The scoring criteria appear to distinguish between projects that are 90% or greater NBS, and hybrid flood risk reduction approaches defined as 30-89% NBS combined with grey infrastructure. Could you clarify how the percentage of nature-based solutions (NBS) is determined within a flood risk reduction project? Is the percentage a calculation of the budget, project area, functionality, etc.?