Virginia Regulatory Town Hall
 
Agency
Department of Environmental Quality
Guidance Document Information
Title Streamlined Plan Review for Construction Stormwater Plans and Erosion and Sediment Control Plans submitted by a Licensed Design Professional and reviewed by a Dual Combined Administrator for Erosion and Sediment Control and Stormwater Management
Document ID GM22-2011
Effective Date 1/19/2023
pdf View document text     Posted On 2/14/2023                 Document on Town Hall

This document applies to the following chapters
[9 VAC 25-870] Virginia Stormwater Management Program (VSMP) Regulation (formerly 4VAC50-60)
Public Comment Forums / Change History
Proposed Change Register Date Status
This guidance document provides for: 1) a streamlined stormwater management (SWM) plan review process in instances where DEQ is the Virginia Stormwater Management Program (VSMP) authority and 2) a streamlined erosion and sediment control (ESC) plan review process where DEQ is the Virginia Erosion an.... 12/19/2022 Forum ended on 1/18/2023 with 2 Comments.


Back to showing guidance documents for this board

Back to showing guidance documents for this agency