RIS Transmittal Sheet
The following is the data sent over to the RIS system for this petition announcement.| petitionid | 468 |
| issue | 9 |
| volume | 43 |
| publicationdate | 12/14/2026 |
| filedatetime | 11/12/2026 12:43pm |
| boardname | State Water Control Board |
| titlenum | 9 |
| agencynum | 25 |
| coordinatorname | Melissa Porterfield |
| coordinatorphone | (804)698-4238 |
| coordinatoremail | melissa.porterfield@deq.virginia.gov |
| contactname | William K. Norris |
| contacttitle | |
| contactemail | william.norris@deq.virginia.gov |
| contactphone | (804)350-2743 |
| contactaddress1 | P.O. Box 1105 |
| contactaddress2 | |
| contactcity | Richmond |
| contactstate | VA |
| contactzip | 23218 |
| stateauthority | Sections 62.1-44.15(10) and 62.1-44.38 of the Code of Virginia |
| federalauthority | n/a |
| recievedate | 11/12/2026 |
| petitioner | Green Recursive Utility Service LLC |
| request |
Petitioner requests that the Board amend 9VAC25-200 (Water Withdrawal Reporting) to prescribe that the data-center water volumes reported under 9VAC25-200-40 B 3 — the monthly volumes of potable water and of reclaimed water provided to a data center with an air permit issued by the Department, first reported for periods beginning January 1, 2027 — be measured and stated in accordance with GRUS-STD-60084 v2.0-U (Uniform Edition), DOI 10.5281/zenodo.23246001, incorporated by reference, including: (1) metered measurement of water supplied, stated by source — potable, reclaimed, and any other source — at or near the point of delivery; (2) a statement, accompanying the reported figures, of the metered quantities and the measurement method from which each reported figure is derived; and (3) the consumption classification of the facility served, computed under the Standard from the facility's characteristics. A copy of the full petition is available from the point of contact for this petition. |
| agencyplan |
A 21-day public comment period is being announced in the Virginia Register of Regulations. Upon completion of the public comment period, the State Water Control Board will consider the petition at a future meeting and decide whether or not to move forward with the rulemaking. Any public comment on the petition must be made during the 21-day public comment period. Public comment on the petition will not be accepted at the State Water Control Board meeting. |
| commentenddate | 01/04/2027 |
| chapternumber | 200 |
| chaptername | Water Withdrawal Reporting |
| title | Response to Petition for Rulemaking |