Virginia Regulatory Town Hall

Final Text

highlight

Action:
Amendments Confroming to 2019 Legislaton - Chapter 545
Stage: Final
 
9VAC25-210-10

Part I
VWP Permit Program Definitions, Exclusions, Prohibitions and Requirements

9VAC25-210-10. Definitions.

A. Definitions specific to surface water withdrawals are in 9VAC25-210-300.

B. Unless a different meaning is required by the context, the following terms as used in this chapter shall have the following meanings:

"Adjacent" means bordering, contiguous, or neighboring wetlands separated from other surface water by man-made dikes or barriers, natural river berms, sand dunes, and the like.

"Administratively withdrawn" means a decision by the board that permanently discontinues the review or processing of a VWP permit application or request to modify a VWP permit.

"Applicant" means a person applying for a VWP individual permit or for coverage under a VWP general permit.

"Aquatic environment" means surface waters and the habitat they provide, including both plant and animal communities.

"Avoidance" means not taking or modifying a proposed action or parts of an action so that there is no adverse impact to the aquatic environment.

"Beneficial use" means both instream and offstream uses. Instream beneficial uses include the protection of fish and wildlife resources and habitat, maintenance of waste assimilation, recreation, navigation, and cultural and aesthetic values. The preservation of instream flows for purposes of the protection of navigation, maintenance of waste assimilation capacity, the protection of fish and wildlife resources and habitat, recreation, and cultural and aesthetic values is an instream beneficial use of Virginia's waters. Offstream beneficial uses include domestic uses (including public water supply), agricultural uses, electric power generation, commercial uses, and industrial uses.

"Best management practices" or "BMPs" means a schedule of activities, prohibition of practices, maintenance procedures, and other management practices that prevent or reduce the pollution of surface waters.

"Board" means the State Water Control Board.

"Channelization" means the alteration of a stream channel by widening, deepening, straightening, cleaning, or paving certain areas.

"Compensation" or "compensatory mitigation" means (i) the restoration (reestablishment or rehabilitation), establishment (creation), enhancement, or in certain circumstances preservation of aquatic resources or (ii) in certain circumstances an out-of-kind measure having a water quality, habitat, or other desirable benefit for the purposes of offsetting unavoidable adverse impacts to aquatic resources that remain after all appropriate and practicable avoidance and minimization has been achieved.

"Construction site" means any site where land-disturbing activity is conducted or physically located for the purpose of erecting buildings, roads, or other discrete structures, including on-site or off-site areas used for dependent, support facilities, such as quarries, mines, or temporary stormwater management or erosion control structures.

"Conversion" means those impacts to surface waters that permanently change an existing wetland or aquatic resource type to a different wetland or aquatic resource type.

"Coverage" means authorization to conduct a project in accordance with a VWP general permit.

"Cowardin classification" or "Cowardin classification method," unless otherwise specified in this chapter, means the waters classification system in Classification of Wetlands and Deepwater Habitats of the United States (Cowardin, Lewis M. II, et al., U.S. Fish and Wildlife Service, December 1979, Reprinted 1992).

"Creation" means the establishment of a wetland or other aquatic resource where one did not formerly exist.

"Cross-sectional drawing" means a scaled graph or plot that represents the plane made by cutting across an object at right angles to its length. Objects may include a surface water body or a portion of it, a man-made channel, an above-ground structure, a below-ground structure, a geographical feature, or the ground surface itself.

"Department" or "DEQ" means the Department of Environmental Quality.

"Director" means the Director of the Department of Environmental Quality (DEQ) or an authorized representative.

"Discharge" means, when used without qualification, a discharge of a pollutant, or any addition of any pollutant or combination of pollutants, to state waters.

"Draft VWP permit" means a document indicating the board's tentative decision relative to a VWP permit action.

"Draining" means human-induced activities such as ditching, excavation, installation of tile drains, hydrologic modification by surface water runoff diversion, pumping water from wells, or similar activities such that the activities have the effect of artificially dewatering the wetland or altering its hydroperiod.

"Dredged material" means material that is excavated or dredged from surface waters.

"Dredging" means a form of excavation in which material is removed or relocated from beneath surface waters.

"Ecologically and environmentally preferable" means capable of providing a higher likelihood than alternative proposals of replacing existing wetland acreage and functions, stream functions, water quality, and fish and wildlife resources.

"Emergent wetland" means a class of wetlands dominated by erect, rooted, herbaceous plants growing in water or on a substrate, excluding mosses and lichens. This vegetation is present for most of the growing season in most years and is usually dominated by perennial plants.

"Enhancement" means activities conducted in existing wetlands or other portions of the aquatic environment that increase one or more aquatic functions.

"Excavate" or "excavation" means ditching, dredging, or mechanized removal of earth, soil, or rock.

"Fill" means replacing portions of surface water with upland, or raising the bottom elevation of a surface water for any purpose, by placement of any pollutant or material including rock, sand, earth, and man-made materials and debris.

"Fill material" means any pollutant that replaces portions of surface water with dry land or that raises the bottom elevation of a surface water for any purpose.

"Forested wetland" means a class of wetlands dominated by woody vegetation that is approximately 20 feet (six meters) tall or taller and three inches (7.6 centimeters) or larger in diameter at breast height (DBH). These areas typically possess an overstory of trees, an understory of trees or shrubs, and an herbaceous layer.

"Hydrologic regime" means the entire state of water movement in a given area. It is a function of the climate and includes the phenomena by which water first occurs as atmospheric water vapor, passes into a liquid or solid form, falls as precipitation, moves along or into the ground surface, and returns to the atmosphere as vapor by means of evaporation and transpiration.

"Impacts" means results caused by those activities specified in § 62.1-44.15:20 A of the Code of Virginia.

"Impairment" means the damage, loss, or degradation of the acreage or functions of wetlands or the functions of state waters.

"Independent utility" means a test to determine what constitutes a single and complete project. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a phased development project that depend upon other phases of the project do not have independent utility. Portions of a phased development project that would be constructed even if the other phases are not built can be considered as separate single complete projects with independent public and economic utility.

"In-lieu fee program" means a program operated by a nonprofit organization or governmental agency that receives moneys from persons impacting wetlands or streams pursuant to an authorized, permitted activity and that expends the moneys received to provide consolidated compensatory mitigation for permitted wetland or stream impacts.

"Isolated wetlands of minimal ecological value" means those wetlands that (i) do not have a surface water connection to other state waters, (ii) are less than one-tenth of an acre (0.10 acre or 4,356 square feet) in size, (iii) are not located in a Federal Emergency Management Agency designated 100-year floodplain, (iv) are not identified by the Virginia Natural Heritage Program as a rare or state significant natural community, (v) are not forested, and (vi) do not contain listed federal or state threatened or endangered species.

"Joint Permit Application" or "JPA" means an application form that is used to apply for permits from the Norfolk District Army Corps of Engineers, the Virginia Marine Resources Commission, the Virginia Department of Environmental Quality, and local wetland boards for work in waters of the United States and in surface waters of Virginia.

"Law" means the State Water Control Law of Virginia.

"Legal name" means the full legal name of an individual, business, or other organization. For an individual, legal name means the first name, middle initial, last name, and suffix. For an entity authorized to do business in Virginia, the legal name means the exact name set forth in the entity's articles of incorporation, organization or trust, or formation agreement, as applicable.

"Minimization" means lessening impacts by reducing the degree or magnitude of the proposed action and its implementation.

"Mitigation" means sequentially avoiding and minimizing impacts to the maximum extent practicable, and then compensating for remaining unavoidable impacts of a proposed action.

"Mitigation bank" means a site providing off-site, consolidated compensatory mitigation that is developed and approved in accordance with all applicable federal and state laws or regulations for the establishment, use, and operation of mitigation banks and is operating under a signed banking agreement.

"Mitigation banking" means compensating for unavoidable wetland or stream losses in advance of development actions through the sale or purchase of credits from a mitigation bank.

"Nationwide permit" means a general permit issued by the U.S. Army Corps of Engineers (USACE) under 33 CFR Part 330 and, except where suspended by individual USACE Corps Districts, applicable nationwide.

"Nontidal wetland" means those wetlands other than tidal wetlands that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions, as defined by the U.S. Environmental Protection Agency pursuant to § 404 of the federal Clean Water Act in 40 CFR 230.3(t). Wetlands generally include swamps, marshes, bogs, and similar areas.

"Normal agricultural activities" means those activities defined as an agricultural operation in § 3.2-300 of the Code of Virginia and any activity that is conducted as part of or in furtherance of such agricultural operation but shall not include any activity for which a permit would have been required as of January 1, 1997, under 33 USC § 1344 or any regulations promulgated pursuant thereto.

"Normal residential gardening and lawn and landscape maintenance" means ongoing noncommercial residential activities conducted by or on behalf of an individual occupant, including mowing; planting; fertilizing; mulching; tilling; vegetation removal by hand or by hand tools; and placement of decorative stone, fencing, and play equipment. Other appurtenant noncommercial activities, provided that they do not result in the conversion of a wetland to upland or to a different wetland type, may also be included.

"Normal silvicultural activities" means any silvicultural activity as defined in § 10.1-1181.1 of the Code of Virginia, and any activity that is conducted as part of or in furtherance of such silvicultural activity but shall not include any activity for which a permit would have been required as of January 1, 1997, under 33 USC § 1344 or any regulations promulgated pursuant thereto.

"Notice of project completion" means a statement submitted by the permittee or authorized agent that the authorized activities and any required compensatory mitigation have been completed.

"Open water" means an area that, during a year with normal patterns of precipitation, has standing water for sufficient duration to establish an ordinary high water mark. The term "open water" includes lakes and ponds but does not include ephemeral waters, stream beds, or wetlands.

"Ordinary high water" or "ordinary high water mark" means that line on the shore established by the fluctuations of water and indicated by physical characteristics such as a clear, natural line impressed on the bank; shelving; changes in the character of soil; destruction of terrestrial vegetation; the presence of litter and debris; or other appropriate means that consider the characteristics of the surrounding areas.

"Out-of-kind compensatory mitigation" or "out-of-kind mitigation" means a measure that does not replace the same type of wetland or surface water as was impacted but does replace lost wetland or surface water functions or provide a water quality, habitat, or other desirable benefit.

"Perennial stream" means a well-defined channel that contains water year round during a year of normal rainfall. Generally, the water table is located above the stream bed for most of the year and groundwater is the primary source for stream flow. A perennial stream exhibits the typical biological, hydrological, and physical characteristics commonly associated with the continuous conveyance of water.

"Permanent flooding or impounding" means a permanent increase in the duration or depth of standing water on a land surface, such as from a dam. Permanent increases in duration or depth of standing water that result from extended-detention basins and enhanced extended-detention basins, when designed, constructed, and maintained to function in accordance with Virginia Department of Conservation and Recreation (DCR) standards for such facilities (Virginia Stormwater Management Handbook, First Edition, 1999, Volume 1, Chapter 3), or when designed in accordance with local standards that, at a minimum, meet the DCR standards, are not considered to be permanent flooding and impounding.

"Permanent impacts" means those impacts to surface waters, including wetlands, that cause a permanent alteration of the physical, chemical, or biological properties of the surface waters or of the acreage or functions of a wetland.

"Permittee" means the person who holds a VWP individual or general permit.

"Permittee-responsible compensatory mitigation" or "permittee-responsible mitigation" means compensation or compensatory mitigation, as defined in this section, that is undertaken by the permittee, or an authorized agent or contractor, for which the permittee retains full responsibility.

"Person" means individual, corporation, partnership, association, governmental body, municipal corporation, or any other legal entity.

"Phased development" means more than one project proposed for a single piece of property or an assemblage of contiguous properties under consideration for development by the same person, or by related persons, that will begin and be completed at different times. Depending on the relationship between the projects, a phased development may be considered a single and complete project or each project may be considered a single and complete project if each project has independent utility, as defined in this section.

"Plan view drawing" means a scaled graph or plot that represents the view of an object as projected onto orthogonal planes. Objects may include structures, contours, or boundaries.

"Pollutant" means any substance, radioactive material, or heat that causes or contributes to or may cause or contribute to pollution.

"Pollution" means such alteration of the physical, chemical, or biological properties of any state waters as will or is likely to create a nuisance or render such waters (i) harmful or detrimental or injurious to the public health, safety, or welfare or to the health of animals, fish, or aquatic life; (ii) unsuitable with reasonable treatment for use as present or possible future sources of public water supply; or (iii) unsuitable for recreational, commercial, industrial, agricultural, or other reasonable uses; provided that (a) an alteration of the physical, chemical, or biological property of state waters, or a discharge or deposit of sewage, industrial wastes or other wastes to state waters by any owner which by itself is not sufficient to cause pollution, but which, in combination with such alteration of or discharge or deposit to state waters by other owners is sufficient to cause pollution; (b) the discharge of untreated sewage by any owner into state waters; and (c) contributing to the contravention of standards of water quality duly established by the board, are "pollution" for the terms and purposes of this chapter.

"Practicable" means available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes.

"Preservation" means the protection of resources in perpetuity through the implementation of appropriate legal and physical mechanisms.

"Profile drawing" means a scaled graph or plot that represents the side view of an object. Objects may include a surface water body or a portion of it, a man-made channel, an above-ground structure, a below-ground structure, a geographical feature, or the ground surface itself.

"Public hearing" means a fact finding proceeding held to afford interested persons an opportunity to submit factual data, views, and comments to the board pursuant to § 62.1-44.15:02 of the Code of Virginia.

"Regional permit" means a general permit issued by the U.S. Army Corps of Engineers under 33 CFR Part 330 and applicable within a specified geographic area.

"Restoration" means the reestablishment of a wetland or other aquatic resource in an area where it previously existed. Wetland restoration means the reestablishment of wetland hydrology and vegetation in an area where a wetland previously existed. Stream restoration means the process of converting an unstable, altered, or degraded stream corridor, including adjacent areas and floodplains, to its natural conditions.

"Riprap" means a layer of nonerodible material such as stone or chunks of concrete.

"Section 401" means § 401 of the Clean Water Act, or 33 USC § 1341, as amended in 1987.

"Scrub-shrub wetland" means a class of wetlands dominated by woody vegetation, excluding woody vines, approximately three to 20 feet (one to six meters) tall. The species include true shrubs, young trees, and trees or shrubs that are small or stunted because of environmental conditions.

"Significant alteration or degradation of existing wetland acreage or function" means human-induced activities that cause either a diminution of the areal extent of the existing wetland or cause a change in wetland community type resulting in the loss or more than minimal degradation of its existing ecological functions.

"Single and complete project" means the total project proposed or accomplished by a person, which also has independent utility as defined in this section. For linear projects, the single and complete project (e.g., a single and complete crossing) will apply to each crossing of a separate surface water (e.g., a single water body) and to multiple crossings of the same water body at separate and distinct locations. Phases of a project that have independent utility may each be considered single and complete.

"State waters" means all water, on the surface and under the ground, wholly or partially within or bordering the Commonwealth or within its jurisdiction, including wetlands.

"Stream bed" or "stream channel" means the substrate of a stream, as measured between the ordinary high water mark along each side of a stream. The substrate may consist of organic matter, bedrock, or inorganic particles that range in size from clay to boulders, or a combination of both. Areas contiguous to the stream bed, but outside of the ordinary high water mark along each side of a stream, are not considered part of the stream bed.

"Surface water" means all state waters that are not groundwater as groundwater is defined in § 62.1-255 of the Code of Virginia.

"Suspend" or "suspension" means a decision by the board that stops the review or processing of a permit application or request to modify a permit or permit coverage until such time that information requested by the board is provided, reviewed, and deemed adequate.

"Temporal loss" means the time lag between the loss of aquatic resource functions caused by the impacts and the replacement of aquatic resource functions by compensatory mitigation.

"Temporary impacts" means impacts to wetlands or other surface waters that do not cause a permanent alteration of the physical, chemical, or biological properties of surface waters or the permanent alteration or degradation of existing wetland acreage or functions. Temporary impacts include activities in which the impact area is restored to its preconstruction elevations and contours with topsoil from the impact area where practicable, such that previous wetland acreage and functions or surface water functions are restored.

"Tidal wetland" means vegetated and nonvegetated wetlands as defined in § 28.2-1300 of the Code of Virginia.

"Toxic pollutant" means any agent or material including those listed under § 307(a) of the Water Pollution Prevention and Control Act (33 USC § 1317(a)), which after discharge will, on the basis of available information, cause toxicity. Toxicity means the inherent potential or capacity of a material to cause adverse effects in a living organism, including acute or chronic effects to aquatic life, detrimental effects on human health, or other adverse environmental effects.

"Undesirable plant species" means any species that invades, naturally colonizes, or otherwise dominates a compensatory mitigation site or mitigation bank, such that it causes or contributes to the failure of the vegetative success criteria for a particular compensatory mitigation site, mitigation bank, or in-lieu fee program project, or it otherwise prohibits the restoration of the same vegetation cover type that was originally present.

"VWP general permit" means the general permit text, terms, requirements, and conditions set forth in a regulation that constitutes a VWP permit authorizing a specified category of activities.

"VWP permit" means an individual or general permit issued by the board under § 62.1-44.15:20 of the Code of Virginia that authorizes activities otherwise unlawful under § 62.1-44.5 of the Code of Virginia or otherwise serves as the Commonwealth of Virginia's § 401 certification. For any applicant to the Federal Energy Regulatory Commission for a certificate of public convenience and necessity pursuant to § 7c of the federal Natural Gas Act (15 USC § 717f(c)) to construct any natural gas transmission pipeline greater than 36 inches inside diameter, issuance of an individual VWP permit pursuant to this chapter and a certification issued pursuant to Article 2.6 (§ 62.1-44.15:80 et seq.) of the State Water Control Law shall together constitute the certification required under § 401 of the federal Clean Water Act.

"Water quality standards" means water quality standards adopted by the board and approved by the administrator of the U.S. Environmental Protection Agency under § 303 of the Clean Water Act as defined in 9VAC25-260-10 9VAC25-260-5.

"Watershed approach" means an analytical process for making compensatory mitigation decisions that support the sustainability or improvement of aquatic resources in a watershed and that ensures authorized impacts and mitigation have been considered on a watershed scale.

"Wetlands" means those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.

9VAC25-210-116

9VAC25-210-116. Compensation.

A. No net loss. Compensatory mitigation for project impacts shall be sufficient to achieve no net loss of existing wetland acreage and no net loss of functions in all surface waters. Compensatory mitigation ratios appropriate for the type of aquatic resource impacted and the type of compensation provided shall be applied to permitted impacts to help meet this requirement. Credit may be given for preservation of upland buffers already protected under other ordinances to the extent that additional protection and water quality and fish and wildlife resource benefits are provided.

B. Practicable and ecologically and environmentally preferable compensation alternatives.

1. An analysis shall be required to justify that permittee-responsible compensatory mitigation is ecologically and environmentally preferable to the purchase of mitigation bank credits or in-lieu fee program credits, if such credits are available in sufficient quantity for the project at the projected time of need. The analysis shall address the ability of the permittee-responsible compensatory mitigation site or sites to replace lost wetland acreage and functions or lost stream functions and water quality benefits. The analysis comparing the impacted and compensation site or sites may use a method that assesses water quality or habitat metrics, such as that required by 9VAC25-210-80 C, or a method that assesses such criteria as water quality benefits, distance from impacts, hydrologic source and regime, watershed, vegetation type, soils, constructability, timing of compensation versus impact, property acquisition, and cost.

2. The applicant shall demonstrate that permittee-responsible compensatory mitigation can be protected in perpetuity through a protective mechanism approved by the Department of Environmental Quality, such as, but not limited to, a conservation easement held by a third party in accordance with the Virginia Conservation Easement Act (§ 10.1-1009 et seq. of the Code of Virginia) or the Virginia Open-Space Act (§ 10.1-1700 et seq. of the Code of Virginia), a duly recorded declaration of restrictive covenants, or other protective instrument.

C. Compensatory mitigation proposals shall be evaluated as follows:

1. The purchase of mitigation bank credits and in-lieu fee program credits when available shall in most cases be deemed the ecologically and environmentally preferable form of compensation for project impacts. However, permittee-responsible compensatory mitigation may be considered when the applicant satisfactorily demonstrates that permittee-responsible compensatory mitigation is ecologically and environmentally preferable in accordance with subdivision B 1 of this section.

2. Compensatory mitigation for unavoidable wetland impacts may be met through the following options, which are preferred in the following sequence: mitigation banking, in-lieu fee program, and permittee-responsible compensatory mitigation. However, the appropriate compensatory mitigation option for project impacts shall be evaluated on a case-by-case basis, in terms of replacement of wetland acreage and functions and the greatest likelihood of success the board shall evaluate the appropriate compensatory mitigation option on a case-by-case basis with consideration for which option is practicable and ecologically and environmentally preferable, including, in terms of replacement of acreage and functions, which option offers the greatest likelihood of success and avoidance of temporal loss of acreage and function. This evaluation shall be consistent with the U.S. Army Corps of Engineers Compensatory Mitigation for Losses of Aquatic Resources as provided in 33 CFR Part 332. When considering options for providing the required compensatory mitigation, DEQ shall consider the type and location options in the following order:

a. Mitigation bank credits;

b. In-lieu fee program credits;

c. Permittee-responsible mitigation under a watershed approach;

d. Permittee-responsible mitigation through on-site and in-kind mitigation;

e. Permittee-responsible mitigation through off-site or out-of-kind mitigation;

f. Restoration, enhancement, or preservation of upland buffers adjacent to wetlands when utilized in conjunction with subdivision 2 a, 2 b, 2 c, 2 d, or 2 e of this subsection and when consistent with subsection A of this section; and

g. Preservation of wetlands when utilized in conjunction with subdivision 2 a, 2 b, 2 c, 2 d, or 2 e of this subsection and when consistent with subsection A of this section.

3. Compensatory mitigation for unavoidable stream impacts may be met through the following options, which are preferred in the following sequence: mitigation banking, in-lieu fee program, and permittee-responsible mitigation. However, the appropriate compensatory mitigation option for project impacts shall be evaluated on a case-by-case basis, in terms of replacement of stream functions and water quality benefits and the greatest likelihood of success the board shall evaluate the appropriate compensatory mitigation option on a case-by-case basis with consideration for which option is practicable and ecologically and environmentally preferable, including, in terms of replacement of acreage and functions, which option offers the greatest likelihood of success and avoidance of temporal loss of acreage and function. This evaluation shall be consistent with the U.S. Army Corps of Engineers Compensatory Mitigation for Losses of Aquatic Resources as provided in 33 CFR Part 332. One factor in determining the required compensation shall be an analysis of stream impacts utilizing a stream impact assessment methodology approved by the board. When considering options for providing the required compensatory mitigation, DEQ shall consider the type and location options in the following order:

a. Mitigation bank stream credits;

b. In-lieu fee program credits;

c. Permittee-responsible mitigation under a watershed approach;

d. Permittee-responsible mitigation through on-site and in-kind mitigation;

e. Permittee-responsible mitigation through off-site or out-of-kind mitigation;

f. Restoration, enhancement, or preservation of upland buffers adjacent to streams when utilized in conjunction with subdivision 3 a, 3 b, 3 c, 3 d, or 3 e of this subsection and when consistent with subsection A of this section; and

g. Preservation of stream channels and adjacent riparian buffers when utilized in conjunction with subdivision 3 a, 3 b, 3 c, 3 d, or 3 e of this subsection and when consistent with subsection A of this section.

4. Compensatory mitigation for open water impacts may be required to protect state waters and fish and wildlife resources from significant impairment, as appropriate. Compensation shall not be required for permanent or temporary impacts to open waters that are identified as palustrine by the Cowardin classification method, but compensation may be required when such open waters are located in areas of karst topography in Virginia and are formed by the natural solution of limestone.

D. In-lieu fee program approval.

1. The board may approve the use of a program by issuing a VWP permit for a specific project or by taking an enforcement action and following applicable public notice and comment requirements, or by granting approval of a program after publishing a notice of its intent in the Virginia Register of Regulations and accepting public comments on its approval for a minimum of 30 days.

2. Where a program is mandated by the Code of Virginia to be implemented and such program is approved by the U.S. Army Corps of Engineers, the program may be used as deemed appropriate for any VWP permit or enforcement action.

3. An approved program must meet the following criteria:

a. Demonstration of a no net loss policy in terms of wetland acreage and functions or stream functions and water quality benefits by adoption of operational goals or objectives for restoration, creation, enhancement, or preservation;

b. DEQ approval of each site for inclusion in the program;

c. A commitment to provide annual reports to the board detailing contributions received and acreage and type of wetlands or streams preserved, created or restored in each watershed with those contributions, as well as the compensatory mitigation credits contributed for each watershed of project impact;

d. A mechanism to establish fee amounts that will ensure each contribution will be adequate to compensate for the wetland acreage and functions or stream functions and water quality benefits lost in the impacted watershed; and

e. Such terms and conditions as the board deems necessary to ensure a no net loss of wetland acreage and functions or stream functions and water quality benefits from permitted projects providing compensatory mitigation.

4. Approval may be granted for up to 10 years and may be renewed by the board upon a demonstration that the program has met the criteria in subdivision 3 of this subsection.

E. Use of mitigation banks. The use of mitigation banks for compensating project impacts shall be deemed appropriate if the following criteria are met:

1. The bank meets the criteria and conditions found in § 62.1-44.15:23 of the Code of Virginia;

2. The bank is ecologically and environmentally preferable to practicable on-site and off-site individual compensatory mitigation options;

3. The banking instrument, if approved after July 1, 1996, has been approved by a process that involved public review and comment in accordance with federal guidelines; and

4. The applicant provides verification to DEQ of purchase of the required amount of credits.

F. For permittee-responsible mitigation, the final compensatory mitigation plan shall include complete information on all components of the conceptual compensatory mitigation plan detailed in 9VAC25-210-80 B 1 m and:

1. For wetlands, the final compensation plan for review and approval by DEQ shall also include a summary of the type and acreage of existing wetland impacts anticipated during the construction of the compensation site and the proposed compensation for these impacts; a site access plan; a monitoring plan, including proposed success criteria, monitoring goals, and the location of photo-monitoring stations, monitoring wells, vegetation sampling points, and reference wetlands or streams if available; an abatement and control plan for undesirable plant species; an erosion and sedimentation control plan; a construction schedule; and the final protective mechanism for the compensation site or sites, including all surface waters and buffer areas within its boundaries. The approved protective mechanism shall be recorded in the chain of title to the property, or an equivalent instrument for government-owned lands, and proof of recordation shall be submitted to DEQ prior to commencing impacts in surface waters.

2. For streams, the final compensation plan for review and approval by DEQ shall also include a site access plan; an erosion and sedimentation control plan, if appropriate; an abatement and control plan for undesirable plant species; a monitoring plan, including a monitoring and reporting schedule, monitoring design, and methodologies for success; proposed success criteria; location of photo-monitoring stations, vegetation sampling points, survey points, bank pins, scour chains, and reference streams; a plan view drawing depicting the pattern and all compensation measures being employed; a profile drawing; cross-sectional drawing or drawings of the proposed compensation stream; and the final protective mechanism for the compensation site or sites, including all surface waters and buffer areas within its boundaries. The approved protective mechanism shall be recorded in the chain of title to the property, or an equivalent instrument for government-owned lands, and proof of recordation shall be submitted to DEQ prior to commencing impacts in surface waters.