Action:
Establishment of Procedures for Reviewing and Approving BMPs (4VAC50-60-1300 et seq.)
[Withdrawn 10/25/2013]
Reason for Withdrawal
On September 30, 2013 the State Water Control Board voted to withdraw this action. Interim procedures will be established in guidance and a separate regulatory process initiated to establish a process for approval of Best Management Practices.
General Information
Action Summary |
This regulatory action amends the Virginia Stormwater Management Program (VSMP) Permit Regulations (4 VAC 50-60), creating a new Part XVI titled “Procedures For Reviewing and Approving Design Specifications and Pollutant Removal Credits for BMPs” (4VAC50-60-1300 et seq.) within the body of the Stormwater Management regulations, incorporating a new technical guidance document by reference (Virginia Technology Assessment Protocol For Evaluating Stormwater Manufactured Treatment Devices), and including four new associated forms. The new Part XVI establishes procedures for the consistent and reliable testing and verification of stormwater Best Management Practice (BMP) performance and provides for a systematic state review and approval process for BMP Design Specifications and Pollutant Removal Credits. |
Chapters Affected |
Only affects this chapter.
|
Exempt from APA |
No, this action is subject to Article 2 of the Administrative Process Act.
|
RIS Project |
Yes [003500] |
New Periodic Review |
This action will not be used to conduct a new periodic review.
|
Stages
Stages associated with this regulatory action.
Stage ID |
Stage Type |
Status |
6562
|
Fast-Track
|
Stage withdrawn on 10/25/2013 before the Secretary's office completed its review. |
Contact Information
Name / Title:
|
Erin Belt
|
Address:
|
1111 East Main Street, Suite 1400
P.O. Box 1105
Richmond, VA 23218
|
Email Address:
|
erin.belt@deq.virginia.gov
|
Phone:
|
(757)374-4621
FAX: (804)698-4178
TDD: ()-
|
This person is the primary contact for this chapter.