Search Options
Home
>
Find a Regulation
Regulatory Activity
Actions Underway
Petitions
Legislative Mandates
Periodic Reviews
General Notices
Meetings
Guidance Documents
Comment Forums
Sign in
State Agency
Registered Public
Sign up
Department of Environmental Quality
GDForum ID: 2728
Description of Proposed Guidance Document Changes
Rescinding nine State Water Control Board guidance documents. In developing and issuing the Virginia Stormwater Management Handbook, the Department incorporated relevant portions of the guidance documents being rescinded into the Virginia Stormwater Management Handbook to reduce complexity and improve the ease of use. However, to have a transition period for stakeholders, who had been using the existing manuals and guidance for years, and to provide flexibility for projects that were already in the planning stage, the Department provided a one-year transition period to allow plans submitted between July 1, 2024 and June 30, 2025 to utilize either the existing manuals, handbooks and guidance or the Virginia Stormwater Management Handbook, Versions 1.0 and 1.1. The Department previously announced its intent to rescind these guidance documents one year after the effective date of GM24-2001, the Virginia Stormwater Management Handbook (Handbook), Version 1.0 (July 1, 2024).
Guidance Document(s) for this Comment Forum
Document ID
Document Title
Current Document
Proposed Document
DCR-VSWCB-011
Virginia Stormwater Management Handbook
Document
To Be Deleted
DCR-VSWCB-013
Virginia Erosion and Sediment Control Handbook, Third Edition
Document
To Be Deleted
DCR-VSWCB-024
Guidance Document on Virginia Stormwater Management Program Site Inspection Strategies
Document
To Be Deleted
DCR-VSWCB-026
Guidance Document on Utilization of Nonpoint Nutrient Offsets
Document
To Be Deleted
GM14-2002
Implementation Guidance for the 2009 General Permit for Discharges of Stormwater from Construction Activities, 9VAC25-880
Document
To Be Deleted
GM14-2014
Implementation Guidance for Section 47 (time limits on applicability of approved design criteria) and Section 48 (grandfathering) of the Virginia Stormwater Management Program Regulation, 9VAC25-870
Document
To Be Deleted
GM15-2003
Postdevelopment Stormwater Management Implementation Guidance for Linear Utility Projects under the Virginia Stormwater Management Program Regulation, 9VAC25-870
Document
To Be Deleted
GM22-2011
Streamlined Plan Review for Construction Stormwater Plans and Erosion and Sediment Control Plans submitted by a Licensed Design Professional and reviewed by a Dual Combined Administrator for Erosion and Sediment Control and Stormwater Management
Document
To Be Deleted
GM22-2012
Stormwater Management and Erosion & Sediment Control Design Guide
Document
To Be Deleted
Contact Information
Name:
April Rhodes
Title:
Email:
april.rhodes@deq.virginia.gov
Address:
1111 East Main St. Suite 1400
PO Box 1105
City:
Richmond
State:
VA
Zip:
23218
Phone:
(571)866-6091 ext. 23219
Fax:
()-
Contact Information
ORM Review
ORM Approved (5/13/2025)
ORM Economic Review Form
posted: 4/30/2025
submitted to ORM: 4/30/2025
The Virginia Register
Publication Date: 6/2/2025
Volume: 41 Issue: 21
The public comment period is
In Progress!
closes at 11:59pm on
7/2/2025
View and Enter Comments
Planned Effective Date: 7/3/2025
X
ID
(You can leave this blank if your agency doesn't use custom document IDs)
Title
(a new row will be created in the table)
X
Key in part of a contact name, email address or street address and select your contact
View Guidance Documents