Proposed Text
The following words and terms when used in this chapter shall have the following meanings unless the context clearly indicates otherwise:
"Acre-foot" means a unit of volume equal to 43,560 cubic feet or 325,853 gallons (equivalent to one foot of depth over one acre of area).
"Agricultural purpose" means the production of an agricultural commodity as defined in § 3.2-3900 of the Code of Virginia that requires the use of impounded waters.
"Agricultural purpose dams" means impounding structures which are less than 25 feet in height or which create a maximum impoundment smaller than 100 acre-feet, and operated primarily for agricultural purposes.
"Alteration" means changes to an impounding structure that could alter or affect its structural integrity. Alterations include, but are not limited to, changing the height or otherwise enlarging the dam, increasing normal pool or principal spillway elevation or physical dimensions, changing the elevation or physical dimensions of the emergency spillway, conducting necessary structural repairs or structural maintenance, or removing the impounding structure. Structural maintenance does not include routine maintenance.
"Alteration permit" means a permit required for any alteration to an impounding structure.
"Annual average daily traffic" or "AADT" means the total volume of vehicle traffic of a highway or road for a year divided by 365 days and is a measure used in transportation planning and transportation engineering of how busy a road is.
"Board" means the Virginia Soil and Water Conservation Board.
"Conditional general permit" means the permit established pursuant to § 10.1-605.3 that is required for the operation and maintenance of a low hazard potential impounding structure with deficiencies.
"Conditional Operation and Maintenance Certificate" means a certificate required for high or significant hazard potential impounding structures with deficiencies.
"Construction" means the construction of a new impounding structure.
"Construction permit" means a permit required for the construction of a new impounding structure.
"Dam break inundation zone" means the area downstream of a dam that would be inundated or otherwise directly affected by the failure of a dam.
"Department" means the Virginia Department of Conservation and Recreation.
"Design flood" means the calculated volume of runoff and the resulting peak discharge utilized in the evaluation, design, construction, operation and maintenance of the impounding structure.
"Director" means the Director of the Department of Conservation and Recreation or his designee.
"Drill" means a type of emergency action plan exercise that tests, develops, or maintains skills in an emergency response procedure. During a drill, participants perform an in-house exercise to verify telephone numbers and other means of communication along with the owner's response. A drill is considered a necessary part of ongoing training.
"Emergency Action Plan or EAP" means a formal document that recognizes potential impounding structure emergency conditions and specifies preplanned actions to be followed to minimize loss of life and property damage. The EAP specifies actions the owner must take to minimize or alleviate emergency conditions at the impounding structure. It contains procedures and information to assist the owner in issuing early warning and notification messages to responsible emergency management authorities. It shall also contain dam break inundation zone maps as required to show emergency management authorities the critical areas for action in case of emergency.
"Emergency Action Plan Exercise" means an activity designed to promote emergency preparedness; test or evaluate EAPs, procedures, or facilities; train personnel in emergency management duties; and demonstrate operational capability. In response to a simulated event, exercises should consist of the performance of duties, tasks, or operations very similar to the way they would be performed in a real emergency. An exercise may include but not be limited to drills and tabletop exercises.
"Emergency Preparedness Plan" means a formal document prepared for Low Hazard impounding structures that provides maps and procedures for notifying owners of downstream property that may be impacted by an emergency situation at an impounding structure.
"Existing impounding structure" means any impounding structure in existence or under a construction permit prior to July 1, 2010.
"Freeboard" means the vertical distance between the maximum water surface elevation associated with the spillway design flood and the top of the impounding structure.
"General permit" means the permit established pursuant to § 10.1-605.3 that is required for the operation and maintenance of a low hazard potential impounding structure.
"Height" means the hydraulic height of an impounding structure. If the impounding structure spans a stream or watercourse, height means the vertical distance from the natural bed of the stream or watercourse measured at the downstream toe of the impounding structure to the top of the impounding structure. If the impounding structure does not span a stream or watercourse, height means the vertical distance from the lowest elevation of the downstream limit of the barrier to the top of the impounding structure.
"Impounding structure" or "dam" means a man-made structure, whether a dam across a watercourse or structure outside a watercourse, used or to be used to retain or store waters or other materials. The term includes: (i) all dams that are 25 feet or greater in height and that create an impoundment capacity of 15 acre-feet or greater, and (ii) all dams that are six feet or greater in height and that create an impoundment capacity of 50 acre-feet or greater. The term "impounding structure" shall not include: (a) dams licensed by the State Corporation Commission that are subject to a safety inspection program; (b) dams owned or licensed by the United States government; (c) dams operated primarily for agricultural purposes which are less than 25 feet in height or which create a maximum impoundment capacity smaller than 100 acre-feet; (d) water or silt retaining dams approved pursuant to § 45.1-222 or 45.1-225.1 of the Code of Virginia; or (e) obstructions in a canal used to raise or lower water.
"Impoundment" means a body of water or other materials the storage of which is caused by any impounding structure.
"Life of the impounding structure" and "life of the project" mean that period of time for which the impounding structure is designed and planned to perform effectively, including the time required to remove the structure when it is no longer capable of functioning as planned and designed.
"Maximum impounding capacity" means the volume of water or other materials in acre-feet that is capable of being impounded at the top of the impounding structure.
"New construction" means any impounding structure issued a construction permit or otherwise constructed on or after July 1, 2010.
"Normal or typical water surface elevation" means the water surface elevation at the crest of the lowest ungated outlet from the impoundment or the elevation of the normal pool of the impoundment if different than the water surface elevation at the crest of the lowest ungated outlet. For calculating sunny day failures for flood control impounding structures, stormwater detention impounding structures, and related facilities designed to hold back volumes of water for slow release, the normal or typical water surface elevation shall be measured at the crest of the auxiliary or emergency spillway.
"Operation and Maintenance Certificate" means a certificate required for the operation and maintenance of all high or significant hazard potential impounding structures.
"Owner" means the owner of the land on which an impounding structure is situated, the holder of an easement permitting the construction of an impounding structure and any person or entity agreeing to maintain an impounding structure. The term "owner" may include the Commonwealth or any of its political subdivisions, including but not limited to sanitation district commissions and authorities, any public or private institutions, corporations, associations, firms or companies organized or existing under the laws of this Commonwealth or any other state or country, as well as any person or group of persons acting individually or as a group.
"Planned land use" means land use that has been approved by a locality or included in a master land use plan by a locality, such as in a locality's comprehensive land use plan.
"Spillway" means a structure to provide for the controlled release of flows from the impounding structure into a downstream area.
"Stage I Condition" means a flood watch or heavy continuous rain or excessive flow of water from ice or snow melt.
"Stage II Condition" means a flood watch or emergency spillway activation or impounding structure overtopping where a failure may be possible.
"Stage III Condition" means an emergency spillway activation or impounding structure overtopping where imminent failure is probable.
"Sunny day dam failure" means the failure of an impounding structure with the initial water level at the normal reservoir level, usually at the lowest ungated principal spillway elevation or the typical operating water level.
"Tabletop Exercise" means a type of emergency action plan exercise that involves a meeting of the impounding structure owner and the state and local emergency management officials in a conference room environment. The format is usually informal with minimum stress involved. The exercise begins with the description of a simulated event and proceeds with discussions by the participants to evaluate the EAP and response procedures and to resolve concerns regarding coordination and responsibilities.
"Top of the impounding structure" means the lowest point of the nonoverflow section of the impounding structure.
"Watercourse" means a natural channel having a well-defined bed and banks and in which water normally flows.
A. Impounding structures shall be classified in one of three hazard classifications as defined in subsection B of this section and Table 1.
B. For the purpose of this chapter, hazards pertain to potential loss of human life or damage to the property of others downstream from the impounding structure in event of failure or faulty operation of the impounding structure or appurtenant facilities. Hazard potential classifications of impounding structures are as follows:
1. High Hazard Potential is defined where an impounding structure failure will cause probable loss of life or serious economic damage. "Probable loss of life" means that impacts will occur that are likely to cause a loss of human life, including but not limited to impacts to residences, businesses, other occupied structures, or major roadways. Economic damage may occur to, but not be limited to, building(s), industrial or commercial facilities, public utilities, major roadways, railroads, personal property, and agricultural interests. "Major roadways" include, but are not limited to, interstates, primary highways, high-volume urban streets, or other high-volume roadways, except those having an AADT volume of 400 vehicles or less in accordance with 4VAC50-20-45.
2. Significant Hazard Potential is defined where an impounding structure failure may cause the loss of life or appreciable economic damage. "May cause loss of life" means that impacts will occur that could cause a loss of human life, including but not limited to impacts to facilities that are frequently utilized by humans other than residences, businesses, or other occupied structures, or to secondary roadways. Economic damage may occur to, but not be limited to, building(s), industrial or commercial facilities, public utilities, secondary roadways, railroads, personal property, and agricultural interests. "Secondary roadways" include, but are not limited to, secondary highways, low-volume urban streets, service roads, or other low-volume roadways, except those having an AADT volume of 400 vehicles or less in accordance with 4VAC50-20-45.
3. Low Hazard Potential is defined where an impounding structure failure would result in no expected loss of life and would cause no more than minimal economic damage. "No expected loss of life" means no loss of human life is anticipated.
C. To support the appropriate hazard potential classification, dam break analysis shall be conducted by the owner's engineer or the department in accordance with one of the following alternatives and utilizing procedures set out in 4VAC50-20-54.
1. The owner of an impounding structure that does not currently hold a regular or conditional certificate or a conditional or general permit from the board, or the owner of an impounding structure that is already under certificate or general permit but the owner believes that a condition has changed downstream of the impounding structure that may reduce its hazard potential classification, may request in writing that the department conduct a simplified dam break inundation zone analysis to determine whether the impounding structure has a low hazard potential classification. The owner shall pay a fee to the department in accordance with 4VAC50-20-395 for conducting each requested analysis. The department shall address requests in the order received and shall strive to complete analysis within 90 days; or
2. The owner may propose a hazard potential classification that shall be subject to approval by the board. To support the proposed hazard potential classification, an analysis shall be conducted by the owner's engineer and submitted to the department. The hazard potential classification shall be certified by the owner.
D. Findings of the analysis conducted pursuant to subsection C of this section shall result in one of the following actions:
1. For findings by the department resulting from analyses conducted in accordance with subdivision C 1 of this section:
a. If the department finds that the impounding structure appears to have a low hazard potential classification, the owner may be is eligible for general permit coverage in accordance with 4VAC50-20-103 4VAC50-20-503.
b. If the department finds that the impounding structure appears to have a high or significant hazard potential classification, the owner's engineer shall provide further analysis in accordance with the procedures set out in 4VAC50-20-54 and this chapter. The owner may be eligible for grant assistance from the Dam Safety, Flood Prevention and Protection Assistance Fund in accordance with Article 1.2 (§ 10.1-603.16 et seq.) of Chapter 6 of Title 10.1 of the Code of Virginia.
2. For findings by the owner's engineer resulting from analyses conducted in accordance with subdivision C 2 of this section:
a. If the engineer finds that the impounding structure has a low hazard potential classification, the owner may be is eligible for general permit coverage in accordance with 4VAC50-20-103 4VAC50-20-503; or
b. If the engineer finds that the impounding structure appears to have a high or significant hazard potential classification, then the owner shall comply with the applicable certification requirements set out in this chapter.
E. An incremental damage analysis in accordance with 4VAC50-20-52 may be utilized as part of a hazard potential classification by the owner's engineer.
F. Impounding structures shall be subject to reclassification by the board as necessary.
A. Dam break inundation zone maps and analyses shall be provided to the department, except as provided for in 4VAC50-20-51, to meet the requirements set out in 4VAC50-20-40, and 4VAC50-20-175, and 4VAC50-20-177, as applicable. In accordance with subsection G of this section, a simplified dam break inundation zone map and analysis may be completed by the department and shall be provided to the impounding structure's owner to assist such owner in complying with the requirements of this chapter. All analyses shall be completed in accordance with 4VAC50-20-20 D.
B. The location of the end of the inundation mapping should be indicated where the water surface elevation of the dam break inundation zone and the water surface elevation of the spillway design flood during an impounding structure nonfailure event converge to within one foot of each other. The inundation maps shall be supplemented with water surface profiles showing the peak water surface elevation prior to failure and the peak water surface elevation after failure.
C. All inundation zone map(s) shall be signed and sealed by a licensed professional engineer.
D. Present and planned land-use for which a development plan has been officially approved by the locality in the dam break inundation zones downstream from the impounding structure shall be considered in determining the classification.
E. For determining the hazard potential classification, an analysis including, but not limited to, those hazards created by flood and nonflood dam failures shall be considered. At a minimum, the following shall be provided to the department:
1. A sunny day dam break analysis utilizing the volume retained at the normal or typical water surface elevation of the impounding structure;
2. A dam break analysis utilizing the spillway design flood with a dam failure;
3. An analysis utilizing the spillway design flood without a dam failure; and
4. A dam break analysis utilizing the probable maximum flood with a dam failure.
F. To meet the Emergency Action Plan requirements set out in 4VAC50-20-175 and the Emergency Preparedness Plan requirements set out in 4VAC50-20-177, all owners of high or significant hazard potential impounding structures shall provide dam break inundation zone map(s) representing the impacts that would occur with both a sunny day dam failure and a probable maximum flood with a dam failure.
1. The map(s) shall be developed at a scale sufficient to graphically display downstream inhabited areas and structures, roads, public utilities that may be affected, and other pertinent structures within the identified inundation area. In coordination with the local organization for emergency management, a list of downstream inundation zone property owners and occupants, including telephone numbers may be plotted on the map or may be provided with the map for reference during an emergency.
2. Each map shall include the following statement: "The information contained in this map is prepared for use in notification of downstream property owners by emergency management personnel."
Should the department prepare a dam break inundation zone map and analysis in response to a request received pursuant to 4VAC50-20-40 C, the owner shall utilize this map to prepare a plan in accordance with this subsection.
G. Upon receipt of a written request in accordance with 4VAC50-20-40 C and receipt of a payment in accordance with 4VAC50-20-395, the department shall conduct a simplified dam break inundation zone analysis. In conducting the analysis, a model acceptable to the department shall be utilized. The analysis shall result in maps produced as Geographic Information System shape files for viewing and analyzing and shall meet the other analysis criteria of this section.
Upon completion of the analysis, the department shall issue a letter to the owner communicating the results of the analysis including the dam break inundation zone map, stipulating the department's finding regarding hazard potential classification based on the information available to the department, and explaining what the owner needs to do procedurally with this information to be compliant with the requirements of the Dam Safety Act (§ 10.1-604 et seq.) and this chapter.
For each certificate or general permit issued, the impounding structure owner shall send a copy of the certificate or general permit to the appropriate local government(s) with planning and zoning responsibilities. A project description and the any map(s) required under 4VAC50-20-54 showing the area that could be affected by the impounding structure failure shall be submitted with the certificate or general permit. The department will provide a standard form cover letter for forwarding the certificate copy or general permit and accompanying materials.
A. Prior to preparing the complete design report for a Construction Permit, applicants may submit a preliminary design report to the department to determine if the project concept is acceptable to the department. The preliminary design report should contain, at a minimum, a general description of subdivisions 1 through 12 of subsection B of this section and subdivisions 1 and 2 of this subsection:
1. Proposed design criteria and a description of the size of the impounding structure, ground cover conditions, extent of current upstream development within the watershed and the hydraulic, hydrological and structural features, geologic conditions and the geotechnical engineering assumptions used to determine the foundation, impoundment rim stability and materials to be used.
2. Preliminary drawings of a general nature, including cross sections, plans and profiles of the impounding structure, proposed pool levels and types of spillway(s).
B. An applicant for a Construction Permit shall submit a design report. A form for the design report is available from the department (Design Report for the Construction or Alteration of Virginia Regulated Impounding Structures). The design report shall be prepared in accordance with 4VAC50-20-240. The design report is a required element of a complete application for a Construction Permit and shall include the following information:
1. Project information including a description of the proposed construction, name of the impounding structure, inventory number if available, name of the reservoir, and the purpose of the reservoir.
2. The proposed hazard potential classification in conformance with Table 1 of 4VAC50-20-50.
3. Location of the impounding structure including the city or county, number of feet or miles upstream or downstream of a highway and the highway number, name of the river or the stream, and the latitude and longitude.
4. Owner's name or representative if corporation, mailing address, residential and business telephone numbers, and other means of communication.
5. Owner's engineer's name, firm, professional engineer Virginia number, mailing address, and business telephone number.
6. Impounding structure data including type of material (earth, concrete, masonry or other) and the following design configurations:
a. Top of impounding structure (elevation);
b. Downstream toe – lowest (elevation);
c. Height of impounding structure (feet);
d. Crest length – exclusive of spillway (feet);
e. Crest width (feet);
f. Upstream slope (horizontal to vertical); and
g. Downstream slope (horizontal to vertical).
7. Reservoir data including the following:
a. Maximum capacity (acre-feet);
b. Maximum pool (elevation);
c. Maximum pool surface area (acres);
d. Normal capacity (acre-feet);
e. Normal pool (elevation);
f. Normal pool surface area (acres); and
g. Freeboard (feet).
8. Spillway data including the type, construction material, design configuration, and invert elevation for the low level drain, the principal spillway, and the emergency spillway.
9. Watershed data including drainage area (square miles); type and extent of watershed development; time of concentration (hours); routing procedure; spillway design flood used and state source; design inflow hydrograph volume (acre-feet), peak inflow (cfs), and rainfall duration (hours); and freeboard during passage of the spillway design flood (feet).
10. A description of properties located in the dam break inundation zone downstream from the site of the proposed impounding structure, including the location and number of structures, buildings, roads, utilities and other property that would be endangered should the impounding structure fail.
11. Evidence that the local government or governments have been notified of the proposal by the owner to build an impounding structure.
12. Maps showing the location of the proposed impounding structure that include: the county or city in which the proposed impounding structure would be located, the location of roads and access to the site, and the outline of the impoundment. Existing aerial photographs or existing topographic maps may be used for this purpose.
13. A report of the geotechnical investigations of the foundation soils, bedrock, or both and of the materials to be used to construct the impounding structure.
14. Design assumptions and analyses sufficient to indicate that the impounding structure will be stable during its construction and during the life of the impounding structure under all conditions of impoundment operations, including rapid filling, flood surcharge, seismic loadings, and rapid drawdown of the impoundment.
15. Evaluation of the stability of the impoundment rim area to safeguard against impoundment rim slides of such magnitude as to create waves capable of overtopping the impounding structure and evaluation of rim stability during seismic activity.
16. Design assumptions and analyses sufficient to indicate that seepage in, around, through or under the impounding structure, foundation and abutments will be reasonably and practically controlled so that internal or external forces or results thereof will not endanger the stability and integrity of the impounding structure. The design report shall also include information on graded filter design.
17. Calculations and assumptions relative to hydraulic and structural design of the spillway or spillways and energy dissipater or dissipaters. Spillway capacity shall conform to the criteria of Table 1 and 4VAC50-20-52.
18. Provisions to ensure that the impounding structure and appurtenances will be protected against unacceptable deterioration or erosion due to freezing and thawing, wind, wave action, and rain or any combination thereof.
19. Other pertinent design data, assumptions and analyses commensurate with the nature of the particular impounding structure and specific site conditions, including when required by this chapter, a plan and water surface profile of the dam break inundation zone.
20. A description of the techniques to be used to divert stream flow during construction so as to prevent hazard to life, health and property, including a detailed plan and procedures to maintain a stable impounding structure during storm events, a drawing showing temporary diversion devices, and a description of the potential impoundment during construction. Such diversion plans shall also be in accordance with applicable environmental laws.
21. A plan for project construction monitoring and quality control testing to confirm that construction materials and performance standards meet the design requirements set forth in the specifications.
22. Plans and specifications as required by 4VAC50-20-310.
23. Certification by the owner's engineer that the information provided pursuant to this subsection is true and correct in their professional judgment. Such certification shall include the engineer's signature, printed name, Virginia number, date, and the engineer's Virginia seal.
24. Owner's signature certifying receipt of the information provided pursuant to this subsection.
C. A plan of construction is a required element of a complete permit application for a Construction Permit and shall include:
1. A construction sequence with milestones.
2. Elements of the work plan that should be considered include, but are not limited to, foundation and abutment treatment, stream or river diversion, excavation and material fill processes, phased fill and compaction, testing and control procedures, construction of permanent spillway and drainage devices.
3. The erosion and sediment control plan, as approved by the local government, which minimizes soil erosion and sedimentation during all phases of construction.
4. The stormwater management plan or stormwater management facility plan, as approved by the local government, if the impounding structure is a stormwater management best management practice.
D. A Temporary Emergency Action Plan is a required element of a complete application for a Construction Permit and shall include:
1. A notification list of state and local emergency response agencies;
2. Provisions for notification of potentially affected residences and structures;
3. Construction site evacuation routes; and
4. Any other special notes particular to the project.
E. Within 120 days of receipt of a complete Construction Permit Application the board shall act on the application. If the application is not acceptable, the director shall inform the applicant within 60 days of receipt and shall explain what changes are required for an acceptable application. A complete Construction Permit Application consists of the following:
1. A final design report, submitted on the department form (Design Report for the Construction or Alteration of Virginia Regulated Impounding Structures), with attachments as needed, and certified by the owner and the owner's engineer;
2. A plan of construction that meets the requirements of subsection C of this section; and
3. A Temporary Emergency Action Plan that meets the requirements of subsection D of this section.
F. Prior to and during construction the owner shall provide the director with any proposed changes from the approved design, plans, specifications, or plan of construction. Approval shall be obtained from the director prior to the construction or installation of any changes that will affect the integrity or impounding capacity of the impounding structure.
G. The Construction Permit shall be valid for the plan of construction specified in the Construction Permit Application.
H. Construction must commence within two years after the permit is issued. If construction does not commence within two years after the permit is issued, the permit shall expire, except that the applicant may petition the board for extension of the two-year period and the board may extend such period for good cause with an appropriately updated plan of construction and Temporary Emergency Action Plan.
I. The board, the director, or both may take any necessary action consistent with the Dam Safety Act (§ 10.1-604 et seq. of the Code of Virginia) if any terms of this section or of the permit are violated, if the activities of the owner are not in accordance with the approved plans and specifications, if construction is conducted in a manner hazardous to downstream life or property, or for other cause as described in the Act.
J. Within 90 days after completion of the construction of an impounding structure, the owner shall submit:
1. A complete set of record drawings signed and sealed by a licensed professional engineer and signed by the owner:
2. A complete Record Report (Record Report for Virginia Regulated Impounding Structures) signed and sealed by a licensed professional engineer and signed by the owner that includes:
a. Project information including the name and inventory number of the structure, name of the reservoir, and whether the report is associated with a new or old structure;
b. Location of the impounding structure including the city or county, number of feet or miles upstream or downstream of a highway and the highway number, name of the river or the stream, and the latitude and longitude;
c. Owner's name or representative if corporation, mailing address, residential and business telephone numbers, and other means of communication;
d. Information on the design report, including who it was prepared by, the date of design report preparation, whether it was for new construction or for an alteration, and the permit issuance date;
e. Owner's engineer's name, firm, professional engineer Virginia number, mailing address, and business telephone number;
f. Impounding structure data including type of material (earth, concrete, masonry or other) and the following configurations:
(1) Top of impounding structure (elevation);
(2) Downstream toe – lowest (elevation);
(3) Height of impounding structure (feet);
(4) Crest length – exclusive of spillway (feet);
(5) Crest width (feet);
(6) Upstream slope (horizontal to vertical); and
(7) Downstream slope (horizontal to vertical).
g. Reservoir data including the following:
(1) Maximum capacity (acre-feet);
(2) Maximum pool (elevation);
(3) Maximum pool surface area (acres);
(4) Normal capacity (acre-feet);
(5) Normal pool (elevation);
(6) Normal pool surface area (acres); and
(7) Freeboard (feet).
h. Spillway data including the type, construction material, design configuration, and invert elevation for the low level drain, the principal spillway, and the emergency spillway; a description of the low level drain and principal spillway including dimensions, trash guard information, and orientation of intake and discharge to impounding structure if looking downstream; and a description of the emergency spillway including dimensions and orientation to impounding structure if looking downstream;
i. Watershed data including drainage area (square miles); type and extent of watershed development; time of concentration (hours); routing procedure; spillway design flood used and state source; design inflow hydrograph volume (acre-feet), peak inflow (cfs), and rainfall duration (hours); and freeboard during passage of the spillway design flood (feet);
j. Impounding structure history including the date construction was completed, who it was designed by and the date, who it was built by and the date, who performed inspections and dates, description of repairs, and confirmation as to whether the impounding structure has ever been overtopped;
k. A narrative describing the impounding structure procedures for operation, maintenance, filling, emergency action plan implementation, and structure evaluation;
l. A narrative describing the hydraulic and hydrologic data on the spillway design flood, hydrologic records, flood experience, flood potential, reservoir regulation, and comments or recommendations regarding these attributes;
m. A narrative describing stability of the foundation and abutments, embankment materials, and a written evaluation of each;
n. A complete set of record drawings signed and sealed by a licensed professional engineer and signed by the owner;
o. Certification by the owner's engineer that the information provided pursuant to subdivision J 2 of this section is true and correct in their professional judgment. Such certification shall include the engineer's signature, printed name, Virginia number, date, and the engineer's Virginia seal; and
p. Owner's signature certifying receipt of the information provided pursuant to subdivision J 2 of this section.
3. Certification from the licensed professional engineer who has monitored construction of the impounding structure during construction that, to the best of the engineer's judgment, knowledge and belief, the impounding structure and its appurtenances were constructed in conformance with the plans, specifications, drawings and other requirements approved by the board;
4. Operation and Maintenance Certificate Application (Operation and Maintenance Certificate Application for Virginia Regulated Impounding Structures) in accordance with 4VAC50-20-105 or a registration statement submitted in accordance with 4VAC50-20-502; and
5. Emergency Action Plan or Emergency Preparedness Plan in accordance with 4VAC50-20-175 or 4VAC50-20-177.
K. Upon completion of construction, the impoundment may be filled upon board issuance of an Operation and Maintenance Certificate or a general permit.
A. Prior to the transfer of ownership of a permitted impounding structure the permittee shall notify the director in writing and the new owner shall file a transfer notification with the department. A form for the transfer notification is available from the department (Transfer of Impounding Structure Notification form Past Owner to New Owner). The new owner shall amend the existing permit application as necessary and shall certify to the director that he is aware of and will comply with all of the requirements and conditions of the permit.
B. The transfer notification shall include the following required information:
1. Project information including the name and inventory number of the structure, name of the reservoir, and impoundment hazard classification;
2. Location of the impounding structure including the city or county, number of feet or miles upstream or downstream of a highway and the highway number, name of the river or the stream, and the latitude and longitude;
3. Type of certificates and permits to be transferred including effective date and expiration date of all certificates and permits;
4. Past owner's name, mailing address, and residential and business telephone numbers;
5. New owner's name, mailing address, and residential and business telephone numbers;
6. Request to transfer certification statement signed and dated by the past owner;
7. Certification of compliance with permit or certificate with all said terms and conditions signed and dated by the new owner; and
8. Contact information updates for Emergency Action Plan or Emergency Preparedness Plan provided by the new owner. Such updates shall include the name, mailing address, and residential and business telephone numbers for the impounding structure owner, impounding structure operator, rainfall and staff gage observer, and alternate observer.
Any impounding structure owner whose registration statement is approved by the board will receive the following permit and shall comply with the requirements in it. If the failure of a low hazard potential impounding structure is not expected to cause loss of human life or economic damage to any property except property owned by the owner, the owner may follow the special criteria established for certain low hazard impounding structures in accordance with 4VAC50-20-51 in lieu of coverage under the general permit.
General Permit No.: Dam Safety 1
Effective Date: (Date of Issuance of Coverage)
Expiration Date: (6 years following Date of Issuance of Coverage)
GENERAL PERMIT FOR OPERATION OF A LOW HAZARD POTENTIAL IMPOUNDING STRUCTURE
In compliance with the provisions of the Dam Safety Act and attendant regulations, owners of an impounding structure covered by this permit are authorized to operate and maintain a low hazard potential impounding structure. The owner shall be subject to the following requirements as set forth herein.
1. The spillway design of the owner's impounding structure shall be able to safely pass a 100-year flood. When appropriate, the spillway design flood requirement may be further reduced to the 50-year flood in accordance with an incremental damage analysis conducted by the owner's engineer.
2. The owner shall develop and maintain an emergency preparedness plan in accordance with 4VAC50-20-177. The owner shall update and resubmit the emergency preparedness plan immediately upon becoming aware of necessary changes to keep the plan workable.
3. The owner shall perform an annual inspection of the impounding structure. The owner shall maintain such records and make them available to the department upon request. The department also shall conduct inspections as necessary in accordance with 4VAC50-20-180.
4. The owner shall ensure that the impounding structure is properly and safely maintained and operated and shall have the following documents available for inspection upon request of the department:
a. An operating plan and schedule including narrative on the operation of control gates and spillways and the impoundment drain;
b. For earthen embankment impounding structures, a maintenance plan and schedule for the embankment, principal spillway, emergency spillway, low-level outlet, impoundment area, downstream channel, and staff gages; and
c. For concrete impounding structures, a maintenance plan and schedule for the upstream face, downstream face, crest of dam, galleries, tunnels, abutments, spillways, gates and outlets, and staff gages.
Impounding structure owners shall not permit growth of trees and other woody vegetation and shall remove any such vegetation from the slopes and crest of embankments and the emergency spillway area, and within a distance of 25 feet from the toe of the embankment and abutments of the dam.
5. The owner shall file a dam break inundation zone map developed in accordance with 4VAC50-20-54 with the department and with the offices with plat and plan approval authority or zoning responsibilities as designated by the locality for each locality in which the dam break inundation zone resides.
6. The owner shall notify the department immediately of any change in circumstances that would cause the impounding structure to no longer qualify for coverage under the general permit. In the event of a failure or an imminent failure of the impounding structure, the owner shall immediately notify the local emergency services coordinator, the Virginia Department of Emergency Management, and the department. The department shall take actions in accordance with § 10.1-608 or 10.1-609 of the Code of Virginia, depending on the degree of hazard and the imminence of failure caused by the unsafe condition.
A. Pursuant to § 10.1-605.3, an impounding structure owner may seek general permit coverage from the board for a low hazard potential impounding structure in lieu of obtaining a Low Hazard Potential Regular Operation and Maintenance Certificate in accordance with 4VAC50-20-105 or a Conditional Operation and Maintenance Certificate for Low Hazard Potential impounding structures in accordance with 4VAC50-20-150.
B. An owner shall submit a complete and accurate registration statement in accordance with the requirements of this section prior to the issuance of coverage under the general permit. A complete registration statement shall include the following:
1. The name and address of the owner;
2. The location of the impounding structure;
3. The height of the impounding structure;
4. The volume of water impounded;
5. An Emergency Preparedness Plan prepared in accordance with 4VAC50-20-101;
6. The applicable fee for the processing of registration statements as set out in 4VAC50-20-375;
7. A dam break inundation zone map completed in accordance with 4VAC50-20-54 and evidence that such map has been filed with the offices with plat and plan approval authority or zoning responsibilities as designated by the locality for each locality in which the dam break inundation zone resides; and
8. A certification from the owner that the impounding structure (i) is classified as low hazard pursuant to a determination by the department or the owner's professional engineer in accordance with § 10.1-604.1 and this chapter; (ii) is, to the best of his knowledge, properly and safely constructed and currently has no observable deficiencies; and (iii) shall be maintained and operated in accordance with the provisions of the general permit.
A. Holders of a regular certificate to operate a low hazard potential impounding structure shall be eligible for general permit coverage upon the expiration of their regular certificate. In lieu of a regular certificate renewal, registration coverage materials pursuant to 4VAC50-20-102 shall be submitted to the department 90 days prior to the expiration of the regular certificate.
B. Holders of a conditional certificate to operate a low hazard potential impounding structure shall be eligible for general permit coverage upon satisfying the registration requirements for a general permit pursuant to 4VAC50-20-102.
Provided that an impounding structure's hazard potential classification does not change, an owner's coverage under the general permit shall be for a six-year term after which time the owner shall reapply for coverage by filing a new registration statement and paying the necessary fee. No inspection of the impounding structure by a licensed professional engineer shall be required if the owner certifies at the time of general permit coverage renewal that conditions at the impounding structure and downstream are unchanged. If such certification is made, the owner is not required to submit an updated dam break inundation zone map.
A. A Regular Operation and Maintenance Certificate is required for an a high or significant hazard potential impounding structure. Such six-year certificates shall include the following based on hazard classification:
1. High Hazard Potential Regular Operation and Maintenance Certificate; or
2. Significant Hazard Potential Regular Operation and Maintenance Certificate; or
3. Low Hazard Potential Regular Operation and Maintenance Certificate.
B. The owner of an a high or significant hazard potential impounding structure shall apply for the renewal of the six-year Regular Operation and Maintenance Certificate 90 days prior to its expiration. If a Regular Operation and Maintenance Certificate is not renewed as required, the board shall take appropriate enforcement action.
C. Any owner of an a high or significant hazard potential impounding structure that does not have a Regular Operation and Maintenance Certificate or any owner renewing a Regular Operation and Maintenance Certificate for a high or significant hazard potential impounding structure shall file an Operation and Maintenance Certificate Application. A form for the application is available from the department (Operation and Maintenance Certificate Application for Virginia Regulated Impounding Structures). Such application shall be signed by the owner and signed and sealed by a licensed professional engineer. The following information shall be submitted on or with the application:
1. The application shall include the following required information:
a. The name of structure and inventory number;
b. The proposed hazard potential classification;
c. Owner's name or representative if corporation, mailing address, residential and business telephone numbers, and other means of communication;
d. An operating plan and schedule including a narrative on the operation of control gates and spillways and the impoundment drain;
e. For earthen embankment impounding structures, a maintenance plan and schedule for the embankment, principal spillway, emergency spillway, low-level outlet, impoundment area, downstream channel, and staff gages;
f. For concrete impounding structures, a maintenance plan and schedule for the upstream face, downstream face, crest of dam, galleries, tunnels, abutments, spillways, gates and outlets, and staff gages;
g. An inspection schedule for operator inspection, maintenance inspection, technical safety inspection, and overtopping situations;
h. A schedule including the rainfall amounts, emergency spillway flow levels or storm event that initiates the Emergency Action or Preparedness Plan and the frequency of observations;
i. A statement as to whether or not the current hazard potential classification for the impounding structure is appropriate and whether or not additional work is needed to make an appropriate hazard potential designation;
j. For newly constructed or recently altered impounding structures, a certification from a licensed professional engineer who has monitored the construction or alteration of the impounding structure that, to the best of the engineer's judgment, knowledge, and belief, the impounding structure and its appurtenances were constructed or altered in conformance with the plans, specifications, drawings and other requirements approved by the board;
k. Certification by the owner's engineer that the Operation and Maintenance Certificate Application information provided pursuant to subdivision 1 of this subsection is true and correct in their professional judgment. Such certification shall include the engineer's signature, printed name, Virginia number, date, and the engineer's Virginia seal; and
l. Owner's signature certifying the Operation and Maintenance Certificate Application information provided pursuant to subdivision 1 of this subsection and that the operation and maintenance plan and schedule shall be conducted in accordance with this chapter.
2. An Inspection Report (Annual Inspection Report for Virginia Regulated Impounding Structures) in accordance with subsection E of this section;
3. An Emergency Action Plan in accordance with 4VAC50-20-175 or an Emergency Preparedness Plan in accordance with 4VAC50-20-177 and evidence that the required copies of such plan have been submitted to the local organization for emergency management and the Virginia Department of Emergency Management;
4. Any additional analysis determined necessary by the director, the board or the owner's engineer to address public safety concerns. Such additional analysis may include, but not be limited to, seismic stability, earthen spillway integrity, adequate freeboard allowance, stability assessment of the impoundment's foundation, potential liquefaction of the embankment, overturning or sliding of a concrete structure and other structural stress issues; and
5. If applicable, a current certification from the dam owner in accordance with 4VAC50-20-53.
D. If the Operation and Maintenance Certificate Application submittal is found to be not complete, the director shall inform the applicant within 30 days and shall explain what changes are required for an acceptable submission. Within 60 days of receipt of a complete application the board shall act upon the application. Upon finding that the impounding structure as currently operating is in compliance with this chapter, the board shall issue a Regular Operation and Maintenance Certificate. Should the board find that the impounding structure as currently operating is not in compliance with this chapter, the board may deny the permit certificate application or issue a Conditional Operation and Maintenance Certificate in accordance with 4VAC50-20-150.
E. Inspections shall be performed on an impounding structure annually.
1. Inspection Reports (Annual Inspection Report for Virginia Regulated Impounding Structures) signed and sealed by a licensed professional engineer shall be submitted to the department in accordance with the following schedule:
a. For a High Hazard Potential impounding structure, every two years;
b. For a Significant Hazard Potential impounding structure, every three years; or
c. For a Low Hazard Potential impounding structure, every six years; or
d. For a High Hazard Potential impounding structure, annually in accordance with 4VAC50-20-53, where applicable.
In years when an Inspection Report signed and sealed by a licensed professional engineer is not required, an owner shall submit the Annual Inspection Report for Virginia Regulated Impounding Structures.
2. The Inspection Report shall include the following required information:
a. Project information including the name and inventory number of structure, name of the reservoir, and purpose of the reservoir;
b. City or county where the impounding structure is located;
c. Owner's name or representative if corporation, mailing address, residential and business telephone numbers, and other means of communication;
d. Owner's engineer's name, firm, professional engineer Virginia number, mailing address, and business telephone number;
e. Inspection observation of the impounding structure including the following:
(1) Earthen embankment information including any embankment alterations; erosion; settlement, misalignments or cracks; seepage and seepage flow rate and location;
(2) Upstream slope information including notes on woody vegetation removed, rodent burrows discovered, and remedial work performed;
(3) Intake structure information including notes on deterioration of concrete structures, exposure of rebar reinforcement, need to repair or replace trash rack, any problems with debris in the reservoir, and whether the drawdown valve operated;
(4) Abutment contacts including notes on seepage and seepage flow rate and location;
(5) Earthen emergency spillway including notes on obstructions to flow and plans to correct, rodent burrows discovered, and deterioration in the approach or discharge channel;
(6) Concrete emergency spillway including notes on the deterioration of the concrete, exposure of rebar reinforcement, any leakage below concrete spillway, and obstructions to flow and plans to correct;
(7) Downstream slope information including notes on woody vegetation removed, rodent burrows discovered, whether seepage drains are working, and any seepage or wet areas;
(8) Outlet pipe information including notes on any water flowing outside of discharge pipe through the impounding structure and a description of any reflection or damage to the pipe;
(9) Stilling basin information including notes on the deterioration of the concrete, exposure of rebar reinforcement, deterioration of the earthen basin slopes, repairs made, and any obstruction to flow;
(10) Gates information including notes on gate malfunctions or repairs, corrosion or damage, and whether any gates were operated and if so how often and to what extreme;
(11) Reservoir information including notes on new developments upstream of the dam, slides or erosion of lake banks, and general comments to include silt, algae, or other influence factors;
(12) Instruments information including any reading of instruments and any installation of new instruments; and
(13) General information including notes on new development in the downstream dam break inundation zone that would impact hazard classification or spillway design flood requirements, the maximum stormwater discharge or peak elevation during the previous year, whether general maintenance was performed and when, and actions that need to be completed before the next inspection.
f. Evaluation rating of the impounding structure and appurtenances (excellent, good, or poor), general comments, and recommendations;
g. Certification by the owner and date of inspection; and
h. Certification and seal by the owner's engineer and date of inspection, as applicable.
F. The owner of an impounding structure shall notify the department immediately of any change in the use of the area downstream that would impose hazard to life or property in the event of failure.
A. During the review of any Operation and Maintenance Certificate Application (Operation and Maintenance Certificate Application for Virginia Regulated Impounding Structures) completed in accordance with 4VAC50-20-105 should the director determine that the impounding structure has nonimminent deficiencies, the director may recommend that the board issue a Conditional Operation and Maintenance Certificate.
B. The Conditional Operation and Maintenance Certificate for High, Significant, and Low Hazard Potential impounding structures shall be for a maximum term of two years. This certificate will allow the owner to continue normal operation and maintenance of the impounding structure, and shall require that the owner correct the deficiencies on a schedule approved by the board.
C. A Conditional Certificate may be extended in accordance with the procedures of 4VAC50-20-155 provided that Inspection Reports (Annual Inspection Report for Virginia Regulated Impounding Structures) are on file, and the board determines that the owner is proceeding with the necessary corrective actions.
D. Once the deficiencies are corrected, the board shall issue a Regular Operation and Maintenance Certificate based upon the impounding structure's meeting the requirements of 4VAC50-20-105.
A. Prior to the transfer of ownership of an impounding structure the certificate holder shall notify the director in writing and the new owner shall file a transfer notification with the department. A form for the transfer notification is available from the department (Transfer of Impounding Structure Notification from Past Owner to New Owner). The new owner may elect to continue the existing operation and maintenance certificate for the remaining term or he may apply for a new certificate in accordance with 4VAC50-20-105. If the owner elects to continue the existing certificate, he shall certify to the director that he is aware of and will comply with all of the requirements and conditions of the certificate.
B. The transfer notification shall include the following required information:
1. Project information including the name and inventory number of the structure, name of the reservoir, and impoundment hazard classification;
2. Location of the impounding structure including the city or county, number of feet or miles upstream or downstream of a highway and the highway number, name of the river or the stream, and the latitude and longitude;
3. Type of certificates and permits to be transferred including effective date and expiration date of all certificates and permits;
4. Past owner's name, mailing address, and residential and business telephone numbers;
5. New owner's name, mailing address, and residential and business telephone numbers;
6. Request to transfer certification statement signed and dated by the past owner;
7. Certification of compliance with permit or certificate with all said terms and conditions signed and dated by the new owner; and
8. Contact information updates for Emergency Action Plan or Emergency Preparedness Plan provided by the new owner. Such updates shall include the name, mailing address, and residential and business telephone numbers for the impounding structure owner, impounding structure operator, rainfall and staff gage observer, and alternate observer.
Low Hazard impounding structures shall provide information for emergency preparedness to the department, the local organization for emergency management coordinator and the Virginia Department of Emergency Management. A form for the submission is available from the department (Emergency Preparedness Plan for Low Hazard Virginia Regulated Impounding Structures). The information shall include, but not be limited, to the following:
1. Name and location information for the impounding structure including city or county and latitude and longitude;
2. Name of owner and operator and associated contact information including residential and business telephone numbers and other means of communication;
3. Contact information for relevant the local emergency responders including the following: management coordinator
a. Local dispatch center or centers governing the impounding structure's dam break inundation zone; and
b. City or county emergency services coordinator's name or names;
4. Procedures for notifying downstream property owners or occupants potentially impacted by the impounding structure's failure;
5. A dam break inundation zone map completed in accordance with 4VAC50-20-54 and evidence that:
a. Such map has been filed with the offices with plat and plan approval authority or zoning responsibilities as designated by the locality for each locality in which the dam break inundation zone resides; and
b. Required copies of such plan have been submitted to the local organization for emergency management and the Virginia Department of Emergency Management Identification of any downstream roadways that would be impacted by the impounding structure's failure; and
6. Certification of the accuracy of the plan by the owner that the plan is accurate and that the owner understands the responsibilities included in the plan.
The provisions of this chapter may be enforced by the board, the director, or both in any manner consistent with the provisions of the Dam Safety Act (§ 10.1-604 et seq. of the Code of Virginia). Failure to comply with the provisions of the general permit issued in accordance with 4VAC50-20-103 4VAC50-20-503 may result in enforcement actions, including penalties assessed in accordance with §§ 10.1-613.1 and 10.1-613.2.
A. Effective September 26, 2008, fees for all application submittals required pursuant to 4VAC50-20-370 through 4VAC50-20-390 are due prior to issuance of a certificate or permit. No application for an Operation and Maintenance Certificate or , a Construction Permit, or a general permit will be acted upon by the board without full payment of the required fee per § 10.1-613.5 of the Code of Virginia.
B. Fees shall be paid by check, draft or postal money order payable to the Treasurer of Virginia, or submitted electronically (if available), and must be in U.S. currency, except that agencies and institutions of the Commonwealth of Virginia may submit Interagency Transfers for the amount of the fee. All fees shall be sent to the following address (or submitted electronically, if available): Virginia Department of Conservation and Recreation, Division of Finance, Accounts Payable, 203 Governor Street, 4th Floor 600 East Main Street, 24th floor, Richmond, Virginia 23219.
C. All fee payments shall be accompanied by the following information:
1. Applicant name, address and daytime phone number.
2. The name of the impounding structure, and the impounding structure location.
3. The type of application or report submitted.
4. Whether the submittal is for a new permit or certificate issuance or permit or certificate reissuance.
5. The amount of fee submitted.
6. Impounding structure identification number, if applicable.
D. No permit fees remitted to the department shall be subject to refund except as credits provided for in 4VAC50-20-390 C.
Impounding structures owned by Virginia Soil and Water Conservation Districts shall be exempt from all fees associated with this part in accordance with § 10.1-613.5 of the Code of Virginia. There will be no fee assessed for a low hazard impounding structure exempted from fees pursuant to 4VAC50-20-51 or 4VAC50-20-501 or for the decommissioning of an impounding structure.
A. The fee for processing registration statements from impounding structure owners seeking to obtain coverage under the general permit for low hazard impounding structures shall be $300.
B. There will be no fee assessed for a low hazard impounding structure exempted from fees pursuant to 4VAC50-20-51 and 4VAC50-20-501.
C. The fee for processing registration statements from impounding structure owners obtaining coverage under the conditional general permit for low hazard impounding structures shall be $200.
D. The board may allow a partial credit towards the general permit fee if the owner of the impounding structure has completed, to the director's satisfaction, the conditions of the conditional general permit prior to its expiration.
A. Any application for a six-year Regular Operation and Maintenance Certificate after September 26, 2008, except as otherwise exempted, shall be accompanied by a payment as determined in subsection B of this section.
B. Fees for High, or Significant, or Low Hazard Potential impounding structures shall be as follows:
1. $600 for High Hazard Potential.
2. $600 for Significant Hazard Potential.
3. $300 for Low Hazard Potential.
C. Fees for extension of Regular Operation and Maintenance Certificates shall be $250 per year or portion thereof.
A. Pursuant to § 10.1-605.3 the owner of a low hazard potential impounding structure shall apply for general permit coverage from the board in accordance with 4VAC50-20-502 except as provided for in 4VAC50-20-501.
B. Holders of a either a regular or conditional operation and maintenance certificate for a low hazard potential impounding structure shall be transitioned to general permit coverage upon the expiration of their certificate. In lieu of a certificate renewal, registration coverage materials pursuant to 4VAC50-20-502 shall be submitted to the department 90 days prior to the expiration of the certificate.
A. In accordance with § 10.1-605.3, should the failure of a low hazard potential impounding structure cause no expected loss of human life and no economic damage to any property except property owned by the impounding structure owner, then the owner may choose to meet the following requirements instead of the requirements specified in the general permit for low hazard impounding structures:
1. A licensed professional engineer certifies that the impounding structure is a low hazard potential impounding structure that will cause no expected loss of human life and no economic damage to any property except property owned by the impounding structure owner;
2. The owner of an impounding structure shall notify the local emergency management coordinator in the event of a failure or emergency condition at the impounding structure; however, no emergency preparedness plan prepared pursuant to 4VAC50-20-177 shall be required; and
3. The owner of an impounding structure shall perform inspections of the impounding structure annually in accordance with the requirements of 4VAC50-20-105.
B. No specific spillway design flood is required for a dam that meets the criteria established in subsection A of this section, although the recommended minimum spillway design flood is a 50-year flood.
C. Any owner of an impounding structure electing to utilize the requirements of subsection A of this section shall otherwise comply with all other requirements of this chapter applicable to low hazard impounding structures.
D. The owner shall notify the department immediately of any change in circumstances that would cause the impounding structure to no longer qualify to utilize the provisions of this section.
E. No certificate or permit fee established in this chapter shall be applicable to the impounding structure.
A. A complete and accurate registration statement shall be filed by the dam owner in accordance with the requirements of this section prior to the issuance of coverage under the general permit.
B. A complete registration statement shall include the following:
1. The name and address of the owner;
2. The location of the impounding structure;
3. The height of the impounding structure;
4. The volume of water impounded;
5. An Emergency Preparedness Plan prepared in accordance with 4VAC50-20-177;
6. The applicable fee for the processing of registration statements as set out in 4VAC50-20-375; and
7. A certification from the owner that the impounding structure (i) is classified as low hazard pursuant to a determination by the department or the owner's professional engineer in accordance with § 10.1-604.1 and this chapter; (ii) is, to the best of his knowledge, properly and safely constructed and currently has no observable deficiencies; and (iii) shall be maintained and operated in accordance with the provisions of the general permit.
Any impounding structure owner whose registration statement is approved by the board will receive the following permit and shall comply with the requirements in it.
General Permit No.: Dam Safety 1
Effective Date: (Date of Issuance of Coverage)
Expiration Date: (6 years following Date of Issuance of Coverage)
GENERAL PERMIT FOR OPERATION OF A LOW HAZARD POTENTIAL IMPOUNDING STRUCTURE
In compliance with the provisions of the Dam Safety Act and attendant regulations, owners of an impounding structure covered by this permit are authorized to operate and maintain a low hazard potential impounding structure. The owner shall be subject to the following requirements as set forth herein.
1. The spillway design of the owner's impounding structure shall be able to safely pass a 100-year flood. When appropriate, the spillway design flood requirement may be further reduced to the 50-year flood in accordance with an incremental damage analysis conducted by the owner's engineer.
2. The owner shall develop and maintain an emergency preparedness plan in accordance with 4VAC50-20-177. The owner shall update and resubmit the emergency preparedness plan immediately upon becoming aware of necessary changes to keep the plan workable.
3. The owner shall perform an annual inspection of the impounding structure. The owner shall maintain such records and make them available to the department upon request. The department also shall conduct inspections as necessary in accordance with 4VAC50-20-180.
4. The owner shall ensure that the impounding structure is properly and safely maintained and operated and shall have the following documents available for inspection upon request of the department:
a. An operating plan and schedule including narrative on the operation of control gates and spillways and the impoundment drain;
b. For earthen embankment impounding structures, a maintenance plan and schedule for the embankment, principal spillway, emergency spillway, low-level outlet, impoundment area, downstream channel, and staff gages; and
c. For concrete impounding structures, a maintenance plan and schedule for the upstream face, downstream face, crest of dam, galleries, tunnels, abutments, spillways, gates and outlets, and staff gages.
5. The owner shall not permit growth of trees and other woody vegetation and shall remove any such vegetation from the slopes and crest of embankments and the emergency spillway area, and within a distance of 25 feet from the toe of the embankment and abutments of the dam.
6. The owner shall notify the department immediately of any change in circumstances that would cause the impounding structure to no longer qualify for coverage under the general permit. In the event of a failure or an imminent failure of the impounding structure, the owner shall immediately notify the local emergency management coordinator, the Virginia Department of Emergency Management, and the department. The department shall take actions in accordance with § 10.1-608 or § 10.1-609 of the Code of Virginia, depending on the degree of hazard and the imminence of failure caused by the unsafe condition.
7 . In order to qualify for the protections established in § 10.1-606.3, the owner shall file a dam break inundation zone map developed in accordance with 4VAC50-20-54 with the department and with the offices with plat and plan approval authority or zoning responsibilities as designated by the locality for each locality in which the dam break inundation zone resides.
If the general permit registration statement submittal is found to be incomplete, the director shall inform the applicant within 30 days and shall explain what changes are required for an acceptable submission. Within 60 days of receipt of a complete registration statement, the board shall act upon the application. Upon finding that the impounding structure as currently operating is in compliance with this chapter, the board shall issue a general permit for low hazard potential impounding structures. Should the board find that the impounding structure as currently operating is not in compliance with this chapter, the board may deny the permit registration statement or issue a conditional general permit for low hazard potential impounding structures in accordance with 4VAC50-20-505.
A. During the review of any general permit for low hazard potential impounding structures issued in accordance with 4VAC50-20-502 should the director determine that the impounding structure has nonimminent deficiencies, the director may recommend that the board issue a conditional general permit for low hazard potential impounding structures.
B. Notwithstanding the provisions of 4VAC50-20-503, the conditional general permit for low hazard potential impounding structures shall be for a maximum term of two years. This permit will allow the owner to continue normal operation and maintenance of the impounding structure and shall require that the owner correct the deficiencies on a schedule approved by the board.
C. A conditional general permit for low hazard potential impounding structures may be extended provided that the owner submits a written request justifying an extension, the amount of time needed to comply with the requirements set out in the current conditional permit for low hazard potential impounding structures and any required fees. The owner must have demonstrated substantial and continual progress towards meeting the requirements of the conditional permit for low hazard potential impounding structures in order to receive an extension.
D. Once the deficiencies are corrected, the board shall issue a general permit for low hazard potential impounding structures upon the impounding structure’s meeting the requirements of 4VAC50-20-502.
A. Provided that an impounding structure's hazard potential classification does not change, an owner's coverage under the general permit shall be for a six-year term after which time the owner shall reapply for coverage by filing a new registration statement and paying the necessary fee.
B. No less than 90 days prior to the expiration of the general permit, the owner shall submit a complete registration statement as established in 4VAC50-20-502.
C. No inspection of the impounding structure by a licensed professional engineer shall be required if the owner certifies at the time of general permit coverage renewal that conditions at the impounding structure and downstream are unchanged.
A. Failure to comply with the provisions of the general permit issued in accordance with 4VAC50-20-503 or the provisions of a conditional general permit issued in accordance with 4VAC50-20-505 may result in enforcement actions pursued in accordance with the Dam Safety Act (§ 10.1-604 et seq.), including penalties assessed in accordance with §§ 10.1-613.1 and 10.1-613.2.
A. Prior to the transfer of ownership of a permitted impounding structure the permittee shall notify the director in writing and the new owner shall file a transfer notification with the department. A form for the transfer notification is available from the department (Transfer of Impounding Structure Notification form Past Owner to New Owner). The new owner shall amend the existing permit application as necessary and shall certify to the director that he is aware of and will comply with all of the requirements and conditions of the permit.
B. The transfer notification shall include the following required information:
1. Project information including the name and inventory number of the structure and name of the reservoir;
2. Location of the impounding structure including the city or county and the latitude and longitude;
3. Effective date and expiration date of the permit to be transferred;
4. Past owner’s name, mailing address, and residential and business telephone numbers;
5. New owner’s name, mailing address, and residential and business telephone numbers;
6. Request to transfer certification statement signed and dated by the past owner;
7. Certification of compliance with the permit terms and conditions signed and dated by the new owner; and
8. Contact information updates for the new owner including name, mailing address, and residential and business telephone numbers.