The notice of intent (NOI) for the 116-megawatt Seven Bridges project proposed in Mecklenburg County has been withdrawn. The original General Notice posted on November 27, 2019, can be found at https://www.townhall.virginia.gov/L/ViewNotice.cfm?gnid=1058.
| Name / Title: | Amber Foster / Renewable Energy PBR Coordinator |
| Address: |
1111 E. Main Street, Suite 1400 Richmond, 23219 |
| Email Address: | amber.foster@deq.virginia.gov |
| Telephone: | (804)774-8474 FAX: ()- TDD: ()- |