Action | Biomass Energy Generator General Permit (Rev. Cg) |
Stage | Proposed |
Comment Period | Ended on 1/5/2011 |
When speaking with DEQ Staff on Wednesday, Dec. 1st about the Biomass Energy Generator General Permit for a Pilot Test Facility, I was told that the Technical Advisory Committee recommended that the generator label should be 5 MW, yet when reading the regulation, the energy limit is 5 MW per year, indicating a generator label of 570.78 kW (Proof: 5,000,000 kWh per year / 8,760 hours per year). Which figure is actually being proposed? Afterall, there is a huge difference.