Virginia Regulatory Town Hall
Agency
Department of Environmental Quality
Guidance Document Information
Title Interim Guidance for Permit Applicability for Emergency Generators Participating in an Emergency Load Response Program
Document ID APG-570
Summary This policy provides interim guidance to air permitting and compliance staff concerning permit applicability for emergency generators. The policy expands the definition of “emergency” as currently defined under 9 VAC 5-80-1110 C to incorporate operation as part of an Independent System Operator’s (ISO) Emergency Load Response Program. This policy does not apply to generators that are used for voluntary load response (i.e. load curtailment, demand response, or peak shaving). This guidance is not intended to cover every possible situation but should be applicable in most scenarios. Check with the regional air permit manager and/or the central office staff if a deviation from the guidance is considered to be necessary.
Effective Date 5/15/2009
pdf View document text     Posted On 5/15/2009                 Document on Town Hall

This document applies to all chapters for the following boards
[9 VAC 5] Air Pollution Control Board


Back to showing guidance documents for this board

Back to showing guidance documents for this agency