1% Rule - Ch 5 Section 5.3.2.1 Developers Engineers & Contractors, LLC  3/8/24  12:26 pm
10% Drainage Area - Appendix A, Section A.5.4 Developers Engineers & Contractors, LLC  3/8/24  12:30 pm
Stormwater Ponds in Open Space. BMP Specifications - Ch 8.5 P-Fil-07, Section 2.1 Developers Engineers & Contractors, LLC  3/8/24  12:32 pm
Plan Review Timelines – DEQ Example Ordinance (not in handbook) Developers Engineers & Contractors, LLC  3/8/24  12:37 pm
Maintain the Law’s Max Allowable Pollutant Load - Ch 5 Section 5.3.2.6.1 Developers Engineers & Contractors, LLC  3/8/24  12:45 pm
Early Grading Plans – Ch 4. Section 4.3.3 Developers Engineers & Contractors, LLC  3/8/24  12:53 pm
Create a better independent system to alter the handbook’s “living document”. Ch. 1 Section 1.4.2 Developers Engineers & Contractors, LLC  3/8/24  12:54 pm
Plan Reviewer Dispute Facilitator - Ch 4. Section 4.3.3.1.5 Developers Engineers & Contractors, LLC  3/8/24  12:56 pm
Create a More Reasonable Performance Bond. DEQ Example Ordinance. Developers Engineers & Contractors, LLC  3/8/24  12:59 pm
Collecting only Half the Fees at Time of Submittal – Ch. 4 Section 4.3.2.7.1.10 Developers Engineers & Contractors, LLC  3/8/24  1:02 pm
Phosphorous Load Change. Greg Lester, Developer  3/11/24  3:17 pm
Performance Bond Greg Lester, Developer  3/11/24  3:24 pm
Permit Fees Greg Lester, Developer  3/11/24  3:25 pm
10% deviation of drainage areas Sheldon Bower, PE Parker Design Group, Inc  3/13/24  11:18 am
Limits of Analysis and "1% Rule" Sheldon Bower, PE Parker Design Group, Inc  3/13/24  11:25 am
Natural Channel Definition Sheldon Bower, PE Parker Design Group, Inc  3/13/24  11:26 am
Maximum Allowable Pollutant Load Sheldon Bower, PE Parker Design Group, Inc  3/13/24  11:28 am
Support of comments made by Developers, Engineers, & Contractors, LLC Sheldon Bower, PE Parker Design Group, Inc  3/13/24  11:29 am
Concurrence of comments made by Developers Engineers & Contractors, LLC Jay Lewis, PE, LS  3/15/24  2:24 pm
A.3.7.2.D Post-Development Curve Number Selection Lisa Perry, Monteverde Engineering  3/21/24  9:08 am
A.3.7.2 Post-development CN Selection REPEAT Comment Megan, Kirk Engineering  3/21/24  2:29 pm
Appendix A, Pollutant Load, and Manmade Lakes Erik Plyler, The Plyler Group  3/25/24  11:26 am
Managed Turf Dominant Projects Erik Plyler, The Plyler Group  3/25/24  11:41 am
Increasing Development Burden and Costs Matt Huff, Poe & Cronk Commercial Real Estate Group  3/25/24  11:53 am
Create and independent system to alter the Handbook, Section 1.4.2 Steve Chisholm, CMC Supply, Inc  3/26/24  11:19 am
Section A.5.4 10% allowance. Peter Fields Fields Construction, Inc.  3/26/24  12:07 pm
Pollutant load references Peter Fields Fields Construction, Inc.  3/26/24  12:10 pm
Create independant system to alter the Handbook, Sec. 1.4.2 Peter Fields Fields Construction, Inc.  3/26/24  12:19 pm
Section 5.3.2.1 and Appendix A Limits of Analysis Michael Cagle  3/26/24  1:17 pm
Section A.5.4 10% allowance Michael Cagle  3/26/24  1:22 pm
Section A.5.1.3 Manmade Lakes Michael Cagle  3/26/24  1:23 pm
Pollutant Load References Michael Cagle  3/26/24  1:24 pm
Ponds in Open Space – Ch 8.5 P-Fil-07 Michael Cagle  3/26/24  1:25 pm
Allow Early Grading Plan Approval – Section 4.3.3 Michael Cagle  3/26/24  1:25 pm
Create an independent system to alter the Handbook, Section 1.4.2 Michael Cagle  3/26/24  1:28 pm
Clarification on document replacement Margie Noonan  3/26/24  1:29 pm
Pollutant Load References Sam Lionberger, Lionberger Construction  3/26/24  4:37 pm
Support of comments made by Developers, Engineers, & Contractors, LLC Keane Rucker, PE, Shimp Engineering, PC  3/26/24  5:10 pm
Appendix C clarifications William Sledjeski, PSS, Soil Tech Inc.  3/26/24  5:29 pm
MAREC Action Comments David Murray, MAREC Action  3/27/24  10:58 am
Clarify where on the project site temporary stabilization requirements apply. (Chapter 6.3.1.5.2) David Murray, MAREC Action  3/27/24  11:39 am
Available Alternatives in Solar Stormwater Runoff Computations (6.3.1.5.3) David Murray, MAREC Action  3/27/24  11:41 am
Stow Angle Recommendation in Solar Cell Orientation/Inclination (6.3.1.5.4) David Murray  3/27/24  11:42 am
Requirements in 6.3.1.5.5 (c) David Murray, MAREC Action  3/27/24  11:42 am
Panel Spacing Requirement (6.3.1.5.5) (d) David Murray, MAREC Action  3/27/24  11:43 am
Appendix B - Virginia Runoff Reduction Method (Version 4.1 of the VRRM spreadsheet) David Murray, MAREC Action  3/27/24  11:44 am
Linear Projects Exclusions for Utility Projects Trent Warner, Developers Engineers & Contractors, LLC  3/27/24  11:44 am
Section 6.3.1.5.3 & Guidance Memo 22-201 David Murray, MAREC Action  3/27/24  2:07 pm
Linear Utility Project Exemption Wayne R. Massie  3/27/24  2:10 pm
Concurrance with prior Commenters Megan, Kirk Engineering  3/27/24  3:01 pm
Bioretention and Single-Family Homes Jeff Sledjeski, OSE  3/27/24  3:35 pm
Infiltration and Single-Family Homes Jeff Sledjeski, OSE  3/27/24  3:57 pm
A.5.6/P-SUP-08 Sheet Flow and Level Spreader Computations REPEAT COMMENT Megan, Kirk Engineering  3/27/24  4:14 pm
Support for comments presented by Engineers, Developers, and Contractors Michael Bryant / Hurt &Proffitt  3/27/24  4:44 pm
Concurance with comments James Kirk, PE, Kirk Engineering PLC  3/27/24  5:01 pm
Technical matters critical to affordable housing in VA James Taylor, PE; Balzer & Associates  3/27/24  5:18 pm
DEQ Stormwater Management Handbook Chip Dicks, Gentry Locke  3/27/24  5:34 pm
Section 1.4.2 Handbook Updates and Revisions Process James Taylor, PE; Balzer & Associates  3/27/24  7:21 pm
Concurrence with Comments - Linear Utility Project Exemption Rhonda English, BRWA  3/27/24  8:33 pm


Trouble posting comments? These pages have been tested with multiple versions of all the major browsers. If you have trouble: (1) try another computer if you have access to one, (2) try another browser if your computer has one installed (3) contact Town Hall support staff for assistance.