specified in subdivision 2 c (1) of this subsection; and
(2) A minimum 24-inch erosion layer that is capable of sustaining native plant growth and provide for protection of the infiltration layer from the effects of erosion, frost, and wind.
3. Finished side slopes shall be stable and be configured to adequately control erosion and runoff. Slopes of 33% will be allowed provided that adequate runoff controls are established. Steeper slopes may be considered if supported by necessary stability calculations and appropriate erosion and runoff control features. All finished slopes and runoff management facilities shall be supported by necessary calculations and included in the design manual. To prevent ponding of water, the top slope shall be at least 2.0% after allowance for settlement.
4. Following construction of the final cover system for each unit, the owner or operator shall submit to the department a certification, signed by a professional engineer verifying that closure has been completed in accordance with the closure plan requirements of this part. This certification shall include the results of the CQA/QC requirements under 9VAC20-81-130 Q 1 b (6).
5. Following the closure of all units the owner or operator shall:
a. Post one sign at the entrance of the landfill notifying all persons of the closing, and the prohibition against further receipt of waste materials. Further, suitable barriers shall be installed at former accesses to prevent new waste from being deposited.
b. Within 90 days after closure is completed, submit to the local land recording authority a survey plat prepared by a professional land surveyor registered by the Commonwealth or a person qualified in accordance with Title 54.1 of the Code of Virginia indicating the location and dimensions of landfills. Groundwater monitoring well and landfill gas monitoring probe locations shall be included and identified by the number on the survey plat. The plat filed with the local land recording authority shall contain a note, prominently displayed, which states the owner's or operator's future obligation to restrict disturbance of the site as specified.
c. Record a notation on the deed to the landfill property, or on some other instrument which is normally examined during title searches, notifying any potential purchaser of the property that the land has been used to manage solid waste and its use is restricted under 9VAC20-81-170 A 2 c. A copy of the deed notation as recorded shall be submitted to the department.
d. Submit to the department a certification, signed by a professional engineer, verifying that closure has been completed in accordance with the requirements of subdivisions 5 a, b, and c of this subsection and the landfill closure plan.
6. The department shall inspect all solid waste management facilities at the time of closure to confirm that the closing is complete and adequate. It shall notify the owner or operator of a closed landfill, in writing, if the closure is satisfactory, and shall require any construction or such other steps necessary to bring unsatisfactory sites into compliance with these regulations. Notification by the department that the closure is satisfactory does not relieve the owner or operator of responsibility for corrective action to prevent or abate problems caused by the landfill.
7. The owner or operator shall continue to demonstrate financial assurance for closure until notified by the department that closure is satisfactory in accordance with 9VAC20-81-160 D 6 and the owner or operator is released from financial assurance requirements pursuant to 9VAC20-70-260.
The postclosure of all sanitary, CDD, and industrial landfills shall be governed by the standards as set forth in this section.
A. Postclosure care requirements.
1. Following closure of the landfill, the owner or operator shall conduct postclosure care of the landfill. Postclosure care shall consist of at least the following:
a. Maintaining the integrity and effectiveness of any final cover, including making repairs to the cover as necessary to correct the effects of settlement, subsidence, erosion, or other events, and preventing run-on and run-off from eroding or otherwise damaging the final cover;
b. Maintaining and operating the leachate collection system, as applicable, in accordance with the requirements in 9VAC20-81-210. The director may allow the owner or operator to stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to human health and the environment;
c. Maintaining the groundwater monitoring system and monitoring the groundwater, as applicable, in accordance with the requirements in 9VAC20-81-250; and
d. Maintaining and operating the gas monitoring system, as applicable, in accordance with the requirements in 9VAC20-81-200.
2. The owner or operator shall prepare a written postclosure care plan or review and revise the approved postclosure care plan to insure ensure that it includes, at a minimum, the following information:
a. A description of the monitoring and maintenance activities required in subdivision 1 of this subsection for the landfill, and the frequency at which these activities will be performed;
b. Name, address, and telephone number of the person or office to contact about the landfill during the postclosure period; and
c. A description of the planned uses of the property during the postclosure period. Postclosure use of the property shall not disturb the integrity of the final cover, liners, or any other components of the containment system, or the function of the monitoring systems unless necessary to comply with the requirements of this chapter. The director may approve any other disturbance if the owner or operator demonstrates that disturbance of the final cover, liner, or other component of the containment system, including any removal of waste, will not increase the potential threat to human health or the environment. ; and
d. Postclosure cost estimate in accordance with 9VAC20-70-112 for the purpose of financial assurance.
3. The owner or operator shall submit a postclosure care plan for review and approval by the department whenever a postclosure care plan has been prepared or amended. The owner or operator shall amend the postclosure care plan any time changes in operations, closure, postclosure care, corrective action, or other site conditions affect the postclosure care plan. Those postclosure Postclosure care plans that have been placed in a landfill's operating record must be reviewed and approved by the director prior to implementation.
B. Postclosure period.
1. Unless a landfill completes all provisions of 9VAC20-81-160 D, the department will not consider the landfill closed, and the beginning of the postclosure care period will be postponed until all provisions have been completed. The postclosure care period begins on the date of the certification signed by a professional engineer as required in 9VAC20-81-160 D 5 d.
2. The postclosure care shall be conducted:
a. For a minimum of 10 years for sanitary landfill facilities that ceased to accept wastes before October 9, 1993;
b. For a minimum of 30 years for sanitary landfill facilities that received wastes on or after October 9, 1993;
c. For a minimum of 10 years for CDD and industrial landfill facilities; or
d. For the length of time required to complete corrective action, if greater than specified in items a through c of this subdivision; or
d e. As provided in subdivision 3 of this subsection.
3. The length of the postclosure care period may be decreased if the owner or operator demonstrates that the reduced period is equally protective of human health and the environment, the owner or operator submits a justifying demonstration, and the department approves this demonstration. The owner or operator shall submit this demonstration to the department for review and approval, and shall also include the following information:
a. A certification, signed by the owner or operator and a professional engineer, verifying that decreasing the postclosure care period will be equally protective of human health and the environment.
b. The certificate shall be accompanied by an evaluation, prepared by a professional engineer, assessing and evaluating the landfill's potential for increased risk to human health and the environment in the event that postclosure period is decreased.
4. The owner or operator will continue postclosure care and monitoring until such time that the department approves termination of the postclosure care and/or monitoring activity.
C. Postclosure care termination.
1. The owner or operator may submit a request for termination of any or all portions of postclosure care and monitoring following completion of the postclosure care period (as defined in subdivision B 2 of this section) for the landfill. The owner or operator shall demonstrate that termination of postclosure care and/or or monitoring activity/activities activities shall be protective of human health and the environment. The owner or operator shall submit this demonstration for termination to the department for review and approval, and shall also include the following information:
a. A certification, signed by the owner or operator and a professional engineer, verifying that postclosure care has been completed in accordance with the postclosure plan.
b. The certificate shall be accompanied by an evaluation, prepared by a professional engineer or professional geologist, assessing and evaluating the landfill's potential for increased risk to human health and the environment in the event that postclosure monitoring and maintenance are discontinued.
2. If the department does not approve termination of the postclosure care and/or or monitoring activities, the owner or operator shall continue postclosure monitoring and maintenance in accordance with the approved plan and continue demonstrating financial assurance for postclosure in accordance with the Financial Assurance Regulations for Disposal, Transfer and Treatment Facilities (9VAC20-70). Additionally, the owner or operator shall review and revise, as necessary, the postclosure plan for modifications necessary to meet the current regulatory requirements, and submit this revised plan to the department for review and approval.
D. Owner or operator postclosure plan review.
1. The owner or operator shall review and revise, as necessary, the postclosure care plan for modifications to meet the current regulatory requirements and reflect the current landfill conditions when:
a. The department does not approve the termination of all postclosure care monitoring and maintenance activities; or
b. The minimum postclosure period has been met, and there are ongoing corrective action measures per 9VAC20-81-260 actions for the landfill.
2. The owner or operator shall submit this revised plan to the department for review and approval, and shall continue postclosure monitoring and maintenance in accordance with the approved plan.
Owners or operators of solid waste disposal facilities shall develop a gas management plan in accordance with this section. Venting and control Control of decomposition gases, including venting, collection, and control, shall be implemented for sanitary and other landfills in order to protect the landfill cap, and prevent fugitive emissions and subsurface migration into structures or beyond the facility boundary, and manage ETLF conditions, subject to exceptions at 9VAC20-81-130 K. Owners or operators of solid waste disposal facilities shall develop a gas management plan in accordance with this section. The contents of the plan shall also reflect the requirements contained in 40 CFR 60.33c and 40 CFR 60.750, (Standards of performance for new and guidelines for control of existing municipal solid waste landfills) and 9VAC5-40-5800, as applicable 40 CFR Part 60 as adopted by reference in Article 5 (9VAC5-50-400 et seq.) of 9VAC5-50; 40 CFR Part 63 as adopted in Article 2 (9VAC5-60-90 et seq.) of 9VAC5-60; Article 43 (9VAC5-40-5800 et seq.) of 9VAC5-40, Emission Standards for Municipal Solid Waste Landfills; and Article 43.1 (9VAC5-40-5925 et seq.) of 9VAC5-40, Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014, as applicable.
A. General requirements.
1. To provide for the protection of public health and safety, and the environment, the owner or operator shall ensure that decomposition gases generated at a landfill are vented, collected, and controlled during the periods of operation, closure and postclosure care, in accordance with the following requirements:
a. The concentration of methane gas generated by the landfill shall not exceed 25% of the lower explosive limit (LEL) for methane in landfill structures (excluding gas control or recovery system components); and
b. The concentration of methane gas migrating from the landfill shall not exceed the lower explosive limit for methane at the facility boundary.
2. The program implemented pursuant to subsections B through E of this section shall continue throughout the active life of the landfill and the closure and postclosure care periods or until the operator receives written authorization by the department to discontinue. Authorization to cease gas monitoring, collection, and control shall be based on a demonstration by the owner or operator that there is no potential for gas migration beyond the facility boundary or into landfill structures.
3. Gas monitoring, collection, and control systems shall be modified, during the closure and postclosure maintenance period, to reflect changing on-site changes, including ETLF conditions, and adjacent land uses. Postclosure land use at the site shall not interfere with the function of gas monitoring, collection, and control systems.
4. Landfills with gas collection and control systems shall maintain a sufficient density of gas collection wells to remove landfill gas, heat, and pressure. Vacuum applied on collection wells shall be balanced to minimize air intrusion.
4. 5. The operator may request a reduction of monitoring, collection, or control activities based upon the results of collected monitoring data. The request for reduction of monitoring, collection, or control activities shall be submitted in writing to the department.
B. The operator shall implement a gas monitoring program at the landfill in accordance with the following requirements:
1. The gas monitoring network shall be designed to ensure detection of the presence of decomposition gas migrating beyond the landfill facility boundary and into landfill structures.
2. The monitoring network shall be designed to account for the following specific site characteristics, and potential migration pathways or barriers, including, but not limited to:
a. Local soil and rock conditions;
b. Hydrogeological and hydraulic conditions surrounding the landfill;
c. Locations of buildings and structures relative to the waste deposit area;
d. Adjacent land use, and inhabitable structures within 1,000 feet of the landfill facility boundary;
e. Manmade pathways, such as underground construction; and
f. The nature and age of waste and its potential to generate decomposition gas.
3. Owners or operators of certain large sanitary landfills and landfills located in nonattainment areas may be required to perform additional monitoring as provided in 40 CFR 60.33c, 40 CFR 60.750, and 9VAC5-40-5800.
4. At a minimum, the gas monitoring frequency shall be quarterly. The department may require more frequent monitoring at locations where monitoring results indicate gas migration or gas accumulation in devices or structures designed to detect migrating gas.
4. Owners or operators of certain large sanitary landfills and landfills located in nonattainment areas may be required to perform additional monitoring of gas collection and control systems as provided in 40 CFR Part 60 as adopted by reference in Article 5 (9VAC5-50-400 et seq.) of 9VAC5-50; 40 CFR Part 63 as adopted in Article 2 (9VAC5-60-90 et seq.) of 9VAC5-60; Article 43 (9VAC5-40-5800 et seq.) of 9VAC5-40, Emission Standards for Municipal Solid Waste Landfills; and Article 43.1 (9VAC5-40-5925 et seq.) of 9VAC5-40, Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014. Unless otherwise approved by the director, sanitary landfills subject to MACT AAAA shall monitor and record monthly concentrations of methane, carbon dioxide, and the methane to carbon dioxide ratio at each gas collection well to monitor subsurface conditions in the landfill.
C. Gas Remediation.
1. When the gas monitoring results indicate concentrations of methane in excess of the action levels, 25% of the lower explosive limit (LEL) for methane in landfill structures (excluding gas control or recovery system components) or 80% of the LEL for methane at the facility boundary, the operator shall:
a. Take all immediate steps necessary to protect public health and safety including those required by the contingency plan.
b. Notify the department in writing within five working days of learning that action levels have been exceeded, and indicate what has been done or is planned to be done to resolve the problem.
2. When the gas monitoring results indicate concentrations of methane in excess of the compliance levels, 25% of the LEL for methane in landfill structures (excluding gas control or recovery system components) or the LEL for methane at the facility boundary, the operator shall, :
a. within Within 60 days of detection, implement a remediation plan for the methane gas releases and submit it to the department for modification of the landfill permit. The plan shall describe the nature and extent of the problem and the proposed remedy. The plan shall include an implementation schedule specifying timeframes for implementing corrective actions, an evaluation of the effectiveness of such corrective actions, and milestones for proceeding in implementation of additional corrective actions, if necessary to reestablish compliance.
b. Within 120 days of detection, provide additional financial assurance to the department as required by 9VAC20-70-113 using the mechanisms required in 9VAC20-70-140 of the Financial Assurance Regulations for Solid Waste Disposal, Transfer and Treatment Facilities.
3. A gas remediation system shall:
a. Prevent methane accumulation in onsite structures.
b. Reduce methane concentrations at monitored facility boundaries to below compliance levels in the timeframes specified in the gas remediation plan.
c. Provide for the collection and treatment and/or disposal of decomposition gas condensate produced at the surface. Condensate generated from gas control systems may be recirculated into the landfill provided the landfill complies with the liner and leachate control systems requirements of this part. Condensate collected in condensate traps and drained by gravity into the waste mass will not be considered recirculation.
4. Extensive systems to control emissions of nonmethane organic compounds may be required under the Clean Air Act (40 CFR 60.33c and 40 CFR 60.750) and 9VAC5-40-5800 40 CFR Part 60 as adopted by reference in Article 5 (9VAC5-50-400 et seq.) of 9VAC5-50; 40 CFR Part 63 as adopted in Article 2 (9VAC5-60-90 et seq.) of 9VAC5-60; Article 43 (9VAC5-40-5800 et seq.) of 9VAC5-40, Emission Standards for Municipal Solid Waste Landfills; and Article 43.1 (9VAC5-40-5925 et seq.) of 9VAC5-40, Emission Standards for Municipal Solid Waste Landfills for which Construction, Reconstruction, or Modification was Commenced on or before July 17, 2014. Facilities that are required to construct and operate systems designed to comply with those regulations will be considered to be in compliance with the requirements of subdivisions C 3 a and b of this subsection, unless monitoring data continues to indicate an exceedance of compliance levels. Gas control systems also may be subject to the Virginia Permits for Stationary Sources Program 9VAC5-80 or other state air pollution control regulations.
5. The landfill shall notify the department of an exceedance of the compliance level or unusual condition that may endanger human health and the environment in accordance with 9VAC20-81-530 C 3, such as when an active gas remediation system is no longer operating in such a manner as to maintain compliance with this section.
6. If the ratio of methane to carbon dioxide at any gas collection wellhead is below 0.9, the owner shall notify the department within 30 days from the date of monitoring and include an evaluation regarding cause of the lowered ratio.
D. Odor management.
1. When an odor nuisance or hazard is created under normal operating conditions and upon notification from the department, the permittee shall, within 90 days, develop and implement an odor management plan to address odors that may impact citizens beyond the facility boundaries. The permittee shall place the plan in the operating record and a copy shall be submitted to the department for its records. Odor management plans developed in accordance with Virginia Air Regulations, 9VAC5-40-140, 9VAC5-50-140 or other state air pollution control regulations will suffice for the provisions of this subsection.
2. The plan shall identify a contact at the landfill that citizens can notify about odor concerns.
3. Facilities shall perform and document an annual review and update the odor management plan, as necessary, to address ongoing odor management issues.
E. Recordkeeping. The owner or operator shall keep the records of the results of gas monitoring and any gas remediation issues throughout the active life of the landfill and the postclosure care period. The records shall include:
1. The concentrations of the methane as measured at each perimeter monitoring probe and within each onsite structure;
2. The concentration of methane and carbon dioxide measured at each collection well and the calculated methane to carbon dioxide ratio, as applicable;
2. 3. The documentation of date, time, barometric pressure, atmospheric temperatures, general weather conditions, and probe or well pressures;
3. 4. The names of sampling personnel, apparatus utilized, and a brief description of the methods used;
4. 5. A numbering system to correlate monitoring results to a corresponding probe or well location; and
5. 6. Monitoring and design records for any gas remediation, collection, or control system.
F. Upon request, monitoring records specified by subsection E of this section and 9VAC20-81-220 B 1 shall be submitted on a schedule and in a format acceptable to the department.
A. Design plan Leachate Management Plan. The design plan shall provide for leachate management. This design Owners or operators of solid waste disposal facilities shall develop a leachate management plan in accordance with this section. Owners or operators may include the specified leachate details in the facility’s Design Plans and Design Report in accordance with 9VAC20-81-470 or 9VAC20-81-475. The leachate management plan shall include the following:
1. An estimate of the quality and quantity of leachate to be produced annually by the facility. The estimate shall include the 30-day leachate volume and average flow rate of each month of the year. A separate estimate shall be submitted for anticipated leachate generation at the end of five year increments of operation for 20 years, or until closure, whichever date is earlier. For existing facilities, current leachate generation shall be included with this separate estimate.
2. A narrative description of the proposed leachate collection and handling system design specifying construction materials. The leachate collection system shall be designed, and constructed, and operated to maintain less than a 30 cm depth of leachate over the liner, excluding manifold trenches and sumps.
3. Plans, designs, and cross sections for the proposed collection and handling system.
4. Plans A narrative description of the leachate storage, treatment, and disposal methods meeting the requirements of subsections B through E of this section along with plans, designs, and cross sections for onsite leachate storage or treatment systems, including system appurtenances for storage, monitoring, pretreatment, or treatment of leachate from the facility.
5. A description of routine leachate maintenance activities.
6. Leachate monitoring protocols to include routine sampling and analysis activities. Unless otherwise approved by the director, sanitary landfills subject to MACT AAAA shall sample and analyze their leachate annually for acetone, ammonia, biological oxygen demand (BOD), chemical oxygen demand (COD), the BOD:COD ratio, pH, and total suspended solids. Sampling and analysis of the leachate performed by the receiving wastewater treatment facility can be performed in lieu of monitoring by the facility. The sampling, analysis and quality control/quality assurance methods set forth in EPA document SW-846 shall be used.
B. Tanks and surface impoundments used for storage of leachate shall have a flow equalization and surge capacity at least equal to the maximum expected production of leachate for any seven-day period for the life of the facility estimated under subdivision A 1 of this section. Leachate storage capacity may not be considered to include leachate that may have collected in or on the liner system. Storage tanks and impoundments shall be aerated, as necessary, to prevent and control odors.
C. Surface impoundments used for storage of leachate shall be equipped with a liner system that shall provide equal or greater protection of human health and the environment than that provided by the liner of the landfill producing the leachate.
D. The collected leachate shall be:
1. Discharged directly or after pretreatment into a line leading to the publicly owned treatment works or other permitted wastewater treatment facility;
2. Transported by a vehicle to an offsite permitted wastewater treatment facility;
3. Recirculated within the landfill, provided that the irrigated area is underlain by a composite liner or other liner system approved by EPA or Research, Development, and Demonstration plan for recirculation, and that the operation causes no runoff, ponding, or nuisance odors;
4. Treated onsite and discharged into surface water when authorized under VPDES permit; or
5. Other methods of treatment or disposal as approved by the department.
E. The collected leachate shall not be discharged to an underground drain field.
F. Leachate seeps. If a leachate seep(s) occurs, the owner or operator shall repair the seep(s) and do the following:
1. Take all immediate steps necessary to protect public health and safety including those required by the contingency plan.
2. Take immediate action to minimize, control, or eliminate the seep, and to contain and properly manage the leachate at the source of the seep.
3. Any leachate released outside the lined area permitted for waste disposal shall be properly collected and disposed.
G. The department may require the facility to conduct sampling and analysis if necessary to characterize and demonstrate the presence or absence of leachate in a surface water or stormwater collection system or other receptor if a release or discharge of leachate is suspected. The department will determine on a case-by-case basis which tests are appropriate.
H. Recordkeeping. The owner or operator shall keep records of the results of leachate generation, monitoring activities, and any leachate seep issues throughout the active life of the landfill and the postclosure care period. The records shall include:
1. The total annual volume of leachate managed pursuant to allowable methods identified in subsection D;
2. All laboratory analytical results for leachate sampling events required under the leachate monitoring program; and
3. Investigation and repair activities performed in response to leachate seeps.
I. Upon request, monitoring records specified by subsection H of this section and 9VAC20-81-220 B 2 shall be submitted on a schedule and in a format acceptable to the department.
J. The landfill shall notify the department of any unusual condition that may endanger human health and the environment in accordance with 9VAC20-81-530 C 3, such as when the landfill receives a notice of violation from the receiving wastewater treatment plant, a wastewater treatment plant discontinues acceptance of the facility's leachate, or an unauthorized discharge of leachate to surface water occurs.
A. Owners or operators of sanitary landfills shall perform landfill gas and leachate monitoring in accordance with 9VAC20-81-200 and 9VAC20-81-210, unless otherwise approved by the director, and implement proactive measures and corrective actions in response to rising landfill temperatures and changes in gas and leachate composition that are indicators of elevated temperature landfills as outlined in this section.
B. Owners or operators of landfills that have approval through 40 CFR 63.1958(c)(2) to operate gas collection wells at temperatures above 145 degrees Fahrenheit and less than or equal to 170 degrees Fahrenheit shall perform additional monitoring and implement proactive measures in accordance with this subsection to respond to rising temperatures. Such actions include:
1. Increased landfill gas monitoring. In addition to monitoring for methane, carbon dioxide, and calculating the methane to carbon dioxide ratio as specified in 9VAC20-81-200 B 4, owners or operators of landfill gas collection wells with approved higher operating value (HOV) temperatures shall perform additional monitoring as outlined by the Department’s HOV approval pursuant to 40 CFR 63.1958(c)(2).
2. Additional leachate monitoring, unless otherwise approved by the director. In addition to performing leachate sampling and analysis as specified in 9VAC20-81-210 A 6, owners or operators shall also sample leachate for ETLF indicator parameters, including benzene, methyl ethyl ketone, and phenol. Sampling frequency shall be increased to quarterly, and to the extent feasible, leachate samples should be collected directly from the leachate discharge or side slope riser for the areas of the landfill with HOV wells.
3. Evaluate effectiveness of landfill gas collection and control system materials and operation. If well materials are at risk due to higher operating temperatures, develop a plan to replace or repair HOV wells. Additionally, evaluate current leachate management strategies and consider potential pretreatment systems and alternate disposal methods.
4. Within 120 days of HOV approval, update Landfill Gas and Leachate Management Plans to incorporate the additional monitoring specified in this subsection and outline facility-specific proactive measures to be implemented. Financial assurance cost estimates shall also be updated in accordance with 9VAC20-70. If the Landfill Gas or Leachate Management Plans have previously been updated, provide justification that changes to the plans are not necessary based on current implementation and HOV approvals.
C. When the landfill exhibits gas collection well temperatures above regulatory thresholds of MACT AAAA which are greater than 170 degrees Fahrenheit over 15 days, the owner or operator shall, within 120 days of detection:
1. Implement an ETLF corrective action plan and submit it to the department for modification of the landfill permit. The plan shall include information in the Gas Collection and Control System Design Plan as outlined in 40 CFR 63.1981(e) to include alternatives as outlined in 40 CFR 63.1981(d)(2) and the following information:
a. Area(s) of the landfill exhibiting ETLF conditions;
b. Corrective action activities associated with controlling and remediating elevated temperatures, leachate releases, landfill instability, odor impacts, and other corrective actions, as applicable;
c. An implementation schedule specifying timeframes for implementing corrective actions, an evaluation of the effectiveness of such corrective actions, and milestones for proceeding in implementation of additional corrective actions, if necessary; and
d. Corrective action cost estimate in accordance with 9VAC20-70-113 for the purpose of financial assurance.
2. Provide additional financial assurance to the department as required by 9VAC20-70-113 using the mechanisms required in 9VAC20-70-140 of the Financial Assurance Regulations for Solid Waste Disposal, Transfer and Treatment Facilities.
D. When landfill gas collection well temperatures no longer exceed 170 degrees Fahrenheit, and all other actions required as part of the corrective action plan have been satisfied or completed, the owner or operator shall notify the director by submitting a certification that corrective action has been completed in accordance with the ETLF corrective action plan and the permit as modified under subsection C of this section. The certification shall be signed by the owner or operator and by a qualified environmental scientist and include all data relevant to demonstrate ETLF corrective action is complete.
E. If the director, based on the review of information presented by the owner or operator in accordance with subsection D of this section, determines that:
1. Corrective actions have been satisfied or completed in accordance with the requirements of the ETLF corrective action plan, the permit as amended and this chapter, the director will release the owner or operator from the requirements for financial assurance for ETLF corrective action under 9VAC20-70; or
2. Corrective actions have not been satisfied or completed in accordance with the requirements of the ETLF corrective action plan, the permit as amended and this chapter, the owner or operator shall remain in ETLF corrective action and meet the financial assurance requirements of 9VAC20-70 until such time as a successful demonstration of corrective action completion is made.
A. General requirements.
1. Applicability.
a. Existing landfills. Owners or operators of all existing landfills shall be in compliance with the groundwater monitoring requirements specified in this section, except as provided for in subdivision 1 c of this subsection. Owners or operators of landfills that were permitted prior to December 21, 1988, but were closed in accordance with the requirements of their permit or existing regulation prior to December 21, 1988, are not required to be in compliance with the groundwater monitoring requirements specified in this section, unless conditions are recognized that classify the landfill as an Open Dump as defined under 9VAC20-81-45.
b. New landfills. Owners or operators of new facilities shall be in compliance with the groundwater monitoring requirements specified in this section before waste can be placed in the landfill except as provided for in subdivision 1 c of this subsection.
c. No migration potential exemption. Groundwater monitoring requirements under this section may be suspended by the director if the owner or operator can demonstrate that there is no potential for migration of any Table 3.1 constituents to the uppermost aquifer during the active life and the postclosure care period of the landfill. This demonstration shall be certified by a qualified groundwater scientist and shall be based upon:
(1) Site-specific field collected measurements including sampling and analysis of physical, chemical, and biological processes affecting contaminant fate and transport; and
(2) Contaminant fate and transport predictions that maximize contaminant migration and consider impacts on human health and the environment.
2. General requirements.
a. Purpose. Owners or operators shall install, operate, and maintain a groundwater monitoring system that is capable of determining the landfill's impact on the quality of groundwater in the uppermost aquifer at the disposal unit boundary during the active life and postclosure care period of the landfill.
b. Program requirements. The groundwater monitoring program shall meet the requirements of subdivision 3 of this subsection and comply with all other applicable requirements of this section.
c. Director authority. The groundwater monitoring and reporting requirements set forth here are minimum requirements. The director may require, by modifying the permit as allowed under 9VAC20-81-600 E, any owner or operator to install, operate, and maintain a groundwater monitoring system and conduct a monitoring program that contains requirements more stringent than this chapter imposes whenever it is determined that such requirements are necessary to protect human health and the environment.
3. Groundwater monitoring system.
a. System requirements. A groundwater monitoring system shall be installed consisting of a sufficient number of monitoring wells, at appropriate locations and depths, capable of yielding sufficient quantities of groundwater for sampling and analysis purposes from the uppermost aquifer that:
(1) Represent the quality of background groundwater that has not been affected by a release from the landfill; and
(2) Represent the quality of groundwater at the disposal unit boundary. The downgradient monitoring system shall be installed at the disposal unit boundary in a manner that ensures detection of groundwater contamination in the uppermost aquifer unless a variance has been granted by the director under 9VAC20-81-740.
(3) When physical obstacles preclude installation of groundwater monitoring wells at the disposal unit boundary, the downgradient monitoring wells may be installed at the closest practicable distance hydraulically downgradient from the boundary in locations that ensure detection of groundwater contamination in the uppermost aquifer.
b. Multiunit systems. The director may approve a groundwater monitoring system that covers multiple waste disposal units instead of requiring separate groundwater monitoring systems for each unit when the landfill has several units, provided the multiunit groundwater monitoring system meets the requirement of subdivision 3 of this subsection and can be demonstrated to be equally protective of human health and the environment as individual monitoring systems. The system for each waste disposal unit would be based on the following factors:
(1) Number, spacing, and orientation of the waste disposal units;
(2) Hydrogeologic setting;
(3) Site history;
(4) Engineering design of the waste disposal units; and
(5) Type of waste accepted at the waste disposal units.
c. Well construction. All monitoring wells shall be of a size adequate for sampling and shall be cased and grouted in a manner that maintains the integrity of the monitoring well bore hole. This casing shall be screened or perforated, and packed with gravel or sand where necessary, to enable sample collection at depths where appropriate aquifer flow zones exist. The annular space above the sampling depth shall be sealed with a suitable material to prevent contamination of samples and the groundwater.
d. Boring logs. A log shall be made of each newly installed monitoring well describing the soils or rock encountered, and the hydraulic conductivity of the geologic units (formations) encountered. A copy of the final log(s) with appropriate maps, including at a minimum a site plan showing the location of all monitoring wells, the total depth of monitoring well, the location of the screened interval, the top and bottom of sand or gravel pack, and the top and bottom of the seal shall be sent to the department with the certification required under subdivision 3 g of this subsection.
e. Well maintenance. The monitoring wells, piezometers, and other groundwater measurement, sampling, and analytical devices shall be operated and maintained in a manner that allows them to perform to design specifications throughout the duration of the groundwater monitoring program. Nonfunctioning monitoring wells must be replaced or repaired upon recognition of damage or nonperformance. Well repair or replacement shall be coordinated with the department prior to initiating the action.
f. Network specifics. The network shall include at least one upgradient monitoring well and at least three downgradient monitoring wells. The number, spacing, and depths of monitoring wells included in a landfill's network shall be determined based on:
(1) Site-specific technical information that shall include thorough characterization by the owner or operator of:
(a) The thickness of any unsaturated geologic units or fill materials that may overlay the uppermost aquifer;
(b) The thickness and description of materials comprising the uppermost aquifer;
(c) Materials comprising the confining unit defining the lower boundary of the uppermost aquifer, including, but not limited to, thicknesses, stratigraphy, lithology, hydraulic conductivities, porosities, and effective porosities; and
(d) The calculated groundwater flow rate and direction within the uppermost aquifer including any seasonal and temporal fluctuations in groundwater flow.
(2) The lateral spacing between downgradient monitoring wells based on site-specific information supplied under subdivision 3 f (1) of this subsection.
g. Monitoring well certification. The groundwater monitoring well(s) shall, within 30 days of well(s) installation, be certified by a qualified groundwater scientist noting that all wells have been installed in accordance with the documentation submitted under subdivision 3 d of this subsection. Within 14 days of completing this certification, the owner or operator shall transmit the certification to the department.
4. The groundwater sampling and analysis requirements for the groundwater monitoring system are as follows:
a. Quality assurance and control. The groundwater monitoring program shall include consistent field sampling and laboratory analysis procedures that are designed to ensure monitoring results that provide an accurate representation of the groundwater quality at the background and downgradient wells. At a minimum the program shall include procedures and techniques for:
(1) Sample collection;
(2) Sample preservation and shipment;
(3) Analytical procedures;
(4) Chain of custody control; and
(5) Quality assurance and quality control.
b. Analytical methods. The groundwater monitoring program shall include sampling and analytical methods that are appropriate for groundwater sampling and that accurately measure solid waste constituents in groundwater samples. Groundwater samples obtained pursuant to 9VAC20-81-250 B or C shall not be filtered prior to laboratory analysis. The sampling, analysis and quality control/quality assurance methods set forth in EPA document SW-846, as amended, shall be used. The department may require re-sampling if it believes the samples were not properly sampled or analyzed.
c. Groundwater rate and flow. Groundwater elevations at each monitoring well shall be determined immediately prior to purging each time a sample is obtained. The owner or operator shall determine the rate and direction of groundwater flow each time groundwater is sampled pursuant to subsection B or C of this section or 9VAC20-81-260. Groundwater elevations in wells that monitor the same waste disposal unit or units shall be measured within a period of time short enough to avoid temporal variations, which could preclude accurate determination of groundwater flow rate and direction.
d. Background data. The owner or operator shall establish background groundwater quality in a hydraulically upgradient or background well, or wells, for each of the monitoring parameters or constituents required in the particular groundwater monitoring program that applies to the landfill. Background groundwater quality may be established at wells that are not located hydraulically upgradient from the landfill if they meet the requirements of subdivision 4 e of this subsection.
e. Alternate well provision. A determination of background quality may be based on sampling of wells that are not upgradient from the waste disposal unit or units where:
(1) Hydrogeologic conditions do not allow the owner or operator to determine what wells are upgradient; and
(2) Sampling at these wells will provide an indication of background groundwater quality that is as representative or more representative than that provided by the upgradient wells.
f. Sampling and statistics. The number of samples collected to establish groundwater quality data shall be consistent with the appropriate statistical procedures determined pursuant to subdivision 4 g of this subsection.
g. Statistical methods. The owner or operator shall specify in the Groundwater Monitoring Plan the statistical method(s) listed in subsection D of this section that will be used in evaluating groundwater monitoring data for each monitoring constituent. The statistical test(s) chosen shall be applied separately for each groundwater constituent in each well after each individual sampling event required under subdivision B 2 or 3, C 2 or 3, or as required under 9VAC20-81-260 E 1.
h. Evaluation and response. After each sampling event required under subsection B or C of this section, the owner or operator shall determine whether or not there is a statistically significant increase over background values for each groundwater constituent required in the particular groundwater monitoring program by comparing the groundwater quality of each constituent at each monitoring well installed pursuant to subdivision 3 a of this subsection to the background value of that constituent. In determining whether a statistically significant increase has occurred, the owner or operator shall:
(1) Ensure the sampling result comparisons are made according to the statistical procedures and performance standards specified in subsection D of this section;
(2) Ensure that within 30 days of completion of sampling and laboratory analysis actions, the determination of whether there has been a statistically significant increase over background at each monitoring well has been completed; and
(3) If identified, the statistically significant increase shall be reported to the department within the notification timeframes identified in subsection B or C of this section and discussed in the quarterly or semi-annual report submission described under subdivision E 2 c of this section. Notifications qualified as being "preliminary," "suspect," "unverified," or otherwise not a final determination of a statistical exceedance will not be accepted.
i. Verification sampling. The owner or operator may at any time within the 30-day statistically significant increases determination period defined under subdivision A 4 h (2) of this section, obtain verification samples if the initial review of analytical data suggests results that might not be an accurate reflection of groundwater quality at the disposal unit boundary. Undertaking verification sampling is a voluntary action on the part of the owner or operator and shall not alter the timeframes associated with determining or reporting a statistically significant increase as otherwise defined under subdivision A 4 h (2), B 2 or 3, or C 2 or 3 of this section.
j. Data validation. The owner or operator may at any time within the 30-day statistically significant increases determination period defined under subdivision A 4 h (2) of this subsection, undertake third-party data validation of the analytical data received from the laboratory. Undertaking such validation efforts is a voluntary action on the part of the owner or operator and shall not alter the timeframes associated with determining or reporting a statistically significant increase as otherwise defined under subdivision A 4 h (2), B 2 or 3, or C 2 or 3 of this section.
5. Alternate source demonstration allowance.
a. Allowance. As a result of any statistically significant increase identified while monitoring groundwater under subdivision B 2 or 3, or C 2 or 3 of this section, or at anytime within the Corrective Action process under 9VAC20-81-260, the owner or operator has the option of submitting an Alternate Source Demonstration report, certified by a qualified groundwater scientist, demonstrating:
(1) A source other than the landfill caused the statistical exceedance;
(2) The exceedance resulted from error in sampling, analysis, or evaluation; or
(3) The exceedance resulted from a natural variation in groundwater quality.
b. Timeframes. A successful demonstration must be made within 90 days of noting a statistically significant increase. The director may approve a longer timeframe for submittal and approval of the Alternate Source Demonstration with appropriate justification.
c. Evaluation and response. Based on the information submitted in accordance with subdivision 5 a of this subsection, the director will:
(1) In the case of the successful demonstration of an error in sampling, analysis, or evaluation, allow the owner or operator to continue monitoring groundwater in accordance with the monitoring program in place at the time of the statistical exceedance.
(2) In the case of a successful demonstration of an alternate source for the release or natural variability in the aquifer matrix:
(a) Require changes in the groundwater monitoring system as needed to accurately reflect the groundwater conditions and allow the owner or operator to continue monitoring groundwater in accordance with the monitoring program in place at the time of the statistical exceedance;
(b) Require any changes to the monitoring system be completed prior to the next regularly scheduled groundwater monitoring event or within 90 days (whichever is greater); and
(c) Require any changes to the monitoring system be approved via the modification process under 9VAC20-81-600 within 90 days of the approval of the alternate source demonstration.
(3) In the case of an unsuccessful Alternate Source Demonstration, require the owner or operator to initiate the actions that would otherwise be required as a result of the statistically significant increase noted under subdivision B 2 or 3, or C 2 or 3 of this section as appropriate.
6. Establishment of groundwater protection standards.
a. Requirement. Upon recognition of a statistically significant increase over background and while monitoring in the Assessment or Phase II monitoring programs defined under subdivision B 3 or C 3 of this section, the owner or operator shall propose a groundwater protection standard for all detected Table 3.1 Column B constituents. The proposed standards shall be submitted to the department by a qualified groundwater scientist and be accompanied by relevant historical groundwater sampling data to justify the proposed concentration levels.
b. Establishment process. The groundwater protection standards shall be established in the following manner:
(1) For constituents for which a maximum contaminant level (MCL) has been promulgated under § 1412 of the Safe Drinking Water Act (40 CFR Part 141), the MCL for that constituent shall be automatically established as the groundwater protection standard upon submission of the proposed standards.
(2) If the owner or operator determines that a site-specific background concentration is greater than the MCL associated with that constituent under subdivision 6 b (1) of this subsection, the background value may be substituted for use as the groundwater protection standard in lieu of the MCL for that constituent upon receiving written department approval.
(3) For constituents for which no MCL has been promulgated, site-specific background concentration value(s) may be used upon receiving written department approval.
(4) For constituents for which no MCL has been promulgated, a risk-based alternate concentration levels may be used if approved by the director as long as:
(a) The owner or operator submits a request to the department asking for approval to use risk-based alternate concentration levels for a specific list of constituents and identifies that these constituents lack an MCL. In the request the owner or operator shall specify whether site-specific, independently calculated, risk-based alternate concentration levels will be applied, or if the facility will accept the default department-provided limits.
(b) The alternate concentration levels that may be provided as default values by the department and those independently calculated by the owner or operator are demonstrated to meet the following criteria or factors before they can be used as groundwater protection standards:
(i) Groundwater quality - The potential for adverse quality effects considering the physical and chemical characteristics of the waste in the landfill, its potential for migration in the aquifer; the hydrogeological characteristics of the facility and surrounding land; the rate and direction of groundwater flow; the proximity and withdrawal rates of groundwater users; the current and future uses of groundwater in the area; the existing quality of groundwater, including other sources of contamination and their cumulative impact on the groundwater quality.
(ii) Human exposure - Potential for health risks caused by exposure to waste constituents released from the landfill using federal guidelines for assessing the health risks of environmental pollutants; scientifically valid studies conducted in accordance with the Toxic Substances Control Act Good Laboratory Practice Standards (40 CFR Part 792); or equivalent standards. For carcinogens, the alternate concentration levels must be set based on a lifetime cancer risk level due to continuous lifetime exposure within the 1x10-4 to 1x10-6 range. For systemic toxicants, alternate concentration levels must be demonstrated to be levels to which the human population (including sensitive subgroups) could be exposed to on a daily basis without the likelihood of appreciable risk of deleterious effects during a lifetime.
(iii) Surface water - The potential adverse effect on hydraulically connected surface water quality based on the volume, physical and chemical characteristics of the waste in the landfill; the hydrogeological characteristics of the facility and surrounding land; the rate and direction of groundwater flow; the patterns of rainfall in the region; the proximity of the landfill to surface waters; the current and future uses of surface waters in the area and any water quality standards established for those surface waters; the existing quality of surface water, including other sources of contamination and the cumulative impact on surface water quality.
(iv) Other adverse effects - Potential damage to wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents; the persistence and permanence of the potential adverse effects; and the potential for health risks caused by human exposure to waste constituents using factors shown in subdivision b (4) (b) (ii) of this subsection.
(5) In making any determination regarding the use of alternate concentration levels under this section, the director will:
(a) Consider any identification of underground sources of drinking water as identified by EPA under 40 CFR 144.7,
(b) Consider additional or modified monitoring requirements or control measures,
(c) Include a schedule for the periodic review of the alternate concentration levels, or
(d) Approve the alternate concentration levels as proposed or issue modified alternate concentration levels.
c. Implementation. Groundwater protection standards shall be considered established for the facility upon completion of the actions described under either subdivision A 6 b (1), (2), (3) or if necessary (4) and shall be placed in the facility Operating Record and shall be used during subsequent comparisons of groundwater sampling data consistent with the requirements of subdivision B 3 f or C 3 e of this section.
d. MCL and background revisions. After establishment of groundwater protection standards under subdivision B 6 b, if the standards are modified as a result of revisions to any MCL or department-approved background, the facility shall update its listing of groundwater protection standards and shall place the new list in the Operating Record and shall use the new values during subsequent comparisons of sampling data consistent with the requirements of subdivision B 3 f or C 3 e of this section.
e. Alternate concentration levels revisions. After establishment of groundwater protection standards under subdivision B 6 b of this section, if the department-approved alternate concentration levels change based on information released by EPA, to the extent practical, the department will issue revisions to the alternate concentration levels for facility use no more often than an annual basis. The facility shall use the alternate concentration levels listing in effect at the time the sampling event takes place when comparing the results against the groundwater protection standards under subdivision B 3 f or C 3 e of this section.
B. Monitoring for sanitary landfills.
1. Applicability.
a. Existing facilities. Except for those sanitary landfills identified in subdivision C 1 of this section, existing sanitary landfill facilities and closed facilities that have accepted waste on or after October 9, 1993, and in the case of 'small' landfills on or after April 9, 1994, shall be in compliance with the detection monitoring requirements specified in subdivision 2 of this subsection unless existing sampling data requires a move to assessment monitoring described under subdivision 3 of this subsection.
b. New facilities. Facilities placed in operation to receive waste after October 9, 1993, shall be in compliance with the detection monitoring requirements specified in subdivision 2 of this section before waste can be placed in the landfill unless existing sampling data requires a move to assessment monitoring described under subdivision 3 of this subsection.
c. Closed facilities. Unless an extension to the deadline above has been granted by the director, closed facilities that have ceased to accept any waste on or before October 9, 1993, and in the case of a "small" landfill, before April 9, 1994, may comply with the "State Monitoring Program" monitoring requirements specified in subdivision C 2 or 3 of this section.
d. Other facilities. Owners or operators of disposal facilities not subject to the federal groundwater monitoring requirements prescribed under 40 CFR Parts 257 and 258 must perform the groundwater monitoring described in subdivision C 2 or 3 of this section.
e. Proximity to wetlands. Owners or operators of sanitary landfills that accepted waste after June 30, 1999, must:
(1) Perform quarterly groundwater monitoring unless the director determines that less frequent monitoring is necessary consistent with the requirements of the special provisions regarding wetlands in § 10.1-1408.5 of the Code of Virginia.
(2) The quarterly monitoring frequency shall remain in effect until the department is notified waste is no longer being accepted at the sanitary landfill.
(3) This requirement will not limit the authority of the Waste Management Board or the director to require more frequent groundwater monitoring if required to protect human health and the environment.
(4) For purposes of this subdivision "proximity to wetlands" shall be defined as landfills that were constructed on a wetland, have a potential hydrologic connection to such a wetland in the event of an escape of liquids from the facility, or are within a mile of such a wetland.
2. Detection monitoring program.
a. Sampling requirements. All sanitary landfills shall implement detection monitoring except as otherwise provided in subdivision 1 of this subsection. The monitoring frequency for all constituents listed in Table 3.1 Column A shall be as follows:
(1) Initial sampling period.
(a) For facilities that monitor groundwater on a semi-annual basis, a minimum of four independent samples from each well (background and downgradient) shall be collected and analyzed for the Table 3.1 Column A constituents during the first semi-annual sampling period. A semi-annual period is defined under 9VAC20-81-10.
(b) For facilities that monitor groundwater on a quarterly basis as a result of subdivision 1 e of this subsection, a minimum of four samples from each well (background and downgradient) shall be collected and analyzed for the Table 3.1 Column A constituents. The samples shall be collected within the first quarterly period, using a schedule that ensures, to the greatest extent possible, an accurate calculation of background concentrations.
(2) Subsequent sampling events. At least one sample from each well (background and downgradient) shall be collected and analyzed during subsequent semi-annual or quarterly events during the active life and postclosure period. Data from subsequent background sampling events may be added to the previously calculated background data so that the facility maintains the most accurate representation of background groundwater quality with which to carry out statistical analysis required under subdivision A 4 h of this section.
(3) Alternate sampling events. The director may specify an appropriate alternate frequency for repeated sampling and analysis during the active life (including closure) and the postclosure care period. The alternate frequency during the active life (including closure) and the postclosure period shall be no less than annual. The alternate frequency shall be based on consideration of the following factors:
(a) Lithology of the aquifer and unsaturated zone;
(b) Hydraulic conductivity of the aquifer and unsaturated zone;
(c) Groundwater flow rates;
(d) Minimum distance between upgradient edge of the disposal unit boundary and downgradient monitoring well screen (minimum distance of travel); and
(e) Resource value of the aquifer.
b. Evaluation and response. If the owner or operator determines under subdivision A 4 h of this section, that there is:
(1) A statistically significant increase over background as determined by a method meeting the requirements of subsection D of this section, for one or more of the constituents listed in Table 3.1 Column A at any of the monitoring wells at the disposal unit boundary during any detection monitoring sampling event, the owner or operator shall:
(a) Within 14 days of this finding, notify the department of this fact, indicating which constituents have shown statistically significant increases over background levels; and
(b) Within 90 days, (i) establish an assessment monitoring program meeting the requirements of subdivision 3 of this subsection, or (ii) submit an Alternate Source Demonstration as specified in subdivision A 5 of this section. If, after 90 days, a successful demonstration has not been made, the owner or operator shall initiate an assessment monitoring program as otherwise required in subdivision 3 of this subsection. The 90-day Alternate Source Demonstration period may be extended by the director for good cause.
(2) No statistically significant increase over background as determined by a method meeting the requirements of subsection D of this section, for any of the constituents listed in Table 3.1 Column A at any of the monitoring wells at the disposal unit boundary during any detection monitoring sampling event; the owner or operator may remain in detection monitoring and include a discussion of the sampling results and statistical analysis in the semi-annual or quarterly report required under subdivision E 2 c of this section.
3. Assessment monitoring program. The owner or operator shall implement the assessment monitoring program whenever a statistically significant increase over background has been detected during monitoring conducted under the detection monitoring program.
a. Sampling requirements. Within 90 days of recognizing a statistically significant increase over background for one or more of the constituents listed in Table 3.1 Column A, the owner or operator shall, unless in receipt of an approval to an Alternate Source Demonstration under subdivision A 5 of this section or a director-approved extension, conduct the initial assessment monitoring sampling event for the constituents found in Table 3.1 Column B. A minimum of one sample from each well installed under subdivision A 3 a of this section shall be collected and analyzed during the initial and all subsequent annual Table 3.1 Column B sampling events.
b. Director provisions:
(1) The owner or operator may request that the director approve an appropriate subset of monitoring wells that may remain in detection monitoring defined under subdivision 2 of this subsection, based on the results of the initial, or subsequent annual Table 3.1 Column B sampling events. Monitoring wells may be considered for the subset if:
(a) They show no detections of Table 3.1 Column B constituents other than those already previously detected in detection monitoring defined under subdivision 2 of this subsection; and
(b) They display no statistically significant increases over background for any constituents on the Table 3.1 Column A list. If an increase is subsequently recognized in a well approved for the subset, the well shall no longer be considered part of the detection monitoring subset.
(2) The owner or operator may request the director delete any of the Table 3.1 Column B monitoring constituents from the assessment monitoring program if the owner or operator demonstrates that the deleted constituents are not reasonably expected to be in or derived from the waste.
(3) The director may specify an appropriate alternate frequency for repeated sampling and analysis for the full set of Table 3.1 Column B constituents required by subdivision 3 a of this subsection during the active life and postclosure care period based on the consideration of the following factors:
(a) Lithology of the aquifer and unsaturated zone;
(b) Hydraulic conductivity of the aquifer and unsaturated zone;
(c) Groundwater flow rates;
(d) Minimum distance between upgradient edge of the disposal unit boundary and downgradient monitoring well screen (minimum distance of travel);
(e) Resource value of the aquifer; and
(f) Nature (fate and transport) of any constituents detected in response to subdivision 3 f of this subsection.
c. Development of background. After obtaining the results from the initial or subsequent annual sampling events required in subdivision 3 a of this subsection, the owner or operator shall:
(1) Within 14 days, notify the department identifying the Table 3.1 Column B constituents that have been detected;
(2) Within 90 days, and on at least a semi-annual basis thereafter, resample all wells installed under subdivision A 3 a of this section, conduct analyses for all constituents in Table 3.1 Column A as well as those constituents in Column B that are detected in response to subdivision 3 a of this subsection and subsequent Table 3.1 Column B sampling events as may be required of this section, and report this data in the semi-annual or quarterly report defined under subdivision E 2 c of this section;
(3) Within 180 days of the initial sampling event, establish background concentrations for any Table 3.1 Column B constituents detected pursuant to subdivision B 3 a of this subsection. A minimum of four independent samples from each well (background and downgradient) shall be collected and analyzed to establish background for the detected constituents.
d. Establishment of groundwater protection standards. Within 30 days of establishing background under subdivision 3 c (3) of this subsection, submit proposed groundwater protection standards for all constituents detected under Assessment monitoring. The groundwater protection standards shall be approved by the director in accordance with the provisions of subdivision A 6 of this section.
e. Groundwater monitoring plan. No later than 60 days after approval of the groundwater protection standards in accordance with subdivision A 6 of this section, the owner or operator shall submit an updated Groundwater Monitoring Plan that details the site monitoring well network and sampling and analysis procedures undertaken during groundwater monitoring events. The owner or operator shall additionally:
(1) No later than 30 days after the submission of the Groundwater Monitoring Plan, request a permit modification to incorporate the plan and related groundwater monitoring modules into the landfill's permit in accordance with 9VAC20-81-600. The department may waive the requirement for a permit modification if the Groundwater Monitoring Plan included in the landfill's permit reflects current site conditions in accordance with the regulations.
(2) If the 30-day timeframe specified in subdivision 3 e (1) of this subsection is exceeded, the director will modify the permit in accordance with 9VAC20-81-600 E.
f. Evaluation and response.
(1) If the concentrations of all Table 3.1 Column B constituents are shown to be at or below background values, using the statistical procedures in subsection D of this section, for two consecutive Table 3.1 Column B sampling events, the owner or operator shall notify the director of this finding in the semi-annual or quarterly monitoring report and may return to detection monitoring defined under subdivision 2 of this subsection.
(2) If the concentrations of any Table 3.1 Column B constituents are found to be above background values, but below the groundwater protection standards established under subdivision A 6 of this section using the statistical procedures in subsection D of this section, the owner or operator shall continue in assessment monitoring in accordance with this section and present the findings to the department in the semi-annual or quarterly report.
(3) If one or more Table 3.1 Column B constituents are detected at statistically significant levels above the groundwater protection standard established under subdivision A 6 of this section using the statistical procedures in subsection D of this section, the owner or operator shall:
(a) Within 14 days of this finding, notify the department identifying the Table 3.1 Column B constituents that have exceeded the groundwater protection standard. The notification will include a statement that within 90 days the owner or operator will either:
(i) Undertake characterization and assessment actions required under 9VAC20-81-260 C 1; or
(ii) Submit an Alternate Source Demonstration as specified in subdivision A 5 of this section. If a successful demonstration is made within 90 days, the owner or operator may continue monitoring in accordance with the assessment monitoring program pursuant to subdivision 3 of this subsection. If the 90-day period passes without demonstration approval, the owner or operator shall comply with the actions under 9VAC20-81-260 C within the timeframes specified unless the director has granted an extension to those timeframes.
(b) Describe the results in the semi-annual or quarterly report.
C. Monitoring for CDD, industrial, and State Monitoring Program sanitary landfills.
1. Applicability.
a. Sanitary landfills. Owners or operators of sanitary disposal facilities that have ceased to accept solid waste prior to the federally imposed deadline of October 9, 1993, or in the case of a "small landfill" before April 9, 1994, are eligible, with the director's approval, to conduct the state groundwater monitoring program described in this section in lieu of the groundwater monitoring program required under subdivision B 2 or 3 of this section.
b. CDD and industrial landfills. Owners or operators of CDD and industrial landfills not subject to the federal groundwater monitoring requirements prescribed under 40 CFR Parts 257 and 258 shall perform the groundwater monitoring described in this section.
c. Other landfills. All other landfills excluding sanitary landfills, including those that accepted hazardous waste from very small quantity generators after July 1, 1998, shall perform the groundwater monitoring described in this section.
2. First determination monitoring program.
a. Sampling requirements. A first determination monitoring program shall consist of a background-establishing period followed by semi-annual sampling and analysis for the constituents shown in Table 3.1 Column A at all wells installed under subdivision A 3 a of this section. Within 14 days of each event during first determination monitoring, notify the department identifying the Table 3.1 Column A constituents that have been detected.
b. Development of background. Within 360 days of the initial first determination sampling event:
(1) Establish background concentrations for any constituents detected pursuant to subdivision 2 a of this subsection.
(a) A minimum of four independent samples from each well (background and downgradient) shall be collected and analyzed to establish background concentrations for the detected constituents using the procedures in subsection D of this section.
(b) In those cases where new wells are installed downgradient of waste disposal units that already have received waste, but these wells have not yet undergone their initial sampling event, collection of four independent samples for background development will not be required.
(2) Within 30 days of completing the background calculations required under subdivision 2 b (1) (a) of this subsection, submit a first determination report, signed by a qualified groundwater scientist, to the department which must include a summary of the background concentration data developed during the background sampling efforts as well as the statistical calculations for each constituent detected in the groundwater during the background sampling events.
c. Semi-annual sampling and analysis. Within 90 days of the last sampling event during the background-establishing period and at least semi-annually thereafter, sample each monitoring well in the compliance network for analysis of the constituents in Table 3.1 Column A.
d. Evaluation and response. Upon determination of site background under subdivision 2 b (1) (a) of this subsection, the results of all subsequent first determination monitoring events shall be assessed as follows:
(1) If no Table 3.1 Column A constituents are found to have entered the groundwater at statistically significant levels over background, the owner or operator shall:
(a) Remain in first determination monitoring; and
(b) May request the director delete any Table 3.1 Column A constituents from the semi-annual sampling list if the owner or operator demonstrates that the proposed deleted constituents are not reasonably expected to be in or derived from the waste.
(2) If the owner or operator recognizes a statistically significant increase over background for any Table 3.1 Column A constituent, within 14 days of this finding, the owner or operator shall notify the department identifying the Table 3.1 Column A constituents that have exceeded background levels. The notification will include a statement that within 90 days the owner or operator shall:
(a) Initiate a Phase II sampling program; or
(b) Submit an Alternate Source Demonstration under subdivision A 5 of this section.
(3) If a successful demonstration is made and approved within the timeframes established under subdivision A 5 of this section, the owner or operator may remain in First Determination monitoring.
(4) If a successful demonstration is not made and approved within the timeframes established under subdivision A 5 of this section, the owner or operator shall initiate Phase II monitoring in accordance with the timeframes in subdivision C 3 of this section. The director may approve a longer timeframe with appropriate justification.
3. Phase II monitoring.
a. Sampling requirements. The owner or operator shall:
(1) Within 90 days of noting the exceedance over background determined under subdivision C 2 d of this section, sample the groundwater in all monitoring wells installed under subdivision A 3 a of this section for all Table 3.1 Column B constituents;
(2) After completing the initial Phase II sampling event, continue to sample and analyze groundwater on a semi-annual basis within the Phase II monitoring program;
b. Background development. If no additional Table 3.1 Column B constituents are detected other than those previously detected under Column A, which already have established their background levels, the owner or operator shall follow the requirements under subdivision 3 c of this subsection regarding groundwater protection standard establishment while continuing to sample for the Table 3.1 Column A list on a semi-annual basis. If one or more additional Table 3.1 Column B constituents are detected during the initial Phase II sampling event:
(1) Within 360 days, establish a background value for each additional detected Table 3.1 Column B constituent.
(2) Submit a Phase II Background report within 30 days of completing the background calculations including a summary of the background concentration data for each constituent detected in the groundwater during the Table 3.1 Column B background sampling events.
(3) If any detected Table 3.1 Column B constituent is subsequently not detected for a period of two years, the owner or operator may petition the director to delete the constituent from the list of detected Table 3.1 Column B constituents that must be sampled semi-annually.
c. Establishment of groundwater protection standards. No later than:
(1) Thirty days after submitting the Phase II Background report required under the provisions of subdivision 3 b (2) of this subsection, or within 30 days of obtaining the results from the initial Table 3.1 Column B sampling event indicating no further sampling for background determination is necessary, the owner or operator shall propose a groundwater protection standard for all detected Table 3.1 constituents.
(2) The groundwater protection standard proposed shall be established in a manner consistent with the provisions in subdivision A 6 of this section.
d. Groundwater monitoring plan. No later than 60 days after establishment of groundwater protection standards in accordance with subdivision A 6 of this section, the owner or operator shall submit an updated Groundwater Monitoring Plan that details the site monitoring well network and sampling and analysis procedures undertaken during groundwater monitoring events. The department may waive the requirement for an updated plan if the Groundwater Monitoring Plan included in the landfill's permit reflects current site conditions in accordance with the regulations.
(1) No later than 30 days after the submission of the Groundwater Monitoring Plan, the owner or operator shall request a permit modification to incorporate the updated plan and related groundwater monitoring modules into the landfill's permit in accordance with 9VAC20-81-600.
(2) If the 30-day timeframe specified in subdivision 3 d (1) of this subsection is exceeded, the director will modify the permit in accordance with 9VAC20-81-600 E.
e. Evaluation and response. After each subsequent Phase II monitoring event following establishment of groundwater protection standards, the concentration of Table 3.1 Column B constituents found in the groundwater at each monitoring well installed pursuant to subdivision A 3 a of this section will be evaluated against the groundwater protection standards. The evaluation will be presented to the department in a semi-annual Phase II report. The evaluation will be as follows:
(1) If all Table 3.1 constituents are shown to be at or below background values, using the statistical procedures in subsection D of this section, for two consecutive Table 3.1 Column B sampling events, the owner or operator shall notify the director of this finding in the semi-annual report and may return to first determination monitoring;
(2) If any Table 3.1 Column B constituents are found to be above background values, but are below the established groundwater protection standard using the statistical procedures in subsection D of this section, the owner or operator shall continue semi-annual Phase II monitoring and present the findings in a semi-annual report;
(3) If one or more Table 3.1 Column B constituents are above the established groundwater protection standard using the statistical procedures in subsection D of this section, the owner or operator shall:
(a) Notify the department within 14 days of this finding. The notification will include a statement that within 90 days the owner or operator will either: (i) undertake the characterization and assessment actions required under 9VAC20-81-260 C 1; or (ii) submit an alternate source demonstration as specified in subdivision A 5 of this section. If a successful demonstration is made within 90 days, the owner or operator may continue monitoring in accordance with Phase II monitoring program. If the 90-day period is exceeded, the owner or operator shall comply with the timeframes of 9VAC20-81-260 C unless the director has granted an extension to those timeframes; and
(b) Present the findings in the semi-annual report.
D. Statistical methods and constituent lists.
1. Acceptable test methods. The following statistical test methods may be used to evaluate groundwater monitoring data:
a. A parametric analysis of variance (ANOVA) followed by multiple comparisons procedures to identify statistically significant evidence of contamination. The method must include estimation and testing of the contrasts between each compliance well's mean and the background mean levels for each constituent.
b. An analysis of variance (ANOVA) based on ranks followed by multiple comparisons procedures to identify statistically significant evidence of contamination. The method must include estimation and testing of the contrasts between each compliance well's median and the background median levels for each constituent.
c. A tolerance or prediction interval procedure in which an interval for each constituent is established from the distribution of the background data, and the level of each constituent in each compliance well is compared to the upper tolerance or prediction limit.
d. A control chart approach that gives control limits for each constituent.
e. Another statistical test method that meets the performance standards specified below. Based on the justification submitted to the department, the director may approve the use of an alternative test. The justification must demonstrate that the alternative method meets the performance standards in subdivision 2 of this subsection.
2. Performance standards. Any statistical method chosen by the owner or operator shall comply with the following performance standards, as appropriate:
a. The statistical method used to evaluate groundwater monitoring data shall be appropriate for the distribution of monitoring parameters or constituents. If the distribution is shown by the owner or operator to be inappropriate for a normal theory test, then the data shall be transformed or a distribution-free theory test shall be used. If the distributions for the constituents differ, more than one statistical method may be needed.
b. If an individual well comparison procedure is used to compare an individual compliance well constituent concentration with background constituent concentrations or a groundwater protection standard, the test shall be done at a Type I error level no less than 0.01 for each testing period. If a multiple comparisons procedure is used, the Type I experiment-wise error rate for each testing period shall be no less than 0.05; however, the Type I error of no less than 0.01 for individual well comparisons must be maintained.
c. If a control chart approach is used to evaluate groundwater monitoring data, the specific type of control chart and its associated parameter values shall be protective of human health and the environment. The parameters shall be determined after considering the number of samples in the background data base, the data distribution, and the range of the concentration values for each constituent of concern.
d. If a tolerance interval or a predictional interval is used to evaluate groundwater monitoring data, the levels of confidence and, for tolerance intervals, the percentage of the population that the interval must contain, shall be protective of human health and the environment. These parameters shall be determined after considering the number of samples in the background data base, the data distribution, and the range of the concentration values for each constituent of concern.
e. The statistical method shall account for data below the limit of detection with one or more statistical procedures that are protective of human health and the environment. Any estimated quantitation limit (EQL) that is used in the statistical method shall be the lowest concentration level that can be reliably achieved within specified limits of precision and accuracy during routine laboratory operating conditions that are available to the landfill.
f. If necessary, the statistical method shall include procedures to control or correct for seasonal and spatial variability as well as temporal correlation in the data.
E. Recordkeeping and reporting.
1. Records pertaining to groundwater monitoring activities shall be retained at a specified location by the owner or operator throughout the active life and postclosure care period of the landfill, and shall include at a minimum:
a. All historical groundwater surface elevation data obtained from wells installed pursuant to subdivision A 3 a of this section;
b. All historical laboratory analytical results for groundwater sampling events required under the groundwater monitoring programs as described in this section;
c. All records of well installation, repair, or abandonment actions;
d. All department correspondence to the landfill; and
e. All approved variances, well subsets, wetlands, or other such director/department approvals.
2. Reporting requirements.
a. Annual report.
(1) An Annual Groundwater Monitoring Report shall be submitted by the owner or operator to the department no later than 120 days from the completion of sampling and analysis conducted under subdivision A 4 h of this section for the second semi-annual event or fourth quarterly event during each calendar year and shall by accompanied by:
(a) A signature page; and
(b) A completed QA/QC DEQ Form ARSC-01.
(2) The technical content of the annual report shall at a minimum, contain the following topical content:
(a) The landfill's name, type, permit number, current owner or operator, and location keyed to a USGS topographic map;
(b) Summary of the design type (i.e., lined versus unlined), operational history (i.e., trench fill versus area fill), and size (acres) of the landfill including key dates such as beginning and termination of waste disposal actions and dates different groundwater monitoring phases were entered;
(c) Description of the surrounding land use noting whether any adjoining land owners utilize private wells as a potable water source;
(d) A discussion of the topographic, geologic, and hydrologic setting of the landfill including a discussion on the nature of the uppermost aquifer (i.e., confined versus unconfined) and proximity to surface waters;
(e) A discussion of the monitoring wells network noting any modifications that were made to the network during the year or any nonperformance issues and a statement noting that the monitoring well network meets (or did not meet) the requirements of subdivision A 3 of this section;
(f) A listing of the groundwater sampling events undertaken during the previous calendar year;
(g) A historical table listing the detected constituents, and their concentrations identified in each well during the sampling period; and
(h) Evaluations of and appropriate responses to the groundwater elevation data; groundwater flow rate as calculated using the prior year's elevation data; groundwater flow direction (as illustrated on a potentiometric surface map); and sampling and analytical data obtained during the past calendar year.
b. Semi-annual or quarterly report.
(1) After each sampling event has been completed for the 1st semi-annual or first, second and third quarterly groundwater sampling events, a semi-annual or quarterly monitoring report shall be submitted under separate cover by the owner or operator to the department no later than 120 days from the completion of sampling and analysis conducted under subdivision A 4 h of this section, unless as allowed under a director-approved extension. The report shall at a minimum contain the following items:
(a) Signature page signed by a professional geologist or qualified groundwater scientist;
(b) Landfill name and permit number;
(c) Statement noting whether or not all monitoring points within the permitted network installed to meet the requirements of subdivision A 3 a of this section were sampled as required under subdivision B 2 or 3 or C 2 or 3 during the event;
(d) Calculated rate of groundwater flow during the sampling period as required under subdivision A 4 c of this section;
(e) The groundwater flow direction as determined during the sampling period as required under subdivision A 4 c of this section presented as either plain text or graphically as a potentiometric surface map;
(f) Statement noting whether or not there were statistically significant increases over background or groundwater protection standards during the sampling period, the supporting statistical calculations, and reference to the date the director was notified of the increase pursuant to timeframes in subdivision B 2 or 3 or C 2 or 3, if applicable;
(g) Copy of the full Laboratory Analytical Report including dated signature page (laboratory manager or representative) to demonstrate compliance with the timeframes of subdivision A 4 h of this section. The department will accept the lab report in CD-ROM format electronically.
(2) In order to reduce the reporting burden on the owner or operator and potential redundancy within the operating record, a discussion of the second semi-annual or fourth quarterly sampling event results may be presented in the Annual Report submission.
c. Other submissions. Statistically significant increase notifications, well certifications, the first determination report, alternate source demonstration, nature and extent study, assessment of corrective measures, presumptive remedy proposal, corrective action plan or monitoring plan, or other such report or notification types as may be required under 9VAC20-81-250 or 9VAC20-81-260, shall be submitted in a manner which achieves the timeframe requirements as listed in 9VAC20-81-250 or 9VAC20-81-260.
|
TABLE 3.1 |
||
|
Column A – Common Name1, 2 |
Column B – Common Name1, 2 |
CAS RN3 |
|
|
Acenaphthene |
83-32-9 |
|
|
Acenaphthylene |
208-96-8 |
|
Acetone |
Acetone |
67-64-1 |
|
|
Acetonitrile; Methyl cyanide |
75-05-8 |
|
|
Acetophenone |
98-86-2 |
|
|
2-Acetylaminofluorene; 2-AAF |
53-96-3 |
|
|
Acrolein |
107-02-8 |
|
Acrylonitrile |
Acrylonitrile |
107-13-1 |
|
|
Aldrin |
309-00-2 |
|
|
Allyl chloride |
107-05-1 |
|
|
4-Aminobiphenyl |
92-67-1 |
|
|
Anthracene |
120-12-7 |
|
Antimony |
Antimony |
(Total) |
|
Arsenic |
Arsenic |
(Total) |
|
Barium |
Barium |
(Total) |
|
Benzene |
Benzene |
71-43-2 |
|
|
Benzo[a]anthracene; Benzanthracene |
56-55-3 |
|
|
Benzo[b]fluoranthene |
205-99-2 |
|
|
Benzo[k]fluoranthene |
207-08-9 |
|
|
Benzo[ghi]perylene |
191-24-2 |
|
|
Benzo[a]pyrene |
50-32-8 |
|
|
Benzyl alcohol |
100-51-6 |
|
Beryllium |
Beryllium |
(Total) |
|
|
alpha-BHC |
319-84-6 |
|
|
beta-BHC |
319-85-7 |
|
|
delta-BHC |
319-86-8 |
|
|
gamma-BHC; Lindane |
58-89-9 |
|
|
Bis(2-chloroethoxy)methane |
111-91-1 |
|
|
Bis(2-chloroethyl) ether; Dichloroethyl ether |
111-44-4 |
|
|
Bis(2-chloro-1-methylethyl) ether; 2, 2'-Dichlorodiisopropyl ether; DCIP |
108-60-1, See note 4 |
|
|
Bis(2-ethylhexyl)phthalate |
117-81-7 |
|
Bromochloromethane;.Chlorobromomethane |
Bromochloromethane;.Chlorobromomethane |
74-97-5 |
|
Bromodichloromethane;.Dibromochloromethane |
Bromodichloromethane;.Dibromochloromethane |
75-27-4 |
|
Bromoform; Tribromomethane |
Bromoform; Tribromomethane |
75-25-2 |
|
|
4-Bromophenyl phenyl ether |
101-55-3 |
|
|
Butyl benzyl phthalate; Benzyl butyl phthalate |
85-68-7 |
|
Cadmium |
Cadmium |
(Total) |
|
Carbon disulfide |
Carbon disulfide |
75-15-0 |
|
Carbon tetrachloride |
Carbon tetrachloride |
56-23-5 |
|
|
Chlordane |
Note 5 |
|
|
p-Chloroaniline |
106-47-8 |
|
Chlorobenzene |
Chlorobenzene |
108-90-7 |
|
|
Chlorobenzilate |
510-15-6 |
|
|
p-Chloro-m-cresol; 4-Chloro-3-methylphenol |
59-50-7 |
|
Chloroethane; Ethyl chloride |
Chloroethane; Ethyl chloride |
75-00-3 |
|
Chloroform; Trichloromethane |
Chloroform; Trichloromethane |
67-66-3 |
|
|
2-Chloronaphthalene |
91-58-7 |
|
|
2-Chlorophenol |
95-57-8 |
|
|
4-Chlorophenyl phenyl ether |
7005-72-3 |
|
|
Chloroprene |
126-99-8 |
|
Chromium |
Chromium |
(Total) |
|
|
Chrysene |
218-01-9 |
|
Cobalt |
Cobalt |
(Total) |
|
Copper |
Copper |
(Total) |
|
|
m-Cresol; 3-methyphenol |
108-39-4 |
|
|
o-Cresol; 2-methyphenol |
95-48-7 |
|
|
p-Cresol; 4-methyphenol |
106-44-5 |
|
|
Cyanide |
57-12-5 |
|
|
2,4-D; 2,4-Dichlorophenoxyacetic acid |
94-75-7 |
|
|
4,4'-DDD |
72-54-8 |
|
|
4,4'-DDE |
72-55-9 |
|
|
4,4'-DDT |
50-29-3 |
|
|
Diallate |
2303-16-4 |
|
|
Dibenz[a,h]anthracene |
53-70-3 |
|
|
Dibenzofuran |
132-64-9 |
|
Dibromochloromethane; Chlorodibromomethane |
Dibromochloromethane; Chlorodibromomethane |
124-48-1 |
|
1,2-Dibromo-3-chloropropane; DBCP |
1,2-Dibromo-3-chloropropane; DBCP |
96-12-8 |
|
1,2-Dibrimoethane; Ethylene dibromide; EDB |
1,2-Dibrimoethane; Ethylene dibromide; EDB |
106-93-4 |
|
|
Di-n-butyl phthalate |
84-74-2 |
|
o-Dichlorobenzene; 1,2-Dichlorobenzene |
o-Dichlorobenzene; 1,2-Dichlorobenzene |
95-50-1 |
|
|
m-Dichlorobenzene; 1,3-Dichlorobenzene |
541-73-1 |
|
p-Dichlorobenzene; 1,4-Dichlorobenzene |
p-Dichlorobenzene; 1,4-Dichlorobenzene |
106-46-7 |
|
|
3,3'-Dichlorobenzidine |
91-94-2 |
|
trans-1,4-Dichloro-2-butene |
trans-1,4-Dichloro-2-butene |
110-57-6 |
|
|
Dichlorodifluoromethane; CFC 12; |
75-71-8 |
|
1.1-Dichloroethane; Ethylidene chloride |
1,1-Dichloroethane; Ethylidene chloride |
75-34-3 |
|
1,2-Dichloroethane; Ethylene dichloride |
1,2-Dichloroethane; Ethylene dichloride |
107-06-2 |
|
1,1-Dichloroethylene; 1,1-Dichloroethene; Vinylidene chloride |
1,1-Dichloroethylene; 1,1-Dichloroethene; Vinylidene chloride |
75-35-4 |
|
cis-1,2-Dichloroethylene; cis-1,2-Dichloroethene |
cis-1,2-Dichloroethylene; cis-1,2-Dichloroethene |
156-59-2 |
|
trans-1,2-Dichloroethylene |
trans-1,2-Dichloroethylene; trans-1,2-Dichroroethene |
156-60-5 |
|
|
2,4-Dichlorophenol |
120-83-2 |
|
|
2,6-Dichlorophenol |
87-65-0 |
|
1,2-Dichloropropane; Propylene dichloride |
1,2-Dichloropropane; Propylene dichloride |
78-87-5 |
|
|
1,3-Dichloropropane; Trimethylene dichloride |
142-28-9 |
|
|
2, 2-Dichloropropane; isopropylidene chloride |
594-20-7 |
|
|
1,1-Dichloropropene |
563-58-6 |
|
cis-1,3-Dichloropropene |
cis-1,3-Dichloropropene |
10061-01-5 |
|
trans-1,3-Dichloropropene |
trans-1,3-Dichloropropene |
10061-02-6 |
|
|
Dieldrin |
60-57-1 |
|
|
Diethyl phthalate |
84-66-2 |
|
|
O,O-Diethyl O-2-pyrazinyl phosphorothioate; Thionazin |
297-97-2 |
|
|
Dimethoate |
60-51-5 |
|
|
p-(Dimethylamino)azobenzene |
60-11-7 |
|
|
7,12-Dimethylbenz[a]anthracene |
57-97-6 |
|
|
3,3'-Dimethylbenzidine |
119-93-7 |
|
|
2,4-Dimethylphenol; m-Xylenol |
105-67-9 |
|
|
Dimethyl phthalate |
131-11-3 |
|
|
m-Dinitrobenzene |
99-65-0 |
|
|
4,6-Dinitro-o-cresol; 4,6-Dinitro-2-methylphenol |
534-52-1 |
|
|
2,4-Dinitrophenol |
51-28-5 |
|
|
2,4-Dinitrotoluene |
121-14-2 |
|
|
2,6-Dinitrotoluene |
606-20-2 |
|
|
Dinoseb; DNBP; 2-sec-Butyl-4,6-dinitrophenol |
88-85-7 |
|
|
Di-n-octyl phthalate |
117-84-0 |
|
|
Diphenylamine |
122-39-4 |
|
|
Disulfoton |
298-04-4 |
|
|
Endosulfan I |
959-96-8 |
|
|
Endosulfan II |
33213-65-9 |
|
|
Endosulfan sulfate |
1031-07-8 |
|
|
Endrin |
72-20-8 |
|
|
Endrin aldehyde |
7421-93-4 |
|
Ethylbenzene |
Ethylbenzene |
100-41-4 |
|
|
Ethyl methacrylate |
97-63-2 |
|
|
Ethylmethanesulfonate |
62-50-0 |
|
|
Famphur |
52-85-7 |
|
|
Fluoranthene |
206-44-0 |
|
|
Fluorene |
86-73-7 |
|
|
Heptachlor |
76-44-8 |
|
|
Heptachlor epoxide |
1024-57-3 |
|
|
Hexachlorobenzene |
118-74-1 |
|
|
Hexachlorobutadiene |
87-68-3 |
|
|
Hexachlorocyclopentadiene |
77-47-4 |
|
|
Hexachloroethane |
67-72-1 |
|
|
Hexachloropropene |
1888-71-7 |
|
2-Hexanone; Methyl butyl ketone |
2-Hexanone; Methyl butyl ketone |
591-78-6 |
|
|
Indeno[1,2,3-cd]pyrene |
193-39-5 |
|
|
Isobutyl alcohol |
78-83-1 |
|
|
Isodrin |
465-73-6 |
|
|
Isophorone |
78-59-1 |
|
|
Isosafrole |
120-58-1 |
|
|
Kepone |
143-50-0 |
|
Lead |
Lead |
(Total) |
|
|
Mercury |
(Total) |
|
|
Methacrylonitrile |
126-98-7 |
|
|
Methapyrilene |
91-80-5 |
|
|
Methoxychlor |
72-43-5 |
|
Methyl bromide; Bromomethane |
Methyl bromide; Bromomethane |
74-83-9 |
|
Methyl chloride; Chloromethane |
Methyl chloride; Chloromethane |
74-87-3 |
|
|
3-Methylcholanthrene |
56-49-5 |
|
Methyl ethyl ketone; MEK; 2-Butanone |
Methyl ethyl ketone; MEK; 2-Butanone |
78-93-3 |
|
Methyl iodide; Iodomethane |
Methyl iodide; Iodomethane |
74-88-4 |
|
|
Methyl methacrylate |
80-62-6 |
|
|
Methyl methanesulfonate |
66-27-3 |
|
|
2-Methylnaphthalene |
91-57-6 |
|
|
Methyl parathion; Parathion methyl methyl |
298-00-0 |
|
4-Methyl-2-pentanone; Methyl isobutyl ketone |
4-Methyl-2-pentanone; Methyl isobutyl ketone |
108-10-1 |
|
Methylene bromide; Dibromomethane |
Methylene bromide; Dibromomethane |
74-95-3 |
|
Methylene chloride; Dichloromethane |
Methylene chloride; Dichloromethane |
75-09-2 |
|
|
Naphthalene |
91-20-3 |
|
|
1,4-Naphthoquinone |
130-15-4 |
|
|
1- Naphthylamine |
134-32-7 |
|
|
2-Napthylamine |
91-59-8 |
|
Nickel |
Nickel |
(Total) |
|
|
o-Nitroaniline; 2-Nitroaniline |
88-74-4 |
|
|
m-Nitroaniline; 3-Nitroaniline |
99-09-2 |
|
|
p-Nitroaniline; 4-Nitroaniline |
100-01-6 |
|
|
Nitrobenzene |
98-95-3 |
|
|
o-Nitrophenol; 2-Nitrophenol |
88-75-5 |
|
|
p-Nitrophenol; 4-Nitrophenol |
100-02-7 |
|
|
N-Nitrosodi-n-butylamine |
924-16-3 |
|
|
N-Nitrosodiethylamine |
55-18-5 |
|
|
N-Nitrosodimethylamine |
62-75-9 |
|
|
N-Nitrosodiphenylamine |
86-30-6 |
|
|
N-Nitrosodipropylamine; N-Nitroso-N-dipropylamine; Di-n-propylnitrosamine |
621-64-7 |
|
|
N-Nitrosomethylethalamine |
10595-95-6 |
|
|
N-Nitrosopiperidine |
100-75-4 |
|
|
N-Nitrosopyrrolidine |
930-55-2 |
|
|
5-Nitro-o-toluidine |
99-55-8 |
|
|
Parathion |
56-38-2 |
|
|
Pentachlorobenzene |
608-93-5 |
|
|
Pentachloronitrobenzene |
82-68-8 |
|
|
Pentachlorophenol |
87-86-5 |
|
|
Phenacetin |
62-44-2 |
|
|
Phenanthrene |
85-01-8 |
|
|
Phenol |
108-95-2 |
|
|
p-Phenylenediamine |
106-50-3 |
|
|
Phorate |
298-02-2 |
|
|
Polychlorinated biphenyls; PCBS; Aroclors |
Note 6 |
|
|
Pronamide |
23950-58-5 |
|
|
Propionitrile; Ethyl cyanide |
107-12-0 |
|
|
Pyrene |
129-00-0 |
|
|
Safrole |
94-59-7 |
|
Selenium |
Selenium |
(Total) |
|
Silver |
Silver |
(Total) |
|
|
Silvex; 2,4,5-TP |
93-72-1 |
|
Styrene |
Styrene |
100-42-5 |
|
|
Sulfide |
18496-25-8 |
|
|
2,4,5-T; 2,4,5-Trichlorophenoxyacetic acid |
93-76-5 |
|
|
1,2,4,5-Tetrachlorobenzene |
95-94-3 |
|
1,1,1,2-Tetrachloroethane |
1,1,1,2-Tetrachloroethane |
630-20-6 |
|
1,1,2,2-Tetrachloroethane |
1,1,2,2-Tetrachloroethane |
79-34-5 |
|
Tetrachloroethylene; Tetrachloroethene; Perchloroethylene |
Tetrachloroethylene; Tetrachloroethene; Perchloroethylene |
127-18-4 |
|
|
2,3,4,6-Tetrachlorophenol |
58-90-2 |
|
Thallium |
Thallium |
(Total) |
|
|
Tin |
(Total) |
|
Toluene |
Toluene |
108-88-3 |
|
|
o-Toluidine |
95-53-4 |
|
|
Toxaphene |
Note 7 |
|
|
1,2,4-Trichlorobenzene |
120-82-1 |
|
1,1,1-Trichloroethane; Methychloroform |
1,1,1-Trichloroethane; Methychloroform |
71-55-6 |
|
1,1,2-Trichloroethane |
1,1,2-Trichloroethane |
79-00-5 |
|
Trichloroethylene; Trichloroethene ethene |
Trichloroethylene; Trichloroethene ethane |
79-01-6 |
|
Trichlorofluoromethane; CFC-11 |
Trichlorofluoromethane; CFC-11 |
75-69-4 |
|
|
2,4,5-Trichlorophenol |
95-95-4 |
|
|
2,4,6-Trichlorophenol |
88-06-2 |
|
1,2,3-Trichloropropane |
1,2,3-Trichloropropane |
96-18-4 |
|
|
O,O,O-Triethyl phosphorothioate |
126-68-1 |
|
|
sym-Trinitrobenzene |
99-35-4 |
|
Vanadium |
Vanadium |
(Total) |
|
Vinyl acetate |
Vinyl acetate |
108-05-4 |
|
Vinyl chloride; Chloroethene |
Vinyl chloride; Chloroethene |
75-01-4 |
|
Xylene(total) |
Xylene(total) |
Note 8 |
|
Zinc |
Zinc |
(Total) |
NOTES:
1Common names are those widely used in government regulations, scientific publications, and commerce; synonyms exist for many chemicals.
2The corresponding Chemical Abstracts Service Index name as used in the 9th Collective Index, may be found in Appendix II of 40 CFR 258.
3Chemical Abstracts Service Registry Number. Where "Total" is entered, all species in the groundwater that contains this element are included.
4This substance is often called Bis(2-chloroisopropyl) ether, the name Chemical Abstracts Service applies to its noncommercial isomer, Propane, 2.2'-oxybis2-chloro (CAS RN 39638-32-9).
5Chlordane: This entry includes alpha-chlordane (CAS RN 5103-71-9), beta-chlordane (CAS RN 5103-74-2), gamma-chlordane (CAS RN 5566-34-7), and constituents of chlordane (CAS RN 57-74-9 and CAS RN 12739-03-6).
6Polychlorinated biphenyls (CAS RN 1336-36-3); this category contains congener chemicals, including constituents of Aroclor 1016 (CAS RN 12674-11-2), Aroclor 1221 (CAS RN 11104-28-2), Aroclor 1232 (CAS RN 11141-16-5), Aroclor 1242 (CAS RN 53469-21-9), Aroclor 1248 (CAS RN 12672-29-6), Aroclor 1254 (CAS RN 11097-69-1), and Arclor 1260 (CAS RN 11096-82-5).
7Toxaphene: This entry includes congener chemicals contained in technical toxaphene (CAS RN 8001-35-2), i.e., chlorinated camphene.
8Xylene (total): This entry includes o-xylene (CAS RN 96-47-6), m-xylene (CAS RN 108-38-3), p-xylene (CAS RN 106-42-3), and unspecified xylenes (dimethylbenzenes) (CAS RN 1330-20-7).
A. Corrective action is required whenever one or more groundwater protection standard is exceeded at statistically significant levels. An owner or operator of a landfill may elect to initiate corrective action at any time; however, prior to such initiation, the appropriate groundwater protection standards for all Table 3.1 constituents shall be established consistent with 9VAC20-81-250 A 6. At any time during the corrective action process, the owner or operator may elect to pursue, or the director can determine that, interim measures as defined under subsection F of this section are required in accordance with subdivision E 3 of this section.
B. The director may require periodic progress reports when a corrective action program is required but not yet implemented.
C. Characterization and assessment requirements.
1. Upon notifying the department that one or more of the constituents listed in Table 3.1 Column B has been detected at a statistically significant level exceeding the groundwater protection standards, the owner or operator shall, unless department approval of an Alternate Source Demonstration has been received as noted under 9VAC20-81-250 B 3 f (3) (a) (ii) or 9VAC20-81-250 C 3 e (3) (a) (ii):
a. Characterization. Within 90 days, install additional monitoring wells as necessary sufficient to define the vertical and horizontal extent of the release of constituents at statistically significant levels exceeding the groundwater protection standards including the installation of at least one additional monitoring well at the facility boundary in the direction of contaminant migration.
b. Notification. Notify all persons who own the land or reside on the land that directly overlies any part of the release if contaminants have migrated offsite as indicated by the results of sampling of the characterization wells installed under subdivision 1 a of this subsection within 15 days of completion of the characterization sampling and analysis efforts.
c. Assessment. Within 90 days, initiate an assessment of corrective measures or a proposal for presumptive remedy.
d. Financial assurance. Within 120 days, provide additional financial assurance in the amount of $1 million to the department as required by 9VAC20-70-113 using the mechanisms required in 9VAC20-70-140 of the Financial Assurance Requirements Regulations for Solid Waste Disposal, Transfer, and Treatment Facilities.
e. Public meeting. Prior to submitting the document required under subdivision 1 f of this subsection, schedule and hold a public meeting to discuss the draft results of the corrective measures assessment or the proposal for presumptive remedy, prior to the final selection of remedy. The meeting shall be held to the extent practicable in the vicinity of the landfill. The process to be followed for scheduling and holding the public hearing is described under subdivision 4 of this subsection.
f. Submission requirements. Within 180 days, submit the completed assessment of corrective measures defined under subdivision 3 of this subsection, or the proposal for presumptive remedies defined under subdivision 2 of this subsection, including any responses to public comments received.
g. Director allowance. The submission timeframe noted in subdivision 1 f of this subsection may be extended by the director for good cause upon request of the owner or operator.
2. Presumptive remedy allowance.
a. Applicability. To expedite corrective action, in lieu of an analysis meeting the requirements of subdivision 3 of this subsection, the owner or operator of any facility monitoring groundwater in accordance with 9VAC20-81-250 C may propose a presumptive remedy for the landfill.
b. Options. The presumptive remedy for solid waste landfills shall be limited to one or more of the following:
(1) Containment of the landfill mass, including an impermeable cap;
(2) Control of the landfill leachate;
(3) Control of the migration of contaminated groundwater;
(4) Collection and treatment of landfill gas; and
(5) Reduction of saturation of the landfill mass.
Containment may be selected as a sole or partial remedy until a determination is made under subdivision F 1 of this section that another remedy shall be employed to meet the requirements of subdivision G 1 of this section concerning remediation completion. Upon recognition that presumptive remedies may not be able to achieve the groundwater protection standards, an assessment of corrective measures shall be initiated within 90 days.
c. Restrictions. Presumptive remedies are not applicable to:
(1) Landfills monitoring groundwater under the Federal Subtitle D equivalent program defined under 9VAC20-81-250 B when the use of the presumptive remedy will be the sole remedy applied to the groundwater release; or
(2) Landfills that may monitor groundwater under 9VAC20-81-250 C but that exhibit contamination beyond facility boundaries unless the proposed presumptive remedy option under subdivision 2 b of this subsection can be demonstrated to show it will address the reduction of contamination already present beyond the facility boundary, and the demonstration is approved by the department.
d. Submission requirements. Owner or operators who wish to propose use of the presumptive remedy allowance shall submit with the proposal, signed by a qualified groundwater professional, an:
(1) Assessment of risks resulting from the contamination at the disposal unit boundary and at the facility boundary;
(2) Evaluation of the current trends in groundwater quality data with respect to the established groundwater protection standards; and
(3) Anticipated schedule for initiating and completing presumptive remedy-based remedial activities.
e. Implementation. Upon conducting a public meeting as required under subdivision 4 of this subsection, submitting a corrective action monitoring plan meeting subdivision D 1 of this section, and modifying the landfill permit in accordance with 9VAC20-81-600 F 2, the owner or operator may proceed with the implementation of the remedy in accordance with subdivision E 1 of this section.
f. Evaluation and response. The owner or operator shall provide an evaluation of the performance of the implemented presumptive remedy every three years, unless an alternate schedule is approved by the director, in a Corrective Action Site Evaluation report containing, at a minimum, the following information:
(a) A description of how the presumptive remedy is performing with respect to the conditions in subdivision H 1 of this section;
(b) Current and historical groundwater data and analysis;
(c) An evaluation of the changes seen in groundwater contamination after the implementation of the remedy and a projection of when the conditions in subdivision H 1 of this section will be achieved; and
(d) The progress toward achieving the schedule required in subdivision C 2 d (3) of this section.
3. Assessment of corrective measures.
a. Purpose. The assessment shall include an analysis of the effectiveness of several potential corrective measures in meeting all of the requirements and objectives of the remedy as described under this subsection, addressing at least the following:
(1) The performance, reliability, implementation ease, and potential impacts of appropriate potential remedies, including safety impacts, cross-media impacts, and control of exposure to any residual contamination;
(2) The time required to begin and complete the remedy;
(3) The costs of remedy implementation; and
(4) The institutional requirements such as state or local permit requirements or other environmental or public health requirements that may substantially affect implementation of the remedies.
b. Requirements. As part of the assessment of corrective measures submitted to the department for review, the owner or operator must demonstrate that one or more possible groundwater remedy has been evaluated for potential application on site. These remedies may include a specific technology or combination of technologies that achieve or may achieve the standards for remedies specified in subdivision 3 c (1) of this subsection given appropriate consideration of the factors specified in subdivision D 1 a of this section.
c. Selection of remedy. As part of submission of the assessment of corrective measures document, the owner or operator shall select a remedy that, at a minimum, meets the standards listed in subdivision H 1 of this section.
(1) The selected remedies to be included in the corrective action plan shall:
(a) Be protective of human health and the environment;
(b) Attain the groundwater protection standard as specified pursuant to 9VAC20-81-250 A 6;
(c) Control the sources of releases so as to reduce or eliminate, to the maximum extent practicable, further releases of solid waste constituents into the environment that may pose a threat to human health or the environment; and
(d) Comply with standards for management of wastes.
d. Evaluation and response. The department shall review the assessment of corrective measures to evaluate the proposed remedy and may require revisions to the assessment. If the assessment is approved without revision, the department will notify the owner or operator to prepare a written corrective action plan based on the proposed remedy and such plan will be submitted within 180 days of the department's notification of approval of the assessment of corrective measures.
4. Public meeting process. As part of the public meeting process completed prior to the submission of a proposal for presumptive remedy or assessment of corrective measures:
a. Newspaper notice. The owner or operator must publish a notice once a week for two consecutive weeks in a major local newspaper of general circulation inviting public comment on the results of the corrective measures assessment or proposal for presumptive remedy as applicable. The notice shall include:
(1) The name of the landfill, its location, and the date, time, and place for the public meeting, and the beginning and ending dates for the 30-day comment period. The public meeting shall be held at a time convenient to the public. The comment period will begin on the date the owner or operator publishes the notice in the local newspaper;
(2) The name, telephone, and address of the owner's or operator's representative who can be contacted by the interested persons to answer questions or where comments shall be sent;
(3) Location where copies of the documentation to be submitted to the department in support of the corrective measures assessment or proposal of presumptive remedy can be viewed and copied prior to the meeting;
(4) A statement indicating that the need to perform the corrective measures assessment or presumptive remedy is a result of a statistically significant increase in one or more groundwater protection standards; and
(5) A statement that the purpose of the public meeting is to acquaint the public with the technical aspects of the proposal, describe how the requirements of these regulations will be met, identify issues of concern, facilitate communication, and establish a dialogue between the permittee and persons who may be affected by the landfill.
b. Document review. The owner or operator shall place a copy of the report and supporting documentation in a location accessible to the public during the public comment period in the vicinity of the proposed landfill.
c. Meeting timeframe. The owner or operator shall hold a public meeting within a timeframe that allows for the submission of a completed assessment of corrective measures or presumptive remedy within 180 days of notifying the department of a groundwater protection standard exceedance or as granted under subdivision 1 g of this subsection. The meeting must be scheduled and held:
(1) No earlier than 15 days after the publication of the notice; and
(2) No later than seven days before the close of the 30-day comment period.
D. Corrective action plan and monitoring plan.
1. The owner or operator shall submit to the department a Corrective Action Plan (CAP) and related Corrective Action Monitoring Plan (CAMP) consistent with the findings as presented in the assessment of corrective measures required under subdivision C 3 of this section, or proposal for presumptive remedy described under subdivision C 2 of this section.
a. Requirements. In preparing a proposed corrective action plan, the owner or operator will consider the following evaluation factors:
(1) The long-term and short-term effectiveness and protectiveness of the potential remedies, along with the degree of certainty that the remedy will prove successful based on consideration of the following:
(a) Magnitude of reduction of existing risks;
(b) Magnitude of residual risks in terms of likelihood of further releases due to waste remaining following implementation of a remedy;
(c) The type and degree of long-term management required, including monitoring, operation, and maintenance;
(d) Short-term risks that might be posed to the community, workers, or the environment during implementation of such a remedy, including potential threats to human health and the environment associated with excavation, transportation, and redisposal or containment;
(e) Time until full protection is achieved;
(f) Potential for exposure of humans and environmental receptors to remaining wastes, considering the potential threat to human health and the environment associated with excavation, transportation, re-disposal, or containment;
(g) Long-term reliability of the engineering and institutional controls; and
(h) Potential need for replacement of the remedy.
(2) The effectiveness of the remedy in controlling the source to reduce further releases based on consideration of the following factors:
(a) The extent to which containment practices will reduce further releases;
(b) The extent to which treatment technologies may be used;
(c) Magnitude of reduction of existing risks; and
(d) Time until full protection is achieved.
(3) The ease or difficulty of implementing a potential remedy based on consideration of the following types of factors:
(a) Degree of difficulty associated with constructing the technology;
(b) Expected operational reliability of the technologies;
(c) Need to coordinate with and obtain necessary approvals and permits from other agencies;
(d) Availability of necessary equipment and specialists; and
(e) Available capacity and location of needed treatment, storage, and disposal services.
(4) Practicable capability of the owner or operator, including a consideration of the technical and economic capability. At a minimum the owner or operator must consider capital costs, operation and maintenance costs, net present value of capital and operation and maintenance costs, and potential future remediation costs.
(5) Ensure that all solid wastes that are managed while undergoing corrective action or an interim measure shall be managed in a manner:
(a) That is protective of human health and the environment; and
(b) That complies with all applicable federal and Virginia requirements.
(6) The degree to which community concerns raised as the result of the public meeting required by subdivision C 4 of this section are addressed by the potential remedy.
b. Implementation and completion timeframes. The owner or operator shall specify as part of the selected remedy a schedule for initiating and completing remedial activities. Such a schedule shall require the initiation of remedial activities within a reasonable period of time taking into consideration the factors set forth in this section. The owner or operator shall consider the following factors in determining the schedule of remedial activities:
(1) Nature and extent of contamination;
(2) Practical capabilities of remedial technologies in achieving compliance with groundwater protection standards established under 9VAC20-81-250 A 6 and other objectives of the remedy;
(3) Availability of treatment or disposal capacity for wastes managed during implementation of the remedy;
(4) Desirability of utilizing technologies that are not currently available, but which may offer significant advantages over already available technologies in terms of effectiveness, reliability, safety, or ability to achieve remedial objectives;
(5) Potential risks to human health and the environment from exposure to contamination prior to completion of the remedy;
(6) Resource value of the aquifer including:
(a) Current and future uses;
(b) Proximity and withdrawal rates of users;
(c) Groundwater quantity and quality;
(d) The potential damage to wildlife, crops, vegetation, and physical structures caused by exposure to the waste constituents;
(e) The hydrological characteristics of the landfill and surrounding land;
(f) Groundwater removal and treatment costs; and
(g) The cost and availability of alternate water supplies;
(7) Practical capability of the owner or operator;
(8) Timeframes for periodic progress reports during design, construction, operation, and maintenance. Items to consider when preparing the reports include but are not limited to:
(a) Progress of remedy implementation;
(b) Results of monitoring and sampling activities;
(c) Progress in meeting cleanup standards;
(d) Descriptions of remediation activities;
(e) Problems encountered during the reporting period and actions taken to resolve problems;
(f) Work for next reporting period;
(g) Copies of laboratory reports including drilling logs, QA/QC documentation, and field data; and
(9) Other relevant factors.
c. Corrective action monitoring program. Any groundwater monitoring program to be employed during the corrective action process:
(1) Shall at a minimum, meet the requirements of the applicable groundwater monitoring program described under 9VAC20-81-250 B 3 or C 3;
(2) Shall determine the horizontal and vertical extent of the plume of contamination for constituents at statistically significant levels exceeding background concentrations;
(3) Can be used to demonstrate the effectiveness of the implemented corrective action remedy; and
(4) Shall demonstrate compliance with the groundwater protection standard established under 9VAC20-81-250 A 6.
2. The proposed corrective action plan shall be submitted to the director for approval. Prior to rendering his approval, the director may:
a. Request an evaluation of one or more alternative remedies;
b Request technical modification of the monitoring program;
c. Request a change in the time schedule; or
d. Determine that the remediation of the release of Table 3.1 constituents is not necessary if the owner or operator demonstrates to the satisfaction of the director that:
(1) The groundwater is additionally contaminated by substances that have originated from a source other than the landfill in a demonstration meeting the requirements of 9VAC20-81-250 A 5 and those substances are present in concentrations such that cleanup of the release from the landfill would provide no significant reduction in risk to actual or potential receptors;
(2) The constituent is present in groundwater that is not currently or reasonably expected to be a source of drinking water and not hydraulically connected with waters to which the constituents are migrating or are likely to migrate in a concentration that would exceed the groundwater protection standards established;
(3) Remediation of the release is technically impracticable; or
(4) Remediation results in unacceptable cross-media impacts.
3. A determination by the director pursuant to subdivision 2 d of this subsection shall not affect the authority of the state to require the owner or operator to undertake source control measures or other measures that may be necessary to eliminate or minimize further releases to the groundwater, to prevent exposure to the groundwater, or to remediate the groundwater to concentrations that are technically practicable and significantly reduce threats to human health or the environment.
4. After an evaluation of the proposed or revised plan, the director will:
a. Approve the proposed corrective action plan as written;
b. Approve the proposed corrective action plan as modified by the owner or operator;
c. Proceed with the permit modification process in accordance with 9VAC20-81-600 F 2; or
d. Disapprove the proposed corrective action plan and undertake appropriate containment or clean up actions in accordance with § 10.1-1402 (18) of the Virginia Waste Management Act.
E. Remedy implementation. Upon completion of the permit modification action described under subdivision D 4 c of this section, the owner or operator shall:
1. Monitoring program. Implement a corrective action groundwater monitoring program meeting the requirements of subdivision D 1 c of this section;
2. Remedy. Implement the remedy described in the Corrective Action Plan and the Permit as amended under subdivision D 4 c of this section; and
3. Interim measures. Take any interim measures necessary to ensure the protection of human health and the environment as described in subsection F of this section.
F. Interim measures.
1. To the greatest extent practicable, interim measures shall be consistent with the objectives of and contribute to the performance of any remedy that may be required pursuant to meeting the groundwater protection standard.
2. Should the director require interim measures pursuant to this section, the director will notify the owner or operator of the necessary actions required. Such actions will be implemented as soon as practicable in accordance with a schedule as specified by the director.
3. The following factors shall be considered in determining whether interim measures are necessary:
a. Timeframes. Time required to develop or implement a final remedy;
b. Exposure. Actual or potential exposure of nearby populations or environmental receptors to hazardous constituents;
c. Drinking water. Actual or potential contamination of drinking water supplies;
d. Resource degradation. Further degradation of the groundwater that may occur if remedial action is not initiated expeditiously;
e. Migration potential. Weather conditions that may cause the constituents to migrate or be released;
f. Accident. Risks of fire or explosion, or potential for exposure to constituents as a result of an accident or failure of a container or handling system; and
g. Other. Situations including the presence of wastes or other contaminants that may pose threats to human health, sensitive ecosystems, and the environment.
G. Remedy performance.
1. The owner or operator shall provide an evaluation of the performance of the remedy consistent with the timeframes established in the permit and present the findings in a Corrective Action Site Evaluation report. The evaluation shall describe the progress toward achieving the groundwater protection standards since implementation of the remedy.
2. An owner or operator or the director may determine, based on information developed after implementation of the remedy or other information contained in the evaluation, that compliance with requirements of subdivision H 1 of this section are not being achieved through the remedy selected. In such cases, the owner or operator shall implement other methods or techniques that could practicably achieve compliance with the requirements, unless the owner or operator makes the determination under subdivision G 3 of this section.
3. If the owner or operator determines that groundwater protection standards cannot be practically achieved with any currently available methods, the owner or operator shall, within 90 days of recognizing that condition:
a. Submit a report, certified by a qualified groundwater scientist, for director approval, that demonstrates that compliance with groundwater protection standards established under 9VAC20-81-250 A 6 cannot be practically achieved with any currently available groundwater remedial methods;
b. Upon receiving director approval under subdivision 3 a of this subsection, implement alternate measures to control exposure of humans or the environment to residual contamination that will remain as a result of termination of remedial actions, as necessary to protect human health and the environment;
c. Implement alternate measures for removal or decontamination of any remediation-related equipment, units, devices, or structures that are:
(1) Technically practicable; and
(2) Consistent with the overall objective of the remedy; and
d. At least 14 days prior to implementing the alternate measures, submit a request for approval to the director describing and justifying the alternate measures to be applied.
H. Remedy completion.
1. The groundwater remedy implemented under corrective action shall be considered complete when:
a. The owner or operator complies with the groundwater protection standards at all points within the plume of contamination that lie at or beyond the disposal unit boundary by demonstrating that no Table 3.1 Column B constituents have exceeded groundwater protection standards for a period of three consecutive years using the appropriate statistical procedures and performance standards as described under 9VAC20-81-250 D; and
b. All other actions required as part of the remedy have been satisfied or completed, and the owner or operator obtains the certification required under subdivision H 2 of this section.
2. Upon completion of the remedy, the owner or operator shall notify the director within 14 days by submitting a certification that the remedy has been completed in compliance with the requirements of the Corrective Action Plan and the permit as modified under subdivision D 4 c of this section.
3. The certification shall be signed by the owner or operator and by a qualified groundwater scientist, and shall include all data relevant to the demonstration of a successful remedy completion.
4. If the director, based on the review of information presented under subdivision H 3 of this section, determines that:
a. The corrective action remedy has been completed in accordance with the requirements of the Corrective Action Plan, the permit as amended, and subdivision H 1 of this section, the director will release the owner or operator from the requirements for financial assurance for corrective action under 9VAC20-70; or
b. The remedy has not yet achieved completion, the owner or operator shall remain in corrective action and meet the financial assurance requirements until such time as a successful demonstration and certification can be made.
The closure of all compost facilities, solid waste transfer stations, centralized waste treatment facilities, materials recovery facilities, waste to energy and incineration facilities, and waste piles shall be governed by the standards as set forth in this section:
1. The owner or operator shall close his facility in a manner that minimizes the need for further maintenance, and controls, minimizes, or eliminates, to the extent necessary to protect human health and the environment, the postclosure escape of uncontrolled leachate, surface runoff, or waste decomposition products to the groundwater, surface water, or to the atmosphere.
a. At closure, the owner or operator shall remove or decontaminate all waste residues, contaminated containment system components (liners, etc.), contaminated subsoils, and structures and equipment contaminated with waste and leachate. For miscellaneous units, all waste, materials contaminated with waste constituents, and treatment residue shall be removed and disposed in a permitted facility.
b. If, after removing or decontaminating all residues and making all reasonable efforts to effect removal or decontamination of contaminated components, subsoils, structures, and equipment as required in subdivision 1 a of this section, the owner or operator finds that not all contaminated subsoils can be practicably removed or decontaminated, he shall close the facility and perform postclosure care in accordance with the closure and postclosure care requirements of Part III (9VAC20-81-160 and 9VAC20-81-170, respectively). In addition, for compost facilities, other corrective measures approved by the department may be used to remediate the site.
2. Closure plan and modification of plan.
a. The owner or operator of any facility shall have a written closure plan. This plan shall identify the steps necessary to completely close the facility/unit at its full operation under the permit conditions. The closure plan shall include, at least a schedule for final closure including, as a minimum, the anticipated date when wastes will no longer be received, the date when completion of final closure is anticipated, and intervening milestone dates that will allow tracking of the progress of closure. The closure plan shall also include closure cost estimates in accordance with 9VAC20-70-111 for the purpose of financial assurance.
b. The owner or operator may amend his closure plan at any time during the active life of the facility. The owner or operator shall so amend his plan any time changes in operating plans or operations, facility design, corrective action, or other site conditions affects affect the closure plan. The amended closure plan shall be placed in the operating record.
c. The owner or operator shall submit to the department the amended closure plan that was placed in the operating record.
d. At least 180 days prior to beginning closure of each unit, the owner or operator shall notify the department of the intent to close.
e. The owner or operator shall provide to the department a certification from a professional engineer that the facility has been closed in accordance with the closure plan.
3. Time allowed for closure.
a. The owner or operator shall complete closure activities in accordance with the closure plan and within six months after receiving the final volume of wastes. The director may approve a longer closure period if the owner or operator can demonstrate that the required or planned closure activities will, of necessity, take longer than six months to complete; and that he has taken all steps to eliminate any significant threat to human health and the environment from the unclosed but inactive facility.
b. The owner or operator shall post one sign notifying all persons of the closing, and providing a notice prohibiting further receipt of waste materials. The sign will remain in place until closure activities are complete. Further, suitable barriers shall be installed at former accesses to prevent new waste from being delivered.
4. Inspection. The department shall inspect all facilities at the time of closure to confirm that the closing is complete and adequate. It shall notify the owner of a closed facility, in writing, if the closure is satisfactory, and shall require any necessary construction or such other steps as may be necessary to bring unsatisfactory sites into compliance with this chapter.
A. Closure. At closure, the owner or operator shall:
1. Remove all waste residue, contaminated containment system components (liners, etc.), contaminated subsoils, and decontaminate structures and equipment contaminated with waste, and manage them as solid waste (or hazardous waste, if applicable) unless exempt under Part III (9VAC20-81-100 et seq.) of this chapter; or
2. Close the impoundment and provide postclosure care for a landfill under Part III (9VAC20-81-100 et seq.) of this chapter, including the following:
a. Eliminate free liquids by removing liquid waste and waste residue;
b. Install a groundwater monitoring system and initiate groundwater monitoring in accordance with the requirements of 9VAC20-81-250;
c. Stabilize remaining waste residues to a bearing capacity necessary to support the final cover; and
d. Cover the surface impoundment with a final cover designed and constructed in accordance with the requirements of 9VAC20-81-160 D 2.
3. Close inactive, new, and existing CCR surface impoundments in accordance with the requirements of Part VIII (9VAC20-81-800 et seq.) of this chapter or this subsection, whichever is more stringent.
B. Inspection. The department shall inspect all solid waste management facilities at the time of closure to confirm that the closing is complete and adequate. It shall notify the owner of a closed facility, in writing, if the closure is satisfactory and shall require any necessary construction or such other steps as may be necessary to bring unsatisfactory sites into compliance with this chapter.
C. The owner or operator shall demonstrate financial assurance for closure, postclosure care and corrective action in accordance with the Financial Assurance Regulations for Solid Waste Disposal, Transfer and Treatment Facilities (9VAC20-70), as applicable.
A. The requirements in this section apply to owners and operators of facilities that treat or store solid waste in facilities or units not otherwise regulated under Part III (9VAC20-81-100 et seq.) of this chapter or 9VAC20-81-310 through 9VAC20-81-385.
B. A miscellaneous unit shall be located, designed, constructed, operated, maintained, and closed in a manner that will ensure protection of human health and the environment. Permits for miscellaneous units are to contain such terms and provisions as necessary to protect human health and the environment, including, but not limited to, siting, design and operating requirements, detection and monitoring requirements, and requirements for responses to releases of solid waste or constituents of solid wastes from the unit. Permit terms and provisions shall include those requirements of Part III (9VAC20-81-100 et seq.), 9VAC20-81-310 through 9VAC20-81-385, and Part V (9VAC20-81-400 et seq.), that are appropriate for the miscellaneous unit being permitted.
C. Protection of human health and the environment includes, but is not limited to:
1. Proper location of the facility and the unit considering:
a. The hydrologic and geologic characteristics of the unit and the surrounding area, including the topography of the land around the facility and the unit;
b. The atmospheric and meteorological characteristics of the unit and the surrounding area;
c. The patterns of precipitation in the region;
d. The patterns of land use in the surrounding area;
e. The potential for health risks caused by human exposure to waste constituents; and
f. The potential for damage to domestic animals, wildlife, crops, vegetation, and physical structures caused by exposure to waste constituents.
2. Prevention of any releases that may have adverse effects on human health or the environment due to migration of waste constituents in the ground water or subsurface environment, considering:
a. The volume and physical and chemical characteristics of the waste in the unit, including its potential for migration through soil, liners, or other containing structures;
b. The existing quality of groundwater, including other sources of contamination and their cumulative impact on the groundwater;
c. The quantity and direction of groundwater flow;
d. The proximity to and withdrawal rates of current and potential groundwater uses; and
e. The potential for deposition or migration of waste constituents into subsurface physical structures, and into the root zone of food-chain crops and other vegetation.
3. Prevention of any releases that may have adverse effects on human health or the environment due to migration of waste constituents in surface water, or wetlands or on the soil surface considering:
a. The volume and physical and chemical characteristics of the waste in the unit;
b. The effectiveness and reliability of containing, confining, and collecting systems and structures in preventing migration;
c. The quantity, quality, and direction of groundwater flow;
d. The proximity of the unit to surface waters;
e. The current and potential uses of nearby surface waters and any water quality standards established for those surface waters; and
f. The existing quality of surface waters and surface soils, including other sources of contamination and their cumulative impact on surface waters and surface soils.
4. Prevention of any release that may have adverse effects on human health or the environment due to migration of waste constituents in the air, considering:
a. The volume and physical and chemical characteristics of the waste in the unit, including its potential for the emission and dispersal of gases, aerosols and particulates;
b. The effectiveness and reliability of systems and structures to reduce or prevent emissions of waste constituents to the air;
c. The operating characteristics of the unit; and
d. The existing quality of the air, including other sources of contamination and their cumulative impact on the air.
D. Monitoring, testing, analytical data, inspections, response, and reporting procedures and frequencies, when called for by the performance standards in subsection C of this section, shall ensure compliance with any applicable requirements of Parts V (9VAC20-81-400 et seq.), VI (9VAC20-81-610), or VIII (9VAC20-81-700) of this chapter, as well as meet any additional requirements needed to protect human health and the environment as specified in the permit.
E. Closure shall be in accordance with 9VAC20-81-160 D.
F. Postclosure care. If a treatment or storage unit has contaminated soils or groundwater that cannot be completely removed or decontaminated during closure, it shall close as a disposal unit in accordance with the requirements of 9VAC20-81-160 and 9VAC20-81-170.
G. The owner or operator shall demonstrate financial assurance for closure, postclosure care and corrective action in accordance with the Financial Assurance Regulations for Solid Waste Disposal, Transfer and Treatment Facilities (9VAC20-70), as applicable.
A. Permits by rule.
1. As an alternate to obtaining a full permit, an owner or operator of any of the following facilities may elect to operate under this section:
a. Compost facility;
b. Solid waste transfer station;
c. Materials recovery facility;
d. Waste to energy, thermal treatment, or incineration facility;
e. Waste pile; or
f. Centralized waste treatment facility.
2. Submission. The owner or operator of a facility described in subdivision 1 of this section shall be deemed to have a solid waste management facility permit notwithstanding any other provisions of Part V (9VAC20-81-400 et seq.) of this chapter, except 9VAC20-81-450 B 2 and 3, if the owner or operator provides to the department the information described in this subdivision, and the department acknowledges completeness of the submittal per subdivision 4 of this subsection:
a. A notice of intent to operate such a facility with documentation required under 9VAC20-81-450 B;
b. A certification that the facility meets the siting standards, as applicable, of 9VAC20-81-320;
c. A certification that the facility meets the statutory requirements for consistency with solid waste management plans as recorded in § 10.1-1408.1 of the Code of Virginia;
d. A certification that the standards, as applicable, of 9VAC20-81-340 are met in an operations manual to be maintained in the operating record in accordance with 9VAC20-81-485;
e. A certificate signed by a professional engineer that:
(1) The facility has been designed and constructed in accordance with the standards, as applicable, of 9VAC20-81-330; and
(2) The standards, as applicable, of 9VAC20-81-360 are met in a closure plan to be maintained in the operating record;
f. Demonstration of legal control over the site for the permit life;
g. A certification from the State Corporation Commission that the business entity pursuing the permit-by-rule status is a valid entity, authorized to transact its business in Virginia. This requirement does not apply to those facilities owned solely by governmental units;
h. Closure cost estimates and proof of financial responsibility as required by the Financial Assurance Regulations for Solid Waste Disposal, Transfer, and Treatment Facilities (9VAC20-70); proof of financial responsibility must be for the entity identified in subdivision 2 g of this subsection;
i. The results of the public participation effort conducted in accordance with the requirements contained in subdivision 3 of this subsection;
j. The following additional information for the specific facilities as noted:
(1) For compost facilities only, a description of the type of facility and the classification of materials that will be composted as classified under 9VAC20-81-310 A 3;
(2) For waste piles only, proof that the facility has a valid VPDES permit, if applicable; and
(3) For waste to energy, thermal treatment, or incineration facilities or materials recovery facilities engaged in reclamation of petroleum-contaminated materials only:
(a) Proof that the facility has a permit issued in accordance with the regulations promulgated by the State Air Pollution Control Board; and
(b) In the case of thermal treatment facilities or materials recovery facilities engaged in reclamation of petroleum-contaminated materials, a description of how the requirements of 9VAC20-81-660 will be met; and
k. The applicable permit fees under the provisions of 9VAC20-90.
3. Public participation.
a. Before the initiation of any construction at the facility under subdivision 1 of this subsection, the owner or operator shall publish a notice once a week for two consecutive weeks in a major local newspaper of general circulation of the intent to construct and operate a facility eligible for a permit-by-rule. The notice shall include:
(1) A brief description of the proposed facility and its location;
(2) A statement that the purpose of the public participation is to acquaint the public with the technical aspects of the facility and how the standards and the requirements of this chapter will be met, to identify issues of concern, to facilitate communication and to establish a dialogue between the permittee and persons who may be affected by the facility;
(3) Announcement of a 30-day comment period, in accordance with subdivision 3 d of this subsection, and the name, telephone number, and address of the owner's or operator's representative who can be contacted by the interested persons to answer questions or where comments shall be sent;
(4) Announcement of the date, time, and place for a public meeting held in accordance with subdivision 3 c of this subsection; and
(5) Location where copies of the documentation to be submitted to the department in support of the permit-by-rule notification can be viewed and copied.
b. The owner or operator shall place a copy of the documentation and support documents in a location accessible to the public in the vicinity of the proposed facility.
c. The owner or operator shall hold a public meeting not earlier than 14 days after the first publication of the notice required in subdivision 3 a of this subsection and no later than seven days before the close of the 30-day comment period. The meeting shall be held to the extent practicable in the vicinity of the proposed facility at a time convenient for the public.
d. The public shall be provided 30 days to comment on the technical and the regulatory aspects of the proposal. The comment period will begin on the date the owner or operator publishes the first notice in the local newspaper.
e. The requirements of this section do not apply to the owners or operators of a material recovery facility, waste to energy facility, incinerator, or a thermal treatment unit that has received a permit from the department based on the regulations promulgated by the State Air Pollution Control Board or State Water Control Board that required facility-specific public participation procedures.
4. Completeness review. Upon receiving the certifications and other required documents, including the results of the public meeting and the applicant's response to the comments received, the department shall conduct a completeness review and respond within 30 calendar days. If the applicant's submission is administratively complete, the applicant shall be deemed to operate under permit-by-rule status. If the applicant's submission is administratively incomplete, the applicant shall be deemed to not have a permit-by-rule. The department may require the operator to submit the full permit application and to obtain a regular solid waste management facility permit if it is determined the requested operation does not qualify for permit-by-rule status.
5. Change of ownership. A permit by rule may not be transferred by the permittee to a new owner or operator. However, when the property transfer takes place without proper closure, the new owner shall notify the department of the sale and fulfill all the requirements contained in subdivision 2 of this subsection. Upon presentation of the financial assurance proof required by 9VAC20-70 by the new owner, the department will release the former owner from his closure and financial responsibilities and acknowledge existence of the new permit by rule in the name of the new owner.
6. Facility modifications. The owner or operator of a facility operating under a permit by rule may modify its design and operation by furnishing the department a new certificate and applicable permit fees under the provisions of 9VAC20-90. For modifications of design, the new certificate shall be prepared by a professional engineer and shall include new documentation required under subdivision 2, as applicable, and subdivision 3 of this subsection. For modifications to the operations, the owner or operator shall submit to the department a new certificate and documentation required under subdivision 2 of this subsection, as applicable. Whenever modifications in the design or operation of the facility affect the provisions of the closure plan, the owner or operator shall revise the closure plan and submit to the department a new certificate and documentation required under subdivision 2 of this subsection, as applicable. Should there be an increase in the closure costs, the owner or operator shall submit a new proof of financial responsibility as required by the Financial Assurance Regulations for Solid Waste Disposal, Transfer, and Treatment Facilities (9VAC20-70).
7. Loss of permit by rule status. In the event that a facility operating under a permit by rule violates any applicable siting, design and construction, or closure provisions of 9VAC20-81-320, 9VAC20-81-330 or 9VAC20-81-360, respectively, the owner or operator of the facility will be considered to be operating an unpermitted facility as provided for in 9VAC20-81-45 and shall be required to either obtain a new permit as required by Part V (9VAC20-81-400 et seq.) or close under Part III (9VAC20-81-100 et seq.) or IV (9VAC20-81-300 et seq.) of this chapter, as applicable.
8. Termination. The director shall terminate a permit by rule and shall require closure of the facility whenever he finds that:
a. As a result of changes in key personnel, the requirements necessary for a permit by rule are no longer satisfied;
b. The applicant has knowingly or willfully misrepresented or failed to disclose a material fact in his disclosure statement, or any other report or certification required under this chapter, or has knowingly or willfully failed to notify the director of any material change to the information in the disclosure statement;
c. Any key personnel have been convicted of any of the crimes listed in § 10.1-1409 of the Code of Virginia, punishable as felonies under the laws of the Commonwealth, or the equivalent of them under the laws of any other jurisdiction; or has been adjudged by an administrative agency or a court of competent jurisdiction to have violated the environmental protection laws of the United States, the Commonwealth, or any other state and the director determines that such conviction or adjudication is sufficiently probative of the permittee's inability or unwillingness to operate the facility in a lawful manner; or
d. The operation of the facility is inconsistent with the facility's operations manual and/or the operational requirements of the regulations.
B. Emergency permits. Notwithstanding any other provision of this chapter, in the event the director finds an imminent and substantial endangerment to human health or the environment, the director may issue a temporary emergency permit to a facility to allow treatment, storage, or disposal of solid waste for a nonpermitted facility or solid waste not covered by the permit for a facility with an effective permit. Such permits:
1. May be oral or written. If oral, it shall be followed within five days by a written emergency permit;
2. Shall not exceed 90 days in duration;
3. Shall clearly specify the solid wastes to be received, and the manner and location of their treatment, storage, or disposal;
4. Shall be accompanied by a public notice including:
a. Name and address of the office granting the emergency authorization;
b. Name and location of the facility so permitted;
c. A brief description of the wastes involved;
d. A brief description of the action authorized and reasons for authorizing it; and
e. Duration of the emergency permit; and
5. Shall incorporate, to the extent possible and not inconsistent with the emergency situation, all applicable requirements of this chapter, and shall include the applicable permit fees under the provisions of 9VAC20-90.
Any permit issued under this subsection may be renewed not more than two times, if necessary. Each such renewal shall be for a period of not more than 90 days.
In the event that the Governor declares a state of emergency, open burning of debris waste from the clean-up operations is conditionally exempt from this chapter provided that no open dump, hazard, or public nuisance is created.
C. Experimental facility permits.
1. The director may issue an experimental facility permit for any solid waste treatment facility that proposes to utilize an innovative and experimental solid waste treatment technology or process for which permit standards for such experimental activity have not been promulgated under Part IV (9VAC20-81-300 et seq.) of this chapter. Any such permit shall include such terms and conditions as will assure protection of human health and the environment. Such permits shall:
a. Provide for the construction of such facilities based on the standards shown in 9VAC20-81-395, as necessary;
b. Provide for operation of the facility for no longer than one calendar year unless renewed as provided in subdivision 3 of this subsection;
c. Provide for the receipt and treatment by the facility of only those types and quantities of solid waste that the director deems necessary for purposes of determining the efficiency and performance capabilities of the technology or process and the effects of such technology or process on human health and the environment; and
d. Shall include such requirements as the director deems necessary to protect human health and the environment (including, but not limited to, requirements regarding monitoring, operation, closure, and remedial action), and such requirements as the director deems necessary regarding testing and providing of information to the director with respect to the operation of the facility.
2. For the purpose of expediting review and issuance of permits under this subsection, the director may, consistent with the protection of human health and the environment, modify or waive permit application and permit issuance requirements in Part V (9VAC20-81-400 et seq.) of this chapter, except that there may be no modification or waiver of regulations regarding local certification, disclosure statement requirements, financial responsibility (including insurance), or procedures regarding public participation.
3. The applicant for an experimental permit shall include the applicable permit fees under the provisions of 9VAC20-90. Any experimental permit issued under this subsection may be renewed not more than three times. Each such renewal shall be for a period of not more than one calendar year.
4. The owner or operator shall demonstrate financial assurance for closure, post-closure care, and corrective action in accordance with the Financial Assurance Regulations for Solid Waste Disposal, Transfer and Treatment Facilities (9VAC20-70), as applicable.
Part B permit application requirements for all solid waste disposal facilities regulated under Part III (9VAC20-81-100 et seq.) are contained in this section. The Part B applications shall include the following requirements and documentation:
A. Plans submitted as part of the Part B application shall include the following:
1. Design plans. Design plans shall be certified by a professional engineer and shall consist of, at least, the following:
a. A title sheet indicating the project title, who prepared the plans, the person for whom the plans were prepared, a table of contents, and a location map showing the location of the site and the area to be served.
b. An existing site conditions plans sheet indicating site conditions prior to development.
c. A base grade plan sheet indicating site base grades or the appearance of the site if it were excavated in its entirety to the base elevation, before installation of any engineering modifications or the beginning of any filing.
d. An engineering modification plan sheet indicating the appearance of the site after installation of engineering modifications. More than one plan sheet may be required for complicated sites. This plan is required only for those sites with engineering modifications.
e. A final site topography plan sheet indicating the appearance of the site, and final contours of the site at closing including the details necessary to prepare the site for long-term care.
f. A series of phasing plan sheets showing the progression of site development through time. At a minimum, a separate plan shall be provided for initial site preparations and for each subsequent major phase or new area where substantial site preparation must be performed. Each such plan shall include a list of construction items and quantities necessary to prepare the phase indicated.
g. A site monitoring plan showing the location of all devices for the monitoring of leachate production, groundwater quality, and gas production and venting. This plan shall include a table indicating the parameters to be monitored for the frequency of monitoring before and during site development. The groundwater monitoring plan shall include information as applicable under 9VAC20-81-250 or 9VAC20-81-260.
h. A series of site cross-sections shall be drawn perpendicular and parallel to the site base line at a maximum distance of 500 feet between cross-sections and at points of grade break and important construction features. The location of the cross-sections shall be shown on the plan sheets and the section labeled using the site grid system. Where applicable, each cross-section shall show existing, proposed base and final grades; soil borings and monitoring wells that the section passes through or is adjacent to; soil types, bedrock and water table; leachate control, collection, and monitoring systems; limits of filling for each major waste type; drainage control structures; access roads and ramps on the site perimeter and within the active fill area; the filling sequence or phases; and other site features.
i. Detailed drawings and typical sections for drainage control structures, access roads, fencing, leachate and gas control systems, and monitoring devices, buildings, signs, and other construction details.
j. Plan sheets shall include:
(1) A survey grid with base lines and bench marks benchmarks to be used for field control. The datum, units of measure, and coordinate system shall be identified, as applicable.
(2) Limits of filling for each major waste type or fill area.
(3) All drainage patterns and surface water drainage control structures both within the actual fill area and at the site perimeter. Such structures may include berms, ditches, sedimentation basins, pumps, sumps, culverts, pipes, inlets, velocity breaks, sodding, erosion matting, or other methods of erosion control.
(4) Ground surface contours at the time represented by the drawing. Spot elevations shall be indicated for key features.
(5) Areas to be cleared and grubbed and stripped of topsoil.
(6) Borrow areas for liner materials, gas venting materials, berms, roadway construction, daily cover, and final cover.
(7) All soil stockpiles including daily and final cover, topsoil, liner materials, gas venting materials, and other excavation.
(8) Access roads and traffic flow patterns to and within the active fill area.
(9) All temporary and permanent fencing.
(10) The methods of screening such as berms, vegetation, or special fencing.
(11) Leachate collection, control, storage, and treatment systems that may include pipes, manholes, trenches, berms, collection sumps, storage units, pumps, risers, liners, and liner splices.
(12) Gas, leachate, and groundwater monitoring devices and systems.
(13) Severe weather solid waste disposal areas.
(14) Support buildings, scale, utilities, gates, and signs.
(15) Special waste handling areas.
(16) Construction notes and references to details.
(17) Other site features.
2. Closure plan. A detailed closure plan shall be prepared and submitted. Such a plan shall be prepared in two parts, one reflecting those measures to be accomplished at the midpoint of the permit period, and the other when the useful life of the landfill is reached. The plan shall show how the facility will be closed to meet the requirements of 9VAC20-81-160 and 9VAC20-81-170, or 9VAC20-81-800. The plan shall include the procedures to be followed in closing the site, sequence of closure, time schedules, final plans of completion of closure to include final contours, and long-term care plan sheets showing the site at the completion of closing and indicating those items anticipated to be performed during the period of long-term care for the site. The plans shall include a table listing the items and the anticipated schedule for monitoring and maintenance. In many instances this information can be presented on the final site topography sheet.
3. Postclosure plan. A postclosure care plan shall contain long-term care information including a discussion of the procedures to be utilized for the inspection and maintenance of: run-off control structures; settlement; erosion damage; gas and leachate control facilities; monitoring for gas, leachate, and groundwater; and other long-term care needs.
B. A design report shall be submitted, which shall include supplemental discussions and design calculations, to facilitate department review and provide supplemental information including the following information:
1. The design report shall identify the project title; engineering consultants; site owner, permittee and operator; proposed permitted acreage; hours of operation; wastes to be accepted; site life; design capacity; and the daily disposal limit. It shall also identify any variances desired by the applicant.
2. A discussion of the basis for the design of the major features of the site, such as traffic routing, base grade and relationships to subsurface conditions, anticipated waste types and characteristics, phases development, liner design, leachate management system design, facility monitoring, and similar design features shall be provided. A list of the conditions of site development as stated in the department determination of site feasibility and the measures taken to meet the conditions shall be included. A discussion of all calculations, such as refuse-cover balance computations, stockpile sizing estimates, estimate of site life, and run-off and leachate volume estimates shall be included. The calculations shall be summarized with the detailed equations presented in an appendix.
3. Specifications, including detailed instructions to the site operator for all aspects of site construction.
a. Initial site preparations including specifications for clearing and grubbing, topsoil stripping, other excavations, berm construction, drainage control structures, leachate collection system, access roads and entrance, screening, fencing, groundwater monitoring, and other special design features.
b. A plan for initial site preparation including a discussion of the field measurements, photographs to be taken, sampling and testing procedures to be utilized to verify that the in-field conditions encountered were the same as those defined in the feasibility report, and to document that the site was constructed according to the engineering plans and specifications submitted for department approval.
C. Financial assurance documentation. When required by the Financial Assurance Regulations of Solid Waste Disposal, Transfer, and Treatment Facilities (9VAC20-70), the applicant shall provide the completed documentation to demonstrate compliance with those regulations; proof of financial responsibility must be for the entity identified in accordance with 9VAC20-81-450 B 10.
D. DEQ Form SW PTB (Part B Permit Application Form). The applicant shall submit a completed DEQ Form SW PTB.
A. Part B permit application requirements for CCR surface impoundments regulated under Part VIII (9VAC20-81-800 et seq.) of this chapter are contained in this section. The Part B applications shall include the requirements and documentation described in this section.
B. A detailed design plan shall be prepared and submitted that describes how the CCR surface impoundment meets the design criteria found in 40 CFR 257.71 (existing CCR surface impoundments), 40 CFR 257.72 (new or lateral expansions of CCR surface impoundments), 40 CFR 257.73 (existing CCR surface impoundments), 40 CFR 257.74 (new or lateral expansions of CCR surface impoundments), as applicable.
C. An operating plan meeting the requirements of 40 CFR 257.80, 40 CFR 257.82, and 40 CFR 257.83 shall be prepared and submitted.
D. A site groundwater monitoring plan shall be prepared and submitted that meets the requirements of 40 CFR 257.90, 40 CFR 257.91, 40 CFR 257.93, 40 CFR 257.94, 40 CFR 257.95, 40 CFR 257.96, 40 CFR 257.97, and 40 CFR 257.98.
E. A detailed closure plan and post-closure plan meeting the requirements found in 40 CFR 257.101, 40 CFR 257.102, 40 CFR 257.103, 40 CFR 257.104 shall be prepared and submitted.
F. The owner or operator shall demonstrate financial assurance for closure, postclosure care and corrective action in accordance with the Financial Assurance Regulations for Solid Waste Disposal, Transfer and Treatment Facilities (9VAC20-70), as applicable.
A. A permit shall specify:
1. Required monitoring, including type, intervals and frequency, sufficient to yield data that are representative of the monitored activity;
2. Requirements concerning the proper use, maintenance, and installation of monitoring equipment or methods, including biological monitoring methods when appropriate; and
3. Applicable reporting requirements based upon the impact of the regulated activity and as specified in this chapter.
B. A permittee shall be subject to the following whenever monitoring is required by the permit:
1. The permittee shall retain records at the permitted facility or another location approved by the department. Records shall include all records required by the facility permit, these regulations, or other applicable regulations. Records of all required monitoring information, including all calibration and maintenance records will be maintained for at least three years from the sample or measurement date. The director may request that this period be extended. For operating landfills, records of the most recent leachate, gas and groundwater monitoring event will be maintained at the facility.
2. Records of monitoring information shall include:
a. The date, exact place, and time of sampling or measurements;
b. The individuals who performed the sampling or measurements;
c. The dates analyses were performed;
d. The individuals who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
3. Required monitoring results shall be maintained on file for inspection by the department.
C. A permittee shall be subject to the following reporting requirements:
1. Written notice of any planned physical alterations to the permitted facility shall be submitted to the department and approved before such alterations are to occur, unless such items were included in the plans and specifications approved by the department.
2. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of the permit, shall be submitted no later than 14 days following each schedule date.
3. The permittee shall report to the department any noncompliance or unusual condition that may endanger health or environment. Any information shall be provided orally within 24 hours from the time the permittee becomes aware of the circumstances. A written submission shall also be provided within five days of the time the permittee becomes aware of the circumstances. The written submission shall contain a description of the circumstances and its cause; the period of occurrence, including exact dates and times, and, if the circumstance has not been corrected, the anticipated time it is expected to continue. It shall also contain steps taken or planned to reduce, eliminate, and prevent reoccurrence of the circumstances resulting in an unusual condition or noncompliance.
D. Copies of all reports required by the permit, and records of all data used to complete the permit application must be retained by the permittee for at least three years from the date of the report or application. The director may request that this period be extended.
E. When the permittee becomes aware that he failed to submit any relevant facts or submitted incorrect information in a permit application or in any report to the director, he shall promptly submit such omitted facts or the correct information with an explanation.